Minutes of Regular Hall C Meeting

November 5, 2001@ 3:00 p.m.

************************************************************************

 

 

¨      General (Roger Carlini)

 

v       Moller nitrogen spill – alcove is temporarily

v       ODH 1 area for tunnel per Kashy and Brindza

v       Main LN2 valve is now outside

v       Understanding is that alcove will be ODH ø when new valves have been installed

v       Two man rule applies now, floor and behind beam line

 

¨      Installation (Walter Kellner)

 

v       Now taking inventory of all parts

v       First new transportainer has been assigned to Joe Beaufait who is moving material in

v       Mike Lawing has now been hired in a permanent position

 

¨      Engineering (Bill Vulcan)

 

v       New laser came in and is being returned, not working

v       Everything else in the hall is going well

 

¨      New Raster (Chen Yan)

 

v      Linear raster system

v      First 19” rack mount helicity clock generator complete

v      First NIM model of raster frequency is complete

v      Study of long distance cable driver is successful

v      H bridge power driver fabrication partly complete

v      Design remote control

v      Beam halo detection for G0 with superharps

v      Design and fabrication of new bases for 115m PMT’s

v      10µ Ci source test in radcom lab to be scheduled

v      Software modification

v      4 channel ADC test to be made

v      2 log amplifier test to be made

v      The first carbon wire replacement was not successful

v      Beam line electronics

v      Superharp preamps

v      Renovation of superharp system

v      Re-design preamps, shielding case, replace all BLM channel

v      System maintenance

v      GeN raster system

v      Options next polarized target experiment

v      Implant Hall B raster system?

v      Keep present Gen raster unchanged but modify SEM software

v      Lower fundamental frequency 1, reduce Q valve but still not able to run 30 Hz

v      Discussion on what best option there is.  What do we try to accomplish?

v      FR/SR control screen upgrade – on passive Hall C display an active button for pattern density display will be added

 

¨      Gen (Joerg Reinhold)

 

v       All systems are running good

v       Moller measurement, turn Hall A off, we get 70%, turn Hall A on we get 67%

v       Exact difference not understood yet

v       This evening more Moller runs/tests

v       Tuesday morning short maintenance and Mott measurement

v       Target polarization increases, after anneals, less than expected

v       Decay of target polarization seems to be slower though

v       Shield house should be torn out in January

 

¨      G0 (Allison Lung)

 

v      Cooling magnet – give one more shot, the end of November, beginning of December

v      Power supply running at 5500 Amps is working

v      Kellner will be in charge of shipping the magnet

v      Four people from ORSAY will be coming in the second week of December for French detector installation

v      Third week of January is the next G0 Collaboration Meeting

v      Phil Roos has been named the on-site Deputy spokesperson for the G0 experiment

v      G0 beam test for Tuesday has been dropped off the schedule.  Need to find out why

 

¨      Gen (Dick Madey)

 

v      Proposal for next experiment was sent out

v      Showed various plots for proposal, and impact of higher Q2 GEn point