Status & Schedules
From GlueXWiki
[edit]
Status & Schedules
- Detector Electronics
ASIC (GAS-)
V1 - Testing
V2 - June 2009
Preamp Card (GPC-)
V1 - Testing
V2 - July 2009
Tagger (TAG)
Analog Board
V1 - Testing
V2 - May 2009
Digital Board
V1 - Jan 2009
V2 -
Pair Spectrometer (PS)
Start Counter (ST)
Central Drift Chamber (CDC)
HVB
V1 - Complete
V2 - Testing
Forward Drift Chamber (FDC)
HVTB
V1 - Testing
V2 -
STB
V1 - Testing
V2 -
Cathode Foils
V1 - Sep 2008
V2 -
RigiFlex Signal
V1 - Testing
V2 - Jan 2009
RigiFlex Ground
V1 - Testing
V2 - Jan 2009
Barrel Calorimeter (BCAL)
SiPM
V1 - Dec 2008
V2 -
Time-of-Flight (TOF)
Forward Calorimeter (FCAL)
Cockcroft-Walton Multiplier
V1 - Testing
V2 -
- ADC & TDC Electronics - (Front-End)
fADC125 - 125 MSPS flash ADC
V1 - Mar 2009
V2 -
fADC250 - 250 MSPS flash ADC
V1 - Testing
V2 - Nov 2009
F1TDC - 60/120 ps Multi-hit TDC
V1 - Complete Oct 2002
V2 - Sept 2009
- Trigger Electronics - (Back-End)
Trigger Interface (TI)
V1 - Testing (TI/TD)
V2 -
Signal Distribution (SD)
V1 - Jan 2009
V2 -
Crate Trigger Processor (CTP)
V1 - Jan 2009
V2 -
Sub-System Processor (SSP)
V1 - May 2009
V2 -
Global Trigger Processor (GTP)
V1 - Jul 2009
V2 -
Trigger Supervisor (TS)
V1 - Jun 2009
V2 -
Trigger Distribution (TD)
V1 - Apr 2009
V2 -
