To Empty or Fill the g10 H2 Target
Rev 0
T.
Carstens Mar 29 2000,
S.
Christo May 21, 2004
To empty
the H2 target
Preparation:
1.
Confirmed
proper operations of the target.
2.
(page F1) Click on Default. Disable target alarms if they are on by clicking “OFF” under the
“VALID” box(s).
3.
Observe:
·
(page F4)
Pumps CVP and CVS are running and that valves FV_CVPS and FV_CVS are open.
·
(page
F5) Valves MV_H2S, FV_H2T, and MV_H2T are open.
4.
Record the following levels, temperatures, and pressures in the Target
logbook before starting the emptying process and after the target is empty.
·
(page
F4) PT_T, PT_CVS, TT_T, TT_ET, TT_EBP, and LT_CR.
·
(page
F5) H2 tank pressure, PT_H2S.
Procedures:
1.
(page
F1) Click on H2 Regulation or simply
press the F7 key.
2.
Click
inside the numeric field next to Set Point TT_ET.
3.
Enter
a set point of 30.00.
The
target will warm up and PT_T will
rise from ~1125 mB at 25C, ambient (1075mB at 0C.) to 1545 mB at 25C, ambient
(1495mB at 0 C.). The target
should empty in 20 minutes. When the pressure stops rising the target is empty.
To fill the
H2 target
Note:
Do not attempt to fill the target unless LT_CR > 70% ! Failure to do so may
cause the cryostat to empty and delay the run by up to 3 hours.
Preparation:
1.
Confirmed
proper operations of the target.
2.
Observe:
·
(page F4)
Pumps CVP and CVS are running and that valves FV_CVPS and FV_CVS are open.
·
(page
F5) Valves MV_H2S, FV_H2T, and MV_H2T are open.
3.
Record the following levels, temperatures, and pressures in the Target
logbook before starting the filling process and after the target is full.
·
(page
F4) PT_T, PT_CVS, TT_T, TT_ET, TT_EBP, and LT_CR.
·
(page
F5) H2 Tank pressure, PT_H2S.
Procedures:
1.
(page
F1) Click on H2 Regulation or simply
press the F7 key.
2.
Click
inside the numeric field next to Set Point TT_ET.
3.
Enter
a set point of 19.8.
Approximately 45 minutes to 1 hour is needed before enough gas condenses to be completely full; PT_T will decrease to ~ 1125 mB at 25C., ambient. When the target pressure stops falling the target is full. Record the appropriate values in the target logbook and continue with this procedure to turn on the alarms.
4. Press F1 to display the Main Menu.
5. Click on Default.
6. Click Valid “ON” for the Pressure alarm only.
7. (F4) The target graphic will change to magenta.