************************************************************************
Minutes of Regular Hall C Meeting
November 5, 2001@ 3:00 p.m.
************************************************************************
¨ General (Roger Carlini)
v Moller nitrogen spill – alcove is temporarily
v ODH 1 area for tunnel per Kashy and Brindza
v Main LN2 valve is now outside
v Understanding is that alcove will be ODH ø when new valves have been installed
v Two man rule applies now, floor and behind beam line
¨ Installation (Walter Kellner)
v Now taking inventory of all parts
v First new transportainer has been assigned to Joe Beaufait who is moving material in
v Mike Lawing has now been hired in a permanent position
¨ Engineering (Bill Vulcan)
v New laser came in and is being returned, not working
v Everything else in the hall is going well
¨ New Raster (Chen Yan)
v Linear raster system
v First 19” rack mount helicity clock generator complete
v First NIM model of raster frequency is complete
v Study of long distance cable driver is successful
v H bridge power driver fabrication partly complete
v Design remote control
v Beam halo detection for G0 with superharps
v Design and fabrication of new bases for 115m PMT’s
v 10µ Ci source test in radcom lab to be scheduled
v Software modification
v 4 channel ADC test to be made
v 2 log amplifier test to be made
v The first carbon wire replacement was not successful
v Beam line electronics
v Superharp preamps
v Renovation of superharp system
v Re-design preamps, shielding case, replace all BLM channel
v System maintenance
v GeN raster system
v Options next polarized target experiment
v Implant Hall B raster system?
v Keep present Gen raster unchanged but modify SEM software
v Lower fundamental frequency 1, reduce Q valve but still not able to run 30 Hz
v Discussion on what best option there is. What do we try to accomplish?
v FR/SR control screen upgrade – on passive Hall C display an active button for pattern density display will be added
¨ Gen (Joerg Reinhold)
v All systems are running good
v Moller measurement, turn Hall A off, we get 70%, turn Hall A on we get 67%
v Exact difference not understood yet
v This evening more Moller runs/tests
v Tuesday morning short maintenance and Mott measurement
v Target polarization increases, after anneals, less than expected
v Decay of target polarization seems to be slower though
v Shield house should be torn out in January
¨ G0 (Allison Lung)
v Cooling magnet – give one more shot, the end of November, beginning of December
v Power supply running at 5500 Amps is working
v Kellner will be in charge of shipping the magnet
v Four people from ORSAY will be coming in the second week of December for French detector installation
v Third week of January is the next G0 Collaboration Meeting
v Phil Roos has been named the on-site Deputy spokesperson for the G0 experiment
v G0 beam test for Tuesday has been dropped off the schedule. Need to find out why
¨ Gen (Dick Madey)
v Proposal for next experiment was sent out
v Showed various plots for proposal, and impact of higher Q2 GEn point