E01-017 Run Information

E01-017(g6c) Preparation Check-List

Item Person In Charge Status Comments
ST booster HV Cable Ji Li, Lei Guo done
ST booster HV supply Carlos Salgado, Ji Li, Mina Nozar, Dennis Weygand The original Power Supply borrowed from Ashot was replaced with a LeCroy 4032A model. Cables are connected to the -800V connector on the tubes. Note, after the PS unit is turned on (after having been off for a while), the restore switch doesn't set the hv's to the previous set values and must be set again by hand for channels 0 through 5. At the moment, they are set at -750V each.
ST PMT base testing Carlos Salgado, Ji Li, Mina Nozar Cosmic ray signals look fine. The -800V are drawing currents.Detail see below*.
ST booster HV remote-control cable Carlos Salgado, Ji Li Mark Ito, Arne Freyberger
Radiator 2 x 10^-4 Ji Li, Carlos Salgado Arne Freyberger
E-counters (our region of interest: 1-100) Mina Nozar, Mike Wood, .... Light leak test done (No light leak observed). Wait for Phil, Mikhail and others to finish testing after installation of the pvc pipes.
T-counters (our region of interest: 1-12) Mina Nozar All 61 channels but channel 20 are working. LR coincidences checked, setting LR window at 10ns.
Forward carriage electronics Mina Nozar, Ji Li, Lei Guo Wiring and cable length checked(see running condition page for values). ASYNC2 disabled during g8 run due to large prescale factor g8 uses.
Beam pipe Ji Li David Kashy
L1 Trigger files Ji Li, Mina Nozar, Lei Guo Trigger files:
ASYNC2 trigger and delay files are at clon01:/usr/local/clas/parms/photon
Franz, Vardan Gyurjyan, Dave Doughty
Online monitoring routines Dennis Weygand
Matthieu Guillo

* Start Counter Booster Voltages/Currents from the CAN power supply unit.

Channel No. Cable No. Voltage (V) Read Back (uA) Limit (uA)
32 1 -800 / -700 2700 / 1279 2900
33 2 -800 / -700 2674 / 1246 2900
34 3 -800 / -700 2711 / 1327 2900
35 4 -800 / -700 2699 / 1337 2900
36 5 -800 / -700 2630 / 1309 2900
37 6 -800 / -700 2670 / 1331 2900
* Start Counter Booster Voltages from the LeCroy 4032A power supply unit.

HV Channel No. Cable No. Main HV channels
(vt100 terminal control (shift b))
Voltage (V)
0 1 12.2 -750
1 2 12.3 -750
2 3 12.4 -750
3 4 12.5 -750
4 5 12.6 -750
5 6 12.7 -750

ASYNC signal width and cable lengths (as measured by the pulsor)

Chnnel Width (ns) (Before/after delay) Cable length (ns)
MOR(1-61) 8.48/7.88 105
ST(1/3) 15.0/13.0 109
MOR(1-12) 7.53/7.13 102
ST(2/3) 13.2/13.1 113

Back to the 2001 Run Info. page
Back to E99-005/E01-017 main page