Preliminary Run Program 4 December 1996 15:45am ================================================================================ SYSTEMS ABBREVIATION: Ac = Accelerator LEFT COLUMN SYMBOLS: BL = Beam line devices Tag = tagger magnet field on DC = Drift chambers Rad = tagger radiator in beam Ec = Electromagnetic calorimeter Tor = CLAS torus field Ta = Tagger Min = Mini-torus field TOF = TOF counters Tgt = CLAS target in beam Tr = Trigger + DAQ Tst = Test target in beam T R T M T T a a o i g s g d r n t t Estimated Systems 8-hour shifts Thursday 8:00am - - + - - - 1 Tune 2.4 GeV beam to Faraday cup 1 Ac, BL Check operation of Faraday cup 2 Optimize background rates vs beam steering 1 Ac, BL, tune beam counters all measure rates in detectors, observe events in CED 3 Tune lowest possible beam current ? (skip if background rate is acceptable ?) - - + - - + 4 Aluminium target in beam take data with different triggers 3-4 all Energy sum EC (low, high thr.), TOF (OR), EC.TOF, ... Saturday 8:00 - - - - - - 5 Change to CLAS target operation 2 Ac, BL, Hall B + - + - - - 6 Tune 2.4 GeV beam up to tagger dump 1 Ac, Ta, Sunday 8:00am BL + - + - - - 7 Measure background rates (from tagger dump) 0.5 all in CLAS and tagger detectors - - + - - - 8 Steer electron beam to Faraday cup 0.5 Ac, BL 9 Measure background levels in detectors 0.5 all - - + + + - 10 Mini-torus on Thin C target in (L < 10^33 cm^-2 s^-1 => 3 mg/cm^2 12C at 100nA) 11 Ramp up mini-torus current in steps of 500A 1 DC, TOF, up to 8000A, measure DC currents and EC rates in TOF, EC, DC, observe hits with CED 12 Electron triggers (Level 1): TOF, TR, TOF.EC EC 13 Vary EC energy threshold to get clean trigger 0.5 EC Check events using CLAS Event Display (CED) all Monday 8:00am 14 Take data with EC, TOF, TOF.EC to check 0.5 EC, TOF efficiencies 15 On-line histograms for diagnostics 16 Write data for off-line analysis: 4 all Various level 1 triggers (see trigger table) C and CH2 targets Vary DC gains ? (to be defined) Others (to be defined) 17 Test cluster finder for Level 2 (may not be available) - - - + + - 18 CLAS Torus off, Mini torus on Take data with minimum ionizing trigger 1 EC, TOF in EC, TOF for calibration - - - - + - 19 Torus off, Mini torus off 0.5 DC, EC, Very thin target (0.3 mg/cm^2, TOF L = 10^32/cm2sec) Test DC performance for alignment measurements with straight tracks, use minimum ionizing trigger, and various thresholds in EC + + - - - - 20 Tagger magnet on, radiator in, beam ctrs at Faraday cup: 2 Write data to check tagger counter timing, etc. =============================================================================== total 19 - 20 # scheduled run shifts 20.0