Summary of scheduled shifts: Operations: Shift Day Time 1st half 2nd half ----- --- ---- ---------- -------- 1 Thu day beam tuning 2 eve beam steering; T-counter HV (scalers) 3 Fri owl T/E counter timing (DAQ) RadPhi 4 day Pair Spec. tests RadPhi 5 eve Pair Spec./Pair Counter 6 Sat owl Pair Counter/Pair Spec. RadPhi 7 day TASC tuneup 8 eve Normalization test RadPhi 9 Sun owl Start Counter/TOF 10 day Start Counter/TOF 11 eve Background/Collimator tests 12 Mon owl RadPhi.................................... 13 day TBA 14 eve TBA 15 Tue owl RadPhi.................................... 16 day TBA 17 eve TBA 18 Wed owl RadPhi.................................... 19 day TBA 20 eve TBA 21 Thu owl RadPhi.................................... 22 day Photofission test (install/run) 23 eve Photofission test 24 Fri owl Photofission test 25 day Photofission test (contingency) 26 eve Photofission test (contingency) 27 Sat owl Photofission test (contingency)