1.0 Introduction
2.0 General Issues
2.2 Radiation Safety and the Personnel Safety System
2.2.1 Induced Activity
2.2.2 Radiation Control Personnel
2.3 AC Power
2.4 LCW Operations
2.4.1 Normal Operations
2.4.2 Maintenance
2.5 Fire
2.6 Mechanical
2.6.1 Crane
2.6.2 Carriage Movement
3.0 Magnet Operation
3.1 General Layout of Magnets and Power Supplies
3.2 Safety Procedures for Magnets in Hall B
3.2.1 Identification of Potential Hazards
3.2.2 Hazard Mitigation
3.4.1 Møller Quadrupole Operation checklist
3.5.1 Mini-Toroid Installation and Operation
3.5.2 Mini-Toroid Removal
3.6 Pair Spectrometer Dipole Magnet
3.7 Tagger Magnet and Power Supply
3.7.1 Safety Hazards and Precautions
3.7.2 Normal Operation
3.7.3 Special Procedures
3.8 Toroidal Magnet
3.8.1 Equipment Description
3.8.2 KNUTH Computer
3.8.3 Oxford Annunciator/A>
3.8.4 Operations & Troubleshooting Current Control
4.2 PMT High Voltage
4.2.1 Detectors and Environment
4.2.2 High Voltage Supply
4.2.3 Cables
4.2.4 PMT Voltage Dividers
4.2.5 HV Shock
4.2.6 Fire
4.3.1 Low Voltage
4.3.2 High Voltage
4.3.3 Gas System
4.4.1 System Operation
4.4.2 Safety Considerations
5.1.1 Hazards
5.1.2 Hazard Mitigation
5.1.3 Operating Safety Requirements
5.1.4 Posting Requirements
5.2 Tagger Dump and Faraday Cup
5.3 Cryogenic Target
6.0 Operating procedure for the Hall B beam tunnels
6.1 Upstream Tunnel
6.1.1 Emergency exits
6.1.2 Magnetic fields
6.2.1 Emergency exits
6.2.2 Magnetic Fields
6.2.3 Confined Space
Appendix A CLAS Toroidal Magnet
Appendix B Hall B Cryogenic Target
Appendix C Carriage Movement
Appendix D LSOP for CLAS Calibration Lasers