Minutes of the 19 September 1998 RadPhi Collaboration Meeting
H. Crannell, A. Dzierba, E. Frlez, J. Gunter, R. Jones, J. Kolata,
A. Longhi, P. Rubin, E. Scott, P. Smith, C. Steffen, S. Teige, R. Varner
October 13, 1998
Abstract
In preparation for a data run next year: a design for a level
1.5 trigger was shown and given the go-ahead; costing for 50 additional
LGD bases was presented and approved; prices for two CPV base designs were
discussed; and the JETSET BGV was selected for a reconfigured target
region. In addition, the status of the analysis of the past June's data
was summarized, and latest rate-taking capability estimates were presented.
Phil.prubin@richmond.edu
cation.cnn
October 13, 1998