Minutes of Regular Hall C Meeting
September 27, 1999 @ 3:00 p.m.
************************************************************************
- Engineering (Bill Vulcan)
- Power supply of HMS dipole was tripping at 1800 Amps, restricted running
- Problems with Quad, it appears to be coming from connection to the interlock
- Need to order more cables for Tang's exp.
- Need to order (30) fans for the power supplies
- Looking into getting patch panels on the main frame for G0 magnet
- CSF E97-006Progress, (Daniela Rohe)
- Reported on beam time that was taken on E97-006
- No beam due to lots of problems in the accelerator. Afterwards major HMS problmes: main reason-leak in the helium tube, bad interlock interface, one cable was not connected right
- Had lots of data acquisition problems
- At the beginning of beam time, the pumps which evacuate the HMS and SOS were not switched on
- Also found that the power supply for the rotation of the SOS was not switched on
- Report on Experiment E94-110(Rolf Ent)
- Data analysis is going good
- Run plan is being prepared
- Shift schedule is being prepared, need volunteers
- Experiment is scheduled to start running on Oct. 5-11
- Modified the "Engine" library to delete HMS related part and add HNSS part
- New software library "Ktracking" for HNSS is now available
- Generation of dummy data in the CODA data format by the GEANT simulator
- Debugging and calibration of HNSS and SOS subroutines and/or parameters
- New subroutines for physics data analysis
- Simulation for the calibration procedure by p(e,e'K+) Lambda reaction
- CODA setup for SSD and hodoscopes is available at EEL building
- Whole setup is now under construction. New read out lists TS, scalers, and so on should be prepared
- Slow Control - now under consideration. We should list up what kinds of parameters are registered
- Submitted 3 sets of cables, numbers, lengths and types needed
- Regular working group meeting took place last Thursday, will have another one this Thursday
- Good progress on the construction
- Delivery schedule for the French electronics and detectors were discussed
- Magnet delivery schedule has not yet been determined
- Controls for magnet has not been worked on yet
- Background study needs to be determined
- Accelerator was late getting turned on, power supply trouble
- Interviews for the Hall C coordinator will take place on Wednesday