Minutes of Regular Hall C Meeting
June 7, 1999 @ 3:00 p.m.
************************************************************************
- Engineering: (Bill Vulcan)
- High Voltage Cable will be in on Thursday
- 90% SHV panels are made
- 90% cable tray is in for the High Voltage
- Still need to get pivet duck to SO S in
- G0 cable tray being installed
- Testing out timing SOS to the HNNS tomorrow
- A(e,e'p) update (Rolf Ent)
- X,position of Y, focus in HMS changing verses momentum
- Current Slope - -1.1 cm./GeV ("p
" tune)
- 95/96 - -1.2 cm/GeV (old tune)
- Hall probe vs. PHMS:
- Q1 = B/GeV constant
- Q2 = B/GeV Constant
- Q3 = B/GeV 1% varying
- Trying to find out the difference, for Thia's experiment
- Report from R (Thia Keppel)
- Move spectrometers around
- Try to find out what starts tripping off without beam
- Remark the floor
- Surveyors and Jim Dunne will discuss what needs to happen for target survey
- Shower Counter Efficiencies (Hamlet Mkrtchyan)
- Rates and Pi/e rejection at "hot" kinematics settings for E94-110
- Shows ratio about 1 to 1
- Discusses possible upgrade: adding pre-radiator before last horoscope plane
- Luminosity Monitor (Dave Mack)
- Design Issues
- Need reasonable rate
- Sit at backward angles to stay out of way
- No PID will be done
- Using scints in D
E mode, so set threshold somewhere harmless
- Correlated Spectral Function Expt. (Marko Zeier)
- Waiting for targets from machine shop
- Preliminary collaboration list E97006, shift availability shown
- Discussion of possible smaller detector size in Polarimeter
- Current rates in 10in x 40in x 4in above 1 MHz
- Detector in each layer of the front array of the polarimeter for the Q2 points attainable with a beam energy of 960 MeV per pass
- July - running some detector tests
- Measure rates
- Compare light collection (examine small pulse-height portion of ADC spectra from neutrons. Veto charged particles
- Measure time resolution
- Measure propagation time of signal from neutron arm
- Scintillators began arriving on Friday
- Take 3 to 4 months to polish the scintillators
- Gearing up for detectors to get ready
- Modules design is progressing
- Ferris wheel and platform should be ready for bid in July
- Short list for the new Hall C position, so far we have one (Greg Smith) who will be brought in around June 21, 1999.