Contents

Machine interface Documents

Machine interface document draft 4. Draft sent to machine for comment. ICD_Accelerator-HallD_04.doc


Machine interface document draft 3 ICD_Accelerator-HallD_03.doc


Machine Group Songsheet for the Tagger Hall

The plans by the accelerator are summarized in their song-sheet. It can be found here

Tagger hall songsheet version March 26 2008



Tagger Hall Vacuum System

Tagger hall vacuum layout


Schematic overview of the tagger hall vacuum system

Photon beamline between tagger and West Wall

Sketch of the photon beamline between the tagger magnet and the West wall of the tagger hall. (The magnet needs to be positioned 3.2cm below the beam axis. This means the flanges must be different on the ends of the magnet.)

Image:beamline-BSize Layout.TIF



Collimator Cave


Pictures of the collimator cave

Side View of the collimator cave

Top View of the collimator cave




Upstream region of the collimator cave

Side View


Top View



Central area of the collimator cave

Side View


Top View




Downstream region of the collimator cave

Side View


Top View



1st sweeping Magnet

Fermilab Technical Design Handbook

Electron Beam Deflection by Permanent Magnet


Older design versions

  • Conceptual design of shielding plan from Connecticut (5/2006)
  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave Layout Jul 18, 2008 - July 18, 2008

Collimator Cave Isometric Jul 18, 2008 - July 18, 2008


Construction and Installation Schedules

Installation schedule for the cave extension Cave extension fasttrack file


Return to Photon Beam Main Page

Return to Hall-D WIKI main page