<?xml version="1.0" encoding="utf-8"?>
<?xml-stylesheet type="text/css" href="http://www.jlab.org/Hall-D/software/wiki/skins/common/feed.css"?>
<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/">
	<channel>
		<title>GlueXWiki - Recent changes [en]</title>
		<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Special:Recentchanges</link>
		<description>Track the most recent changes to the wiki on this page.</description>
		<language>en</language>
		<generator>MediaWiki 1.6.5</generator>
		<lastBuildDate>Tue, 24 Nov 2009 12:33:16 GMT</lastBuildDate>
		<item>
			<title>HOWTO extract photons or pi0's from the framework</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/HOWTO_extract_photons_or_pi0%27s_from_the_framework</link>
			<description>&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;&lt;br /&gt;
Many people will want to analyze final states with photons.  There are several key high-level analysis objects for doing this.  Unless you are doing calorimetry diagnostics it is not recommend that utilize any other object besides the ones listed below.  This is because various corrections to the reconstructed photon four-momentum are applied through the reconstruction chain.  Using the high level objects below guarantees that you will get a photon which has the current best measurement of the four-momentum and its error matrix.&lt;br /&gt;
&lt;br /&gt;
== Using DPhoton objects ==&lt;br /&gt;
&lt;br /&gt;
The DPhoton objects contain a list of all (assumed) photons reconstructed by the FCAL and the BCAL.  This&lt;/div&gt;</description>
			<pubDate>Tue, 24 Nov 2009 12:32:18 GMT</pubDate>			<dc:creator>Mashephe</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:HOWTO_extract_photons_or_pi0%27s_from_the_framework</comments>		</item>
		<item>
			<title>Offline Software</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Offline_Software</link>
			<description>&lt;p&gt;/* HOWTO Documentation */ &lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 12:28, 24 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 6:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 6:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[HOWTO simulate and analyze b1pi events | HOWTO simulate and analyze b&amp;lt;sub&amp;gt;1&amp;lt;/sub&amp;gt;&amp;amp;pi; events]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[HOWTO simulate and analyze b1pi events | HOWTO simulate and analyze b&amp;lt;sub&amp;gt;1&amp;lt;/sub&amp;gt;&amp;amp;pi; events]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;* [[HOWTO extract photons or pi0's from the framework]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[HOWTO Create a Hall-D Software Release]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[HOWTO Create a Hall-D Software Release]]&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Tue, 24 Nov 2009 12:28:38 GMT</pubDate>			<dc:creator>Mashephe</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:Offline_Software</comments>		</item>
		<item>
			<title>Kinematic Fitting</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Kinematic_Fitting</link>
			<description>&lt;p&gt;/* Kinematic Fitting */ &lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 02:36, 24 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 3:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 3:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* GlueX-doc-905 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=905 Kinematic Fitting Talk]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* GlueX-doc-905 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=905 Kinematic Fitting Talk]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* GlueX-doc-1381 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1381 Kinematic Fitting Talk]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* GlueX-doc-1381 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1381 Kinematic Fitting Talk]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;* Software to demonstrate how to use the kinematic fit:[[Image:Testkfit.tgz]].&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;** Untarring it will produce a testKfit with multiple subdirectories. The subdirectory names should give a clue as to the reaction/study. The fitting is done in MyApplication.cc. I'm not sure if JANA/GlueX software still uses this mode of operating. All of this worked at the time with the DKinFit object which existed in the main trunk. You may want to look at test_pKsKs_misspi. That reaction is gamma p --&amp;gt; p KS KS, where the one of the pi- from the KS is missing, but both KS mass constraints are applied.&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Tue, 24 Nov 2009 02:36:13 GMT</pubDate>			<dc:creator>Cmeyer</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:Kinematic_Fitting</comments>		</item>
		<item>
			<title>Special:Log/upload</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Special:Log/upload</link>
			<description>&lt;p&gt;uploaded &amp;quot;[[Image:Testkfit.tgz]]&amp;quot;: Package of software showing how to use the kinematic fit software.&lt;/p&gt;
</description>
			<pubDate>Tue, 24 Nov 2009 02:25:59 GMT</pubDate>			<dc:creator>Cmeyer</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Log/upload</comments>		</item>
		<item>
			<title>Kinematic Fitting</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Kinematic_Fitting</link>
			<description>&lt;p&gt;/* Kinematic Fitting */ &lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;== Kinematic Fitting ==&lt;br /&gt;
&lt;br /&gt;
* GlueX-doc-905 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=905 Kinematic Fitting Talk]&lt;br /&gt;
* GlueX-doc-1381 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1381 Kinematic Fitting Talk]&lt;/div&gt;</description>
			<pubDate>Tue, 24 Nov 2009 01:55:22 GMT</pubDate>			<dc:creator>Cmeyer</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:Kinematic_Fitting</comments>		</item>
		<item>
			<title>Private:Hall D Staff Meeting, November 23, 2009</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Private:Hall_D_Staff_Meeting%2C_November_23%2C_2009</link>
			<description>&lt;p&gt;first draft&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Present: George Biallas, Dan Carman, Eugene Chudakov (chair), Bill Crahen, John Domingo, Casey Heck, Chuck Hutton, Mark Ito, David Lawrence, Slava Razmyslovich, Elton Smith, Sascha Somov, Simon Taylor, Tim Whitlatch, Elliott Wolin, Glenn Young, Beni Zihlmann&lt;br /&gt;
&lt;br /&gt;
=Eugene=&lt;br /&gt;
&lt;br /&gt;
* BIA funding: we were cut by 1 M$, restored at the end of last week, the crisis is past&lt;br /&gt;
* magnet review last week: George will summarize, very positive, kudos to George for his efforts.&lt;br /&gt;
* magnet in BIA: may have to change plans in costing magnet effort, need to look at both hardware and software components&lt;br /&gt;
* Elliott asked about the status of hiring. Eugene: Offers passing through system, preliminary approval granted, 3rd position still up in the air&lt;br /&gt;
* another bridge position, Mississippi State, was discussed, not this year, next such position will go to Hall D, perhaps FSU&lt;br /&gt;
* Elton: FIU MOU may not have been signed by FIU, there is a question about whether the ad has been placed&lt;br /&gt;
* approval for MOU with both NCA&amp;amp;T and UNCW obtained from Alison Lung&lt;br /&gt;
* Elton and Sascha: the Catholic MOU needs to be pursued. There is a question about whether the goniometer is included or not.&lt;br /&gt;
* Performance appraisals: going at steady pace&lt;br /&gt;
* with 3.5 ft of concrete issue and a full retention pond, work has been suspended on the Hall with attendant schedule delay&lt;br /&gt;
&lt;br /&gt;
=David=&lt;br /&gt;
&lt;br /&gt;
* working on reconstruction of multi-particle final states&lt;br /&gt;
* exploring PrimEx eta production issue&lt;br /&gt;
&lt;br /&gt;
=Tim=&lt;br /&gt;
&lt;br /&gt;
* landmark decisions on CDC last week:&lt;br /&gt;
** made choice of straw, aluminum on mylar&lt;br /&gt;
** crimp pins: use the Hall B ones, tack on their order, supplier will not do copper anymore&lt;br /&gt;
* has been working on solenoid testing and review preparation&lt;br /&gt;
&lt;br /&gt;
=Beni=&lt;br /&gt;
&lt;br /&gt;
* CMU construction contract: CMU asked for extension, contract wording being review by their legal department, will need renegotiation of some of points&lt;br /&gt;
* INT, Seattle: &amp;quot;we do not know much&amp;quot;, partial wave analyses conducted thus far not liked by theorists e. g., COMPASS, resonant structures need to be included correctly&lt;br /&gt;
&lt;br /&gt;
=Mark=&lt;br /&gt;
&lt;br /&gt;
* project planning: web page for cost report, manpower effort profile, Gantt chart, task summaries for Offline Computing&lt;br /&gt;
&lt;br /&gt;
=Chuck=&lt;br /&gt;
&lt;br /&gt;
* Fastrack work for coil tests&lt;br /&gt;
* BCAL layout of light guides. Elton: how close? Chuck: need to locate PMT's exactly, will meet with Elton on Wed.&lt;br /&gt;
* working on BCAL modifications&lt;br /&gt;
&lt;br /&gt;
=Bill=&lt;br /&gt;
&lt;br /&gt;
* FDC: trying to seal major gas leaks, Casey searching for them&lt;br /&gt;
* analyzing effect of pressure on liquid helium containment vessel, stress analysis in progress, room temperature analysis for now&lt;br /&gt;
* George: analysis was done in past on as-designed, not on the as-built, the latter needed&lt;br /&gt;
* signing drawings on FDC&lt;br /&gt;
&lt;br /&gt;
=Dan=&lt;br /&gt;
&lt;br /&gt;
* working up to three layers on full-scale FDC prototype&lt;br /&gt;
* 300 cc per minute the limit of gas flow right now&lt;br /&gt;
* getting more hardware to increase flow&lt;br /&gt;
* working on work-arounds for the leak fixes; design changes will fix these issues for production chamber&lt;br /&gt;
* hope for 3 layers by next week&lt;br /&gt;
* move to cosmic ray test set up: schedule not clear, prototype now in clean tent&lt;br /&gt;
&lt;br /&gt;
=Sascha=&lt;br /&gt;
&lt;br /&gt;
* working on tagger hall simulation, implementing new geometry, optimization of quad field&lt;br /&gt;
* looking at simulation of microstrip chambers for use with pair spectrometer&lt;br /&gt;
* working on PrimEx on background issues&lt;br /&gt;
* Eugene asked about timescale for final decision on tagger design, Sascha said should be end of this year, he and Richard need to document a few final decisions. * Eugene asked about need for 3-d mode? Sascha and Bill replied that Bill will do that for mechanical (stress analysis) and magnetic field.&lt;br /&gt;
&lt;br /&gt;
=Simon=&lt;br /&gt;
&lt;br /&gt;
* working multiparticle reactions: &amp;lt;math&amp;gt;\gamma p\rightarrow\pi(1600)n&amp;lt;/math&amp;gt; and &amp;lt;math&amp;gt;\gamma p\rightarrow b_1\pi^-p&amp;lt;/math&amp;gt;, &amp;lt;math&amp;gt;b_1\rightarrow\omega\pi^+&amp;lt;/math&amp;gt;, &amp;lt;math&amp;gt;\omega\rightarrow\pi^+\pi-\pi^0&amp;lt;/math&amp;gt;&lt;br /&gt;
* goal is to measure efficiency&lt;br /&gt;
&lt;br /&gt;
=Slava=&lt;br /&gt;
&lt;br /&gt;
* modeling CDC parts&lt;br /&gt;
* solid model for assemblies&lt;br /&gt;
* tweaking existing layout as well&lt;br /&gt;
* decision on how to seal HV cables made, prototype testing will be done&lt;br /&gt;
* Eugene asked if all connections designed. Slava replied that layout exists which shows how it will be done. Problem with sealing HV cables was last thing addressed.&lt;br /&gt;
&lt;br /&gt;
=Elton=&lt;br /&gt;
&lt;br /&gt;
* &amp;quot;two minutes ago&amp;quot; Sensl units arrived, 10 are in the box&lt;br /&gt;
* info from Carl on Hamamatsu arrays is positive, uniformity, pde as expected at room temperature, he still needs to look at dark rate, radiation hardness&lt;br /&gt;
* John asked about temperature dependence testing. Elton said it could be done&lt;br /&gt;
* contract with IU for FCAL construction: response from IU recieved, technical evaluation team met to provide advice to Procurement, some comments were made, mainly on documentation needs for readiness review&lt;br /&gt;
* BCAL fabrication: readiness review three weeks ago or so, prototype was uneven, more problems arose than anticipated, first module has been started, all problems need to be addressed before starting 2nd module. There is already a front-back asymmetry of 1.5 mm, they will rotate by 180 degrees in the press and go on&lt;br /&gt;
* INT in Seattle: agreed with Beni's assessment. Some groups are starting PWA development, BES/IHEP in China and COMPASS, preparing things for PANDA&lt;br /&gt;
&lt;br /&gt;
=Casey=&lt;br /&gt;
&lt;br /&gt;
* working mainly on FDC leak finding/sealing, found some more in cathode in first layer&lt;br /&gt;
* Dan: Casey also working on some tasks that Mark Stevens had worked, including soldering rigid flex assemblies&lt;br /&gt;
&lt;br /&gt;
=George=&lt;br /&gt;
&lt;br /&gt;
See his report for more details.&lt;br /&gt;
&lt;br /&gt;
* solenoid review&lt;br /&gt;
* coil 1 work&lt;br /&gt;
* pressure system documentation&lt;br /&gt;
* Chuck has been working on overall assemblies&lt;br /&gt;
* incidentals on platform being addressed&lt;br /&gt;
* Josh worked on cryo interface&lt;br /&gt;
* piping and instrumentation mark-up complete&lt;br /&gt;
&lt;br /&gt;
=Elliott=&lt;br /&gt;
&lt;br /&gt;
* Beni was having problem with communication with DAQ, Carl Timmer has fixed it.&lt;/div&gt;</description>
			<pubDate>Mon, 23 Nov 2009 23:08:56 GMT</pubDate>			<dc:creator>Marki</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Private_talk:Hall_D_Staff_Meeting%2C_November_23%2C_2009</comments>		</item>
		<item>
			<title>Private:Hall D Staff Meetings</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Private:Hall_D_Staff_Meetings</link>
			<description>&lt;p&gt;add 11/23&lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 22:09, 23 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 1:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 1:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;Notes on the bi-weekly Hall D Staff Meetings.&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;Notes on the bi-weekly Hall D Staff Meetings.&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;* [[Private:Hall_D_Staff_Meeting, November 23, 2009|November 23, 2009]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Private:Hall_D_Staff_Meeting, November 9, 2009|November 9, 2009]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Private:Hall_D_Staff_Meeting, November 9, 2009|November 9, 2009]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Private:Hall_D_Staff_Meeting, October 12, 2009|October 12, 2009]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Private:Hall_D_Staff_Meeting, October 12, 2009|October 12, 2009]]&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Mon, 23 Nov 2009 22:09:47 GMT</pubDate>			<dc:creator>Marki</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Private_talk:Hall_D_Staff_Meetings</comments>		</item>
		<item>
			<title>Offline Software</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Offline_Software</link>
			<description>&lt;p&gt;/* GlueX Offline Software */ &lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 22:04, 23 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 42:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 42:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Simulation Software]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Simulation Software]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Geometry]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Geometry]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;* [[Kinematic Fitting]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Magnetic Field Maps for Solenoid]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Magnetic Field Maps for Solenoid]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Reconstruction Software]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Reconstruction Software]]&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Mon, 23 Nov 2009 22:04:02 GMT</pubDate>			<dc:creator>Cmeyer</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:Offline_Software</comments>		</item>
		<item>
			<title>Special:Log/upload</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Special:Log/upload</link>
			<description>&lt;p&gt;uploaded &amp;quot;[[Image:A.Teymurazyan eta hadronic background.pdf]]&amp;quot;: Backround studies for eta-Primakoff&lt;/p&gt;
</description>
			<pubDate>Mon, 23 Nov 2009 16:52:14 GMT</pubDate>			<dc:creator>Zihlmann</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Log/upload</comments>		</item>
		<item>
			<title>November 23, 2009 (11AM), Physics Working Group</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/November_23%2C_2009_%2811AM%29%2C_Physics_Working_Group</link>
			<description>&lt;p&gt;/* Agenda */ &lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 15:53, 23 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 37:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 37:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;*8.  Perform a PWA on 3pi final states.  (This might not be necessary if step 5 or 6 show unacceptable degradation).&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;*8.  Perform a PWA on 3pi final states.  (This might not be necessary if step 5 or 6 show unacceptable degradation).&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;* (work done by Pawel:  [[Image:eta-sim-at-gluex-prot.pdf]])&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Mon, 23 Nov 2009 15:53:47 GMT</pubDate>			<dc:creator>Remitche</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:November_23%2C_2009_%2811AM%29%2C_Physics_Working_Group</comments>		</item>
		<item>
			<title>Special:Log/upload</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Special:Log/upload</link>
			<description>&lt;p&gt;uploaded &amp;quot;[[Image:Eta-sim-at-gluex-prot.pdf]]&amp;quot;&lt;/p&gt;
</description>
			<pubDate>Mon, 23 Nov 2009 15:53:12 GMT</pubDate>			<dc:creator>Remitche</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Log/upload</comments>		</item>
		<item>
			<title>November 20, 2009 CDC Meeting</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/November_20%2C_2009_CDC_Meeting</link>
			<description>&lt;p&gt;&lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 18:40, 20 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 21:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 21:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;==New Action Items==&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;==New Action Items==&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;&amp;#160;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* Tim to pursue getting 10,00 Hall B crimp pins from Medelec since they have not completed the Hall B order yet&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* Curtis to check effect of 200 micron hole in crimp pin on resolution (vs 100 micron)&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* Slava to update Plastic wire insert drawing to match Hall B crimp pin&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* Tim to send some crimp pins, al donuts and feedthrus to CMU to check. JLAB will hold on to remainder until CMU ready.&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* Slava to produce drawings for swiss cheese plate and threaded insert for final review&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* Gary to machine and thread polycarbonate plate to verify that this is the proper material&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* Tim to update straw spec and drawings and get out to Lamina for quote.&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;==Action Items/Decisions from Previous Meeting==&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;==Action Items/Decisions from Previous Meeting==&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Slava to layout new setup to attach one connector stud to al plate and attach HV board directly to connector. will relocate connectors and check clearances with 8mm bend rad in wire&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Slava to layout new setup to attach one connector stud to al plate and attach HV board directly to connector. will relocate connectors and check clearances with 8mm bend rad in wire&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;**&amp;lt;font color=blue&amp;gt; Complted work. Layout clearance good&amp;lt;/font&amp;gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Tim to pursue Medelec 2 piece crimp pin quotes. Medelec said they could not make the one designed&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Tim to pursue Medelec 2 piece crimp pin quotes. Medelec said they could not make the one designed&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;**&amp;lt;font color=blue&amp;gt; Medelec will not make any more copper crimp pins of any design unless the order had already been placed. Tim Investigated other manufacturers to no avail. Hole/length ratio too small&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;**&amp;lt;font color=blue&amp;gt; Medelec will not make any more copper crimp pins of any design unless the order had already been placed. Tim Investigated other manufacturers to no avail. Hole/length ratio too small&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;&amp;lt;/font&amp;gt;&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Beni to complete rad tests of straws in the next couple of weeks and send straws back to CMU for test&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Beni to complete rad tests of straws in the next couple of weeks and send straws back to CMU for test&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;**&amp;lt;font color=blue&amp;gt;s traws back at CMU&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;**&amp;lt;font color=blue&amp;gt;s traws back at CMU&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;&amp;lt;/font&amp;gt;&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Have endplates delivered to JLAB for spot check of hole coordinates. Tim to arrange with survey group&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Have endplates delivered to JLAB for spot check of hole coordinates. Tim to arrange with survey group&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;**&amp;lt;font color=blue&amp;gt; Vendor to independently check with Faro arm. Do we still widh to bring these to JLAB?&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;**&amp;lt;font color=blue&amp;gt; Vendor to independently check with Faro arm. Do we still widh to bring these to JLAB?&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;&amp;lt;/font&amp;gt;&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Fernando to look at stripping tools to reduce the need for large pcb on connector&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Fernando to look at stripping tools to reduce the need for large pcb on connector&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;**&amp;lt;font color=blue&amp;gt; Stripping tool located, inner pad 3mm, 2mm gap , HV outer pad 6mm. Total wdth of pcb 30.5mm, 8mm bend rad required for cable&amp;lt;/font&amp;gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;**&amp;lt;font color=blue&amp;gt; Stripping tool located, inner pad 3mm, 2mm gap , HV outer pad 6mm. Total wdth of pcb 30.5mm, 8mm bend rad required for cable&amp;lt;/font&amp;gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;== Notes ==&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;== Notes ==&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;# O-ring: The O-ring used on the prototype is a #103 BUNA-N Soft&lt;/span&gt;. &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;The through-&lt;/span&gt;hole &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;is 156 &lt;/span&gt;and &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;the shoulder is a 9/32 into which the O&lt;/span&gt;-ring &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;is forced.&lt;/span&gt;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* All agreed to pursue Hall B straight crimp pins&lt;/span&gt;. &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;200 micron &lt;/span&gt;hole&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;, 12mm long, 1.47mm OD&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;# Small modifications &lt;/span&gt;to &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;connector/grounding assembly [[Image:CDC Connector&lt;/span&gt;.&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;pdf]]&lt;/span&gt;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* 3700 ea aluminum donuts &lt;/span&gt;and &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;feedthru's received at JLAB&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;* &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;Gary &lt;/span&gt;to check &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;if he can still get conductive rubber boot used previously&lt;/span&gt;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* Will pursue threaded insert to compress o&lt;/span&gt;-ring to &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;wire for sealing&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;* &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;Slava &lt;/span&gt;to &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;update &lt;/span&gt;layout &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;of cable to crimp pin per discussion&lt;/span&gt;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* Lamina 300A alum on Mylar tubes passed radiation test. Will pursue procuring these straws&lt;/span&gt;.&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;* &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;Decided &lt;/span&gt;to &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;have endplates shipped to JLAB fist for spot &lt;/span&gt;check&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;* &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;Fernando will ship some new preamp cards &lt;/span&gt;to &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;CMU in January&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* Latest HV board connection &lt;/span&gt;layout &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;accepted by all&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Fri, 20 Nov 2009 18:40:33 GMT</pubDate>			<dc:creator>Whitey</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:November_20%2C_2009_CDC_Meeting</comments>		</item>
		<item>
			<title>November 23, 2009 (11AM), Physics Working Group</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/November_23%2C_2009_%2811AM%29%2C_Physics_Working_Group</link>
			<description>&lt;p&gt;/* Agenda */ &lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 17:33, 20 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 9:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 9:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;== Agenda ==&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;== Agenda ==&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;Possible plan of action for evaluating the effects of a smaller magnetic field:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;*1.  Scale the charged particle momentum resolution in HDParSim.&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;*2.  Update the acceptance tables in HDParSim to account for changes in geometrical acceptance.&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;*3.  Study the EM background levels in the FCAL, TOF, and FDC.  The increased backgrounds will require either (a) running at lower luminosity (how much lower?), or (b) increasing the dead area of the FDC or widening the holes in the TOF and FCAL (how much wider?).&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;*4.  Assuming the central holes of the FCAL, TOF, and FDC need to be widened due to EM background, the acceptance tables in HDParSim would need to be updated.&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;*5.  Study missing mass resolution.  &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;::One possible study would be to see how much the background from:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;:::gamma p --&amp;gt; pi+ pi+ pi- Delta0;  Delta0 --&amp;gt; pi0 n&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;::leaks into&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;:::gamma p --&amp;gt; pi+ pi+ pi- n&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;::for different missing mass resolutions.  The size of the background could be used as a measure of our sensitivity to an exotic wave (e.g. if the background from the Delta reaction is 10%, it becomes pretty dubious to fish out a 5% signal from the pi+ pi+ pi- n reaction).&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;*6.  Study the shapes of acceptances in Gottfried-Jackson angles for 3pi reactions for different magnetic fields.&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;*7.  Use the kinematic fitter and the TOF to see how much PID degrades with worse resolution (and a potentially larger hole in the TOF).&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;*8.  Perform a PWA on 3pi final states.  (This might not be necessary if step 5 or 6 show unacceptable degradation).&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Fri, 20 Nov 2009 17:33:55 GMT</pubDate>			<dc:creator>Remitche</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:November_23%2C_2009_%2811AM%29%2C_Physics_Working_Group</comments>		</item>
		<item>
			<title>Minutes-11-19-2009</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Minutes-11-19-2009</link>
			<description>&lt;p&gt;&lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 21:06, 19 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 3:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 3:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;Date: November 19, 2009&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;Date: November 19, 2009&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;Participants: Daniel, Mark S., Beni, Bill, Casey, Simon, Mark I., Eugene, Glenn, Brian&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;Participants: Daniel&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;, Roger&lt;/span&gt;, Mark S., Beni, Bill, Casey, Simon, Mark I., Eugene, Glenn, Brian&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;Next Meeting: November 26, 2009 @ 1:30 a.m.&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;Next Meeting: November 26, 2009 @ 1:30 a.m.&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 100:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 100:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;        the three cathode boards that make up a single panel were starting&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;        the three cathode boards that make up a single panel were starting&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;        to peel off. Casey has improved the design using copper tape.&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;        to peel off. Casey has improved the design using copper tape.&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;  - Roger has been in contact with our cathode board material supplier&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;     to get an update on our order delivery. Stay tuned.&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;  - The current draft of the cathode construction document is located at:&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;  - The current draft of the cathode construction document is located at:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;    /u/group/halld/Engineering/PRELIMINARY DOCUMENTS.&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;    /u/group/halld/Engineering/PRELIMINARY DOCUMENTS.&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Thu, 19 Nov 2009 21:06:23 GMT</pubDate>			<dc:creator>Carman</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:Minutes-11-19-2009</comments>		</item>
		<item>
			<title>Special:Log/delete</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Special:Log/delete</link>
			<description>&lt;p&gt;deleted &amp;quot;[[Image:Offline links.pdf]]&amp;quot;: putting pdf file into halldweb1 directories&lt;/p&gt;
</description>
			<pubDate>Thu, 19 Nov 2009 20:42:20 GMT</pubDate>			<dc:creator>Marki</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Log/delete</comments>		</item>
		<item>
			<title>Offline Computing Project Management</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Offline_Computing_Project_Management</link>
			<description>&lt;p&gt;links created&lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 20:41, 19 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 1:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 1:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;* [&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;[&lt;/span&gt;Planner views&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;]&lt;/span&gt;]&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;* [&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;http://halldweb1.jlab.org/project/offline_links.pdf &lt;/span&gt;Planner views &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;(PDF)&lt;/span&gt;]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;* [http://halldweb1.jlab.org/&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;planning&lt;/span&gt;/offline_links.html Costs]&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;* [http://halldweb1.jlab.org/&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;project&lt;/span&gt;/offline_links.html Costs &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;(HTML)&lt;/span&gt;]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Steps for Offline Activities, 12 Gev Project]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Steps for Offline Activities, 12 Gev Project]]&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Thu, 19 Nov 2009 20:41:26 GMT</pubDate>			<dc:creator>Marki</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:Offline_Computing_Project_Management</comments>		</item>
		<item>
			<title>Special:Log/upload</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Special:Log/upload</link>
			<description>&lt;p&gt;uploaded &amp;quot;[[Image:Offline links.pdf]]&amp;quot;: output from the planner program&lt;/p&gt;
</description>
			<pubDate>Thu, 19 Nov 2009 20:35:18 GMT</pubDate>			<dc:creator>Marki</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Log/upload</comments>		</item>
		<item>
			<title>Offline Computing Project Management</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Offline_Computing_Project_Management</link>
			<description>&lt;p&gt;new page, a few links&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;* [[Planner views]]&lt;br /&gt;
* [http://halldweb1.jlab.org/planning/offline_links.html Costs]&lt;br /&gt;
* [[Steps for Offline Activities, 12 Gev Project]]&lt;/div&gt;</description>
			<pubDate>Thu, 19 Nov 2009 20:34:36 GMT</pubDate>			<dc:creator>Marki</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:Offline_Computing_Project_Management</comments>		</item>
		<item>
			<title>Offline Software</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Offline_Software</link>
			<description>&lt;p&gt;/* GlueX Offline Software */ &lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 20:31, 19 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 49:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 49:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Needed Studies]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Needed Studies]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Role of the Software Coordinator]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Role of the Software Coordinator]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;* [[&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;Steps for Project &lt;/span&gt;Offline &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;Activities&lt;/span&gt;]]&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;* [[Offline &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;Computing Project Management&lt;/span&gt;]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;==External Software Systems==&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;==External Software Systems==&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Thu, 19 Nov 2009 20:31:15 GMT</pubDate>			<dc:creator>Marki</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:Offline_Software</comments>		</item>
		<item>
			<title>November 20, 2009 CDC Meeting</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/November_20%2C_2009_CDC_Meeting</link>
			<description>&lt;p&gt;&lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 20:22, 19 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 18:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 18:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Review Slava HV board mounting [[http://www.jlab.org/~vgr/CDC%2011-10-2009/]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Review Slava HV board mounting [[http://www.jlab.org/~vgr/CDC%2011-10-2009/]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Straw testing&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Straw testing&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;* Polycarbonate machining&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;==New Action Items==&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;==New Action Items==&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 25:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 26:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Slava to layout new setup to attach one connector stud to al plate and attach HV board directly to connector. will relocate connectors and check clearances with 8mm bend rad in wire&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Slava to layout new setup to attach one connector stud to al plate and attach HV board directly to connector. will relocate connectors and check clearances with 8mm bend rad in wire&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Tim to pursue Medelec 2 piece crimp pin quotes. Medelec said they could not make the one designed&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Tim to pursue Medelec 2 piece crimp pin quotes. Medelec said they could not make the one designed&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;** Medelec will not make any more copper crimp pins of any design unless the order had already been placed. Tim Investigated other manufacturers to no avail. Hole/length ratio too small&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;**&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;&amp;lt;font color=blue&amp;gt; &lt;/span&gt;Medelec will not make any more copper crimp pins of any design unless the order had already been placed. Tim Investigated other manufacturers to no avail. Hole/length ratio too small&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Beni to complete rad tests of straws in the next couple of weeks and send straws back to CMU for test&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Beni to complete rad tests of straws in the next couple of weeks and send straws back to CMU for test&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;** &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;straws &lt;/span&gt;back at CMU&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;**&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;&amp;lt;font color=blue&amp;gt;s traws &lt;/span&gt;back at CMU&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Have endplates delivered to JLAB for spot check of hole coordinates. Tim to arrange with survey group&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Have endplates delivered to JLAB for spot check of hole coordinates. Tim to arrange with survey group&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;** Vendor to independently check with Faro arm. Do we still widh to bring these to JLAB?&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;**&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;&amp;lt;font color=blue&amp;gt; &lt;/span&gt;Vendor to independently check with Faro arm. Do we still widh to bring these to JLAB?&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Fernando to look at stripping tools to reduce the need for large pcb on connector&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Fernando to look at stripping tools to reduce the need for large pcb on connector&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;**&amp;lt;font color=blue&amp;gt; Stripping tool located, inner pad 3mm, 2mm gap , HV outer pad 6mm. Total wdth of pcb 30.5mm, 8mm bend rad required for cable&amp;lt;/font&amp;gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;**&amp;lt;font color=blue&amp;gt; Stripping tool located, inner pad 3mm, 2mm gap , HV outer pad 6mm. Total wdth of pcb 30.5mm, 8mm bend rad required for cable&amp;lt;/font&amp;gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 35:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 36:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;# O-ring: The O-ring used on the prototype is a #103 BUNA-N Soft. The through-hole is 156 and the shoulder is a 9/32 into which the O-ring is forced.&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;# O-ring: The O-ring used on the prototype is a #103 BUNA-N Soft. The through-hole is 156 and the shoulder is a 9/32 into which the O-ring is forced.&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;# Small modifications to connector/grounding assembly [[Image:CDC Connector.pdf]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;# Small modifications to connector/grounding assembly [[Image:CDC Connector.pdf]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;* Slava will layout Fernando's stud grounding option&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;**&amp;lt;font color=blue&amp;gt; Opted for connector to al plate standoff stud design&amp;lt;/font&amp;gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;* Gary to supply sketch of CMU grounding option&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;**&amp;lt;font color=blue&amp;gt; see below&amp;lt;/font&amp;gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Gary to check if he can still get conductive rubber boot used previously&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Gary to check if he can still get conductive rubber boot used previously&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Slava to update layout of cable to crimp pin per discussion&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* Slava to update layout of cable to crimp pin per discussion&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;* Tim to see if cable restraint bushing can be made&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;* What needs to be done on al plate to ensure electrical connection? all&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;**&amp;lt;font color=blue&amp;gt; Decided on local cleaning and prep during assy&amp;lt;/font&amp;gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;* Gary to get sample of polycarbonate to test&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;==Ground HV Card Through Standoff==&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;Attached is a rough sketch showing the proposed stand-off scheme. [[Image:Standoff.pdf| pdf file]]&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;#) A 6/32 blind threaded hole is drilled in the endplate.&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;#) A 6/32 set screw is screwed into the hole. We can use conducting epoxy to improve the connection if needed.&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;#) A 1/4 inch electrical standoff with a 6/32 tapped hole is screwed onto the set screw. There are three possible variations on this for the end in contact with the endplate.&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;##) There is room for the 1/4 inch, nothing specicial&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;##) There is not quite enough room for the 1/4 inch due to the  heads of the feedthrus extending 1/10&amp;quot; above the surface of the plate. We can order a standard 1/4 standoff that has a diameter of 188 for the last .133 inches. This comes from McMaster-Carr.&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;##) Or we can make in house modifications:&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;###) we can (in house as needed) taper the end of the standof down to ~188 from 250 so it will fit,&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;###) we can (in house) as needed remove some material from the head of the feed throughs so that the 1/4 in can reach the endplate.&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;#) A .156 inch hole is drilled through the lucite plate.&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;#) A 6/32 set screw goes through the lucite plate and screws into the standoff.&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;#) Epoxy, or conducting epoxy in placed around the 6/32 set screw.&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;#) A  1/4 inch electrical standoff with blind 6/32 holes is screwed&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;#) The connector is attached to the standoff.&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;==Mounting the HV card==&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;We also would like to propose the standoffs that hold the HV card be on opposite sides of the card, rather than both on the same side. This gives less chance that the card will tilt during installation and removal.&amp;lt;br&amp;gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;@===       High-voltage board&amp;lt;br&amp;gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;O          Standoff/set screw of installation/removal.&amp;lt;br&amp;gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;                                O&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;                               @=============================@&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;                                                            O&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Thu, 19 Nov 2009 20:22:17 GMT</pubDate>			<dc:creator>Whitey</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:November_20%2C_2009_CDC_Meeting</comments>		</item>
		<item>
			<title>Tracking Meetings</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Tracking_Meetings</link>
			<description>&lt;p&gt;/* CDC Meetings in 2009 */ &lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 20:15, 19 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 36:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 36:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;== CDC Meetings in 2009 ==&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;== CDC Meetings in 2009 ==&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&amp;lt;table&amp;gt;&amp;lt;tr&amp;gt;&amp;lt;td width=250&amp;gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&amp;lt;table&amp;gt;&amp;lt;tr&amp;gt;&amp;lt;td width=250&amp;gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;*  [[Talk:September 30, 2009 CDC Meeting]]&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;*  [[November 20, 2009 CDC Meeting]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;*  [[November 20, 2009 CDC Meeting]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;*  [[October 12, 2009 CDC Meeting]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;*  [[October 12, 2009 CDC Meeting]]&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Thu, 19 Nov 2009 20:15:46 GMT</pubDate>			<dc:creator>Whitey</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:Tracking_Meetings</comments>		</item>
		<item>
			<title>November 20, 2009 CDC Meeting</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/November_20%2C_2009_CDC_Meeting</link>
			<description>&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;== Meeting Time and Place ==&lt;br /&gt;
&lt;br /&gt;
Friday November 20, 2009 at 10:30am &lt;br /&gt;
At Jefferson Lab, the meeting will be held in room ARC 428&lt;br /&gt;
&lt;br /&gt;
== Connections ==&lt;br /&gt;
To connect from the outside, please use ESNET&amp;lt;br/&amp;gt;&lt;br /&gt;
1.) ESNET: 8542553&amp;lt;br/&amp;gt;&lt;br /&gt;
2.) Phone:&amp;lt;br&amp;gt;&lt;br /&gt;
+1-800-377-8846 : US&amp;lt;br/&amp;gt;&lt;br /&gt;
+1-888-276-7715 : Canada&amp;lt;br/&amp;gt;&lt;br /&gt;
+1-302-709-8424 : International&amp;lt;br/&amp;gt;&lt;br /&gt;
then enter participant code: 77438230# (remember the &amp;quot;#&amp;quot;)&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Agenda ==&lt;br /&gt;
* Discuss Crimp pin design and manufacture&lt;br /&gt;
* Review spacer tube sealing&lt;br /&gt;
* Review Slava HV board mounting [[http://www.jlab.org/~vgr/CDC%2011-10-2009/]]&lt;br /&gt;
* Straw testing&lt;br /&gt;
&lt;br /&gt;
==New Action Items==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Action Items/Decisions from Previous Meeting==&lt;br /&gt;
* Slava to layout new setup to attach one connector stud to al plate and attach HV board directly to connector. will relocate connectors and check clearances with 8mm bend rad in wire&lt;br /&gt;
* Tim to pursue Medelec 2 piece crimp pin quotes. Medelec said they could not make the one designed&lt;br /&gt;
** Medelec will not make any more copper crimp pins of any design unless the order had already been placed. Tim Investigated other manufacturers to no avail. Hole/length ratio too small&lt;br /&gt;
* Beni to complete rad tests of straws in the next couple of weeks and send straws back to CMU for test&lt;br /&gt;
** straws back at CMU&lt;br /&gt;
* Have endplates delivered to JLAB for spot check of hole coordinates. Tim to arrange with survey group&lt;br /&gt;
** Vendor to independently check with Faro arm. Do we still widh to bring these to JLAB?&lt;br /&gt;
* Fernando to look at stripping tools to reduce the need for large pcb on connector&lt;br /&gt;
**&amp;lt;font color=blue&amp;gt; Stripping tool located, inner pad 3mm, 2mm gap , HV outer pad 6mm. Total wdth of pcb 30.5mm, 8mm bend rad required for cable&amp;lt;/font&amp;gt;&lt;br /&gt;
== Notes ==&lt;br /&gt;
# O-ring: The O-ring used on the prototype is a #103 BUNA-N Soft. The through-hole is 156 and the shoulder is a 9/32 into which the O-ring is forced.&lt;br /&gt;
# Small modifications to connector/grounding assembly [[Image:CDC Connector.pdf]]&lt;br /&gt;
* Slava will layout Fernando's stud grounding option&lt;br /&gt;
**&amp;lt;font color=blue&amp;gt; Opted for connector to al plate standoff stud design&amp;lt;/font&amp;gt;&lt;br /&gt;
* Gary to supply sketch of CMU grounding option&lt;br /&gt;
**&amp;lt;font color=blue&amp;gt; see below&amp;lt;/font&amp;gt;&lt;br /&gt;
* Gary to check if he can still get conductive rubber boot used previously&lt;br /&gt;
* Slava to update layout of cable to crimp pin per discussion&lt;br /&gt;
* Tim to see if cable restraint bushing can be made&lt;br /&gt;
* What needs to be done on al plate to ensure electrical connection? all&lt;br /&gt;
**&amp;lt;font color=blue&amp;gt; Decided on local cleaning and prep during assy&amp;lt;/font&amp;gt;&lt;br /&gt;
* Gary to get sample of polycarbonate to test&lt;br /&gt;
&lt;br /&gt;
==Ground HV Card Through Standoff==&lt;br /&gt;
Attached is a rough sketch showing the proposed stand-off scheme. [[Image:Standoff.pdf| pdf file]]&lt;br /&gt;
#) A 6/32 blind threaded hole is drilled in the endplate.&lt;br /&gt;
#) A 6/32 set screw is screwed into the hole. We can use conducting epoxy to improve the connection if needed.&lt;br /&gt;
#) A 1/4 inch electrical standoff with a 6/32 tapped hole is screwed onto the set screw. There are three possible variations on this for the end in contact with the endplate.&lt;br /&gt;
##) There is room for the 1/4 inch, nothing specicial&lt;br /&gt;
##) There is not quite enough room for the 1/4 inch due to the  heads of the feedthrus extending 1/10&amp;quot; above the surface of the plate. We can order a standard 1/4 standoff that has a diameter of 188 for the last .133 inches. This comes from McMaster-Carr.&lt;br /&gt;
##) Or we can make in house modifications:&lt;br /&gt;
###) we can (in house as needed) taper the end of the standof down to ~188 from 250 so it will fit,&lt;br /&gt;
###) we can (in house) as needed remove some material from the head of the feed throughs so that the 1/4 in can reach the endplate.&lt;br /&gt;
#) A .156 inch hole is drilled through the lucite plate.&lt;br /&gt;
#) A 6/32 set screw goes through the lucite plate and screws into the standoff.&lt;br /&gt;
#) Epoxy, or conducting epoxy in placed around the 6/32 set screw.&lt;br /&gt;
#) A  1/4 inch electrical standoff with blind 6/32 holes is screwed&lt;br /&gt;
#) The connector is attached to the standoff.&lt;br /&gt;
&lt;br /&gt;
==Mounting the HV card==&lt;br /&gt;
We also would like to propose the standoffs that hold the HV card be on opposite sides of the card, rather than both on the same side. This gives less chance that the card will tilt during installation and removal.&amp;lt;br&amp;gt;&lt;br /&gt;
@===       High-voltage board&amp;lt;br&amp;gt;&lt;br /&gt;
O          Standoff/set screw of installation/removal.&amp;lt;br&amp;gt;&lt;br /&gt;
&lt;br /&gt;
                                O&lt;br /&gt;
                               @=============================@&lt;br /&gt;
                                                            O&lt;/div&gt;</description>
			<pubDate>Thu, 19 Nov 2009 20:15:30 GMT</pubDate>			<dc:creator>Whitey</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:November_20%2C_2009_CDC_Meeting</comments>		</item>
		<item>
			<title>Tracking Meetings</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Tracking_Meetings</link>
			<description>&lt;p&gt;/* CDC Meetings in 2009 */ &lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 20:14, 19 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 36:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 36:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;== CDC Meetings in 2009 ==&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;== CDC Meetings in 2009 ==&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&amp;lt;table&amp;gt;&amp;lt;tr&amp;gt;&amp;lt;td width=250&amp;gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&amp;lt;table&amp;gt;&amp;lt;tr&amp;gt;&amp;lt;td width=250&amp;gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;*  [[Talk:September 30, 2009 CDC Meeting]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;*  [[November 20, 2009 CDC Meeting]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;*  [[October 12, 2009 CDC Meeting]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;*  [[October 12, 2009 CDC Meeting]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&amp;lt;/td&amp;gt;&amp;lt;td width=250&amp;gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&amp;lt;/td&amp;gt;&amp;lt;td width=250&amp;gt;&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Thu, 19 Nov 2009 20:14:59 GMT</pubDate>			<dc:creator>Whitey</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:Tracking_Meetings</comments>		</item>
		<item>
			<title>Talk:September 30, 2009 CDC Meeting</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:September_30%2C_2009_CDC_Meeting</link>
			<description>&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;== Meeting Time and Place ==&lt;br /&gt;
&lt;br /&gt;
Friday November 20, 2009 at 10:30am &lt;br /&gt;
At Jefferson Lab, the meeting will be held in room ARC 428&lt;br /&gt;
&lt;br /&gt;
== Connections ==&lt;br /&gt;
To connect from the outside, please use ESNET&amp;lt;br/&amp;gt;&lt;br /&gt;
1.) ESNET: 8542553&amp;lt;br/&amp;gt;&lt;br /&gt;
2.) Phone:&amp;lt;br&amp;gt;&lt;br /&gt;
+1-800-377-8846 : US&amp;lt;br/&amp;gt;&lt;br /&gt;
+1-888-276-7715 : Canada&amp;lt;br/&amp;gt;&lt;br /&gt;
+1-302-709-8424 : International&amp;lt;br/&amp;gt;&lt;br /&gt;
then enter participant code: 77438230# (remember the &amp;quot;#&amp;quot;)&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
== Agenda ==&lt;br /&gt;
* Discuss Crimp pin design and manufacture&lt;br /&gt;
* Review spacer tube sealing&lt;br /&gt;
* Review Slava HV board mounting [[http://www.jlab.org/~vgr/CDC%2011-10-2009/]]&lt;br /&gt;
* Straw testing&lt;br /&gt;
&lt;br /&gt;
==New Action Items==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==Action Items/Decisions from Previous Meeting==&lt;br /&gt;
* Slava to layout new setup to attach one connector stud to al plate and attach HV board directly to connector. will relocate connectors and check clearances with 8mm bend rad in wire&lt;br /&gt;
* Tim to pursue Medelec 2 piece crimp pin quotes. Medelec said they could not make the one designed&lt;br /&gt;
** Medelec will not make any more copper crimp pins of any design unless the order had already been placed. Tim Investigated other manufacturers to no avail. Hole/length ratio too small&lt;br /&gt;
* Beni to complete rad tests of straws in the next couple of weeks and send straws back to CMU for test&lt;br /&gt;
** straws back at CMU&lt;br /&gt;
* Have endplates delivered to JLAB for spot check of hole coordinates. Tim to arrange with survey group&lt;br /&gt;
** Vendor to independently check with Faro arm. Do we still widh to bring these to JLAB?&lt;br /&gt;
* Fernando to look at stripping tools to reduce the need for large pcb on connector&lt;br /&gt;
**&amp;lt;font color=blue&amp;gt; Stripping tool located, inner pad 3mm, 2mm gap , HV outer pad 6mm. Total wdth of pcb 30.5mm, 8mm bend rad required for cable&amp;lt;/font&amp;gt;&lt;br /&gt;
== Notes ==&lt;br /&gt;
# O-ring: The O-ring used on the prototype is a #103 BUNA-N Soft. The through-hole is 156 and the shoulder is a 9/32 into which the O-ring is forced.&lt;br /&gt;
# Small modifications to connector/grounding assembly [[Image:CDC Connector.pdf]]&lt;br /&gt;
* Slava will layout Fernando's stud grounding option&lt;br /&gt;
**&amp;lt;font color=blue&amp;gt; Opted for connector to al plate standoff stud design&amp;lt;/font&amp;gt;&lt;br /&gt;
* Gary to supply sketch of CMU grounding option&lt;br /&gt;
**&amp;lt;font color=blue&amp;gt; see below&amp;lt;/font&amp;gt;&lt;br /&gt;
* Gary to check if he can still get conductive rubber boot used previously&lt;br /&gt;
* Slava to update layout of cable to crimp pin per discussion&lt;br /&gt;
* Tim to see if cable restraint bushing can be made&lt;br /&gt;
* What needs to be done on al plate to ensure electrical connection? all&lt;br /&gt;
**&amp;lt;font color=blue&amp;gt; Decided on local cleaning and prep during assy&amp;lt;/font&amp;gt;&lt;br /&gt;
* Gary to get sample of polycarbonate to test&lt;br /&gt;
&lt;br /&gt;
==Ground HV Card Through Standoff==&lt;br /&gt;
Attached is a rough sketch showing the proposed stand-off scheme. [[Image:Standoff.pdf| pdf file]]&lt;br /&gt;
#) A 6/32 blind threaded hole is drilled in the endplate.&lt;br /&gt;
#) A 6/32 set screw is screwed into the hole. We can use conducting epoxy to improve the connection if needed.&lt;br /&gt;
#) A 1/4 inch electrical standoff with a 6/32 tapped hole is screwed onto the set screw. There are three possible variations on this for the end in contact with the endplate.&lt;br /&gt;
##) There is room for the 1/4 inch, nothing specicial&lt;br /&gt;
##) There is not quite enough room for the 1/4 inch due to the  heads of the feedthrus extending 1/10&amp;quot; above the surface of the plate. We can order a standard 1/4 standoff that has a diameter of 188 for the last .133 inches. This comes from McMaster-Carr.&lt;br /&gt;
##) Or we can make in house modifications:&lt;br /&gt;
###) we can (in house as needed) taper the end of the standof down to ~188 from 250 so it will fit,&lt;br /&gt;
###) we can (in house) as needed remove some material from the head of the feed throughs so that the 1/4 in can reach the endplate.&lt;br /&gt;
#) A .156 inch hole is drilled through the lucite plate.&lt;br /&gt;
#) A 6/32 set screw goes through the lucite plate and screws into the standoff.&lt;br /&gt;
#) Epoxy, or conducting epoxy in placed around the 6/32 set screw.&lt;br /&gt;
#) A  1/4 inch electrical standoff with blind 6/32 holes is screwed&lt;br /&gt;
#) The connector is attached to the standoff.&lt;br /&gt;
&lt;br /&gt;
==Mounting the HV card==&lt;br /&gt;
We also would like to propose the standoffs that hold the HV card be on opposite sides of the card, rather than both on the same side. This gives less chance that the card will tilt during installation and removal.&amp;lt;br&amp;gt;&lt;br /&gt;
@===       High-voltage board&amp;lt;br&amp;gt;&lt;br /&gt;
O          Standoff/set screw of installation/removal.&amp;lt;br&amp;gt;&lt;br /&gt;
&lt;br /&gt;
                                O&lt;br /&gt;
                               @=============================@&lt;br /&gt;
                                                            O&lt;/div&gt;</description>
			<pubDate>Thu, 19 Nov 2009 20:08:33 GMT</pubDate>			<dc:creator>Whitey</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:September_30%2C_2009_CDC_Meeting</comments>		</item>
		<item>
			<title>Minutes-11-19-2009</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Minutes-11-19-2009</link>
			<description>&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;FDC Weekly Meeting&lt;br /&gt;
&lt;br /&gt;
Date: November 19, 2009&lt;br /&gt;
&lt;br /&gt;
Participants: Daniel, Mark S., Beni, Bill, Casey, Simon, Mark I., Eugene, Glenn, Brian&lt;br /&gt;
&lt;br /&gt;
Next Meeting: November 26, 2009 @ 1:30 a.m.&lt;br /&gt;
-----------------------------------------------------------------------&lt;br /&gt;
==General Construction Updates==&lt;br /&gt;
  - We are still battling with leak isses associated with the gas spacers.&lt;br /&gt;
    We have two different versions. One uses a harder o-ring (50 durometer) &lt;br /&gt;
    and the other a softer o-ring (8 durometer) built up with an 8-mil tape &lt;br /&gt;
    shim down in the o-ring trough. On frame P1, which is installed in the &lt;br /&gt;
    single-layer prototype, it also has a few gas leaks up through the vias on &lt;br /&gt;
    one protion of the STB. Casey has attempt to seal these up. Given also &lt;br /&gt;
    that the spacer ring must pass across signal traces that stick up by 3 to &lt;br /&gt;
    4 mils (!), it may be that we will just have to do the best we can and make&lt;br /&gt;
    do. But there has got to be a better design solution so that we are not &lt;br /&gt;
    forced to battle a leaky chamber until the end of time.&lt;br /&gt;
  - Fernando has completed his test plan on the single layer prototype using &lt;br /&gt;
    a single anode preamp board and a single cathode preamp board, both &lt;br /&gt;
    stuffed with the new GAS-II preamps. He is preparing a write-up of his&lt;br /&gt;
    results that will be distributed soon. Fernando did not encounter any&lt;br /&gt;
    surprises and all seemed to follow expectations (chamber and preamp boards). &lt;br /&gt;
    As a quick summary, the signal-to-noise levels on the cathode strip signals &lt;br /&gt;
    were about 20 to 1. This is likely due to the jury-rigged readout connection &lt;br /&gt;
    and use of an oscilloscope that was known to generate significant EMF. &lt;br /&gt;
    Firmer numbers will be extracted at a later time. It looked like the &lt;br /&gt;
    performance of the long wires and the short wires was very similar. Same for &lt;br /&gt;
    the long cathode strips and the short cathode strips.&lt;br /&gt;
  - A comparison of the single-layer FDC prototype in a horizontal vs. a&lt;br /&gt;
    vertical configuration revealed no obvious differences in performance.&lt;br /&gt;
    This is good news as a sizeable portion of our test plan calls for using&lt;br /&gt;
    cosmic rays with the chamber in a horizontal orientation.&lt;br /&gt;
  - The issue with the voltage differences between the full-scale prototype&lt;br /&gt;
    and the small-scale prototype has been fully resolved. We took a sense&lt;br /&gt;
    wire sample from a small-scale prototype wire plane and measured its&lt;br /&gt;
    diameter to be 25 um. We have 20 um diameter wire in the full-scale&lt;br /&gt;
    prototype. This size difference explains the different plateau voltages.&lt;br /&gt;
    DSC verified this with GARFIELD calculations of the chamber gain.&lt;br /&gt;
  - It turns out that only a portion of the production wire order for the FDC &lt;br /&gt;
    and CDC has arrived. 4 spools of 20 um W wire and 4 spools of 80 um Cu-Be &lt;br /&gt;
    wire. Each spool holds 1000 m. DSC and Bill met with the SEM folks for an &lt;br /&gt;
    information exchange meeting. We prepared a set of testing instructions and &lt;br /&gt;
    circulated it to Curtis and Eugene. It has been turned over to the SEM folks &lt;br /&gt;
    who are working on a quote.&lt;br /&gt;
  - The plan for the next several days is to add the second layer to the&lt;br /&gt;
    prototype. The system will be leak checked and HV checks will be performed.&lt;br /&gt;
    We will spot check some of the wire and cathode signals to be sure that&lt;br /&gt;
    there are no gross differences with what we have already seen. We expect&lt;br /&gt;
    to be ready to add the third layer after that.&lt;br /&gt;
  - The parts n' pieces for the third full-scale prototype layer will not be&lt;br /&gt;
    ready until after Thanksgiving unless Mark and Casey can finish cathode&lt;br /&gt;
    preparations and cathode to wire frame lamination next week. The plan is&lt;br /&gt;
    to have the full-scale prototype assembly completed by December 4.&lt;br /&gt;
  - The preliminary FDC stack assembly document draft is located at:&lt;br /&gt;
    /u/group/halld/Engineering/PRELIMINARY DOCUMENTS. The document will &lt;br /&gt;
    continue to be fleshed out during the assembly procedure for the &lt;br /&gt;
    full-scale prototype. We will have to add steps in our construction plans &lt;br /&gt;
    for leak checking.&lt;br /&gt;
&lt;br /&gt;
==Wire Frame Update==&lt;br /&gt;
  - Wire frame P4 has completed its electrical QA check after several minor&lt;br /&gt;
    repairs associated with soldering problems with the preamp connectors. &lt;br /&gt;
    The components and regions that gave us HV breakdown problems on P1 have &lt;br /&gt;
    been potted in Humaseal. Wire frame P3 will then follow.&lt;br /&gt;
  - Wire frame P4 has been laminated to its associated cathode (that is part&lt;br /&gt;
    of a cathode sandwich). This frame structure is ready for inclusion as&lt;br /&gt;
    part of the second layer of the stack.&lt;br /&gt;
  - We need to have a dedicated meeting to design what the schedule for&lt;br /&gt;
    work on the Phase 3 wire winding will be. The highest priority for&lt;br /&gt;
    work scheduling will be doing work on upgrades of the wire winding&lt;br /&gt;
    facility. This includes a better strongback design, the design and&lt;br /&gt;
    construction of precision combs, modification to the wire winding&lt;br /&gt;
    table, and a list of other items with the system. Stay tuned, more&lt;br /&gt;
    to come.&lt;br /&gt;
  - The wire frame construction document is located at:&lt;br /&gt;
    /u/group/halld/Engineering/PRELIMINARY DOCUMENTS. He will include&lt;br /&gt;
    the information on the wire electroplating process as well.&lt;br /&gt;
  - The parts of the jig to use for the wire electroplating operation&lt;br /&gt;
    are in our hands. They will be assembled as we find time.&lt;br /&gt;
  - We need to prepare a document for the electrical QA of the preamp&lt;br /&gt;
    connectors on the wire boards.&lt;br /&gt;
  - DSC, Bill, and Fernando will plan a meeting to go over the circuit&lt;br /&gt;
    board design work for Kim.&lt;br /&gt;
  - Kim is following up with the contacts obtained from Peter Monaghan &lt;br /&gt;
    regarding large-area PCBs. Kim is still in back and forth with the&lt;br /&gt;
    board house and the board material supplier. The outlook may be rosier&lt;br /&gt;
    than it was a few years ago. Stay tuned.&lt;br /&gt;
&lt;br /&gt;
==Cathode Update==&lt;br /&gt;
  - Progress updates:&lt;br /&gt;
      * Casey has been working on soldering rigid-flex assemblies to the&lt;br /&gt;
        second of our two cathode sandwiches. Soldering work on the first&lt;br /&gt;
        sandwich has been completed and electrical QA checks are done.&lt;br /&gt;
      * Even though we are nearly done with the soldering of the rigid-flex&lt;br /&gt;
        assemblies, we ordered another stencil and will use it for the&lt;br /&gt;
        remaining soldering work.&lt;br /&gt;
      * The conducting epoxy used to attach the cathode board grounds between&lt;br /&gt;
        the three cathode boards that make up a single panel were starting&lt;br /&gt;
        to peel off. Casey has improved the design using copper tape.&lt;br /&gt;
  - The current draft of the cathode construction document is located at:&lt;br /&gt;
    /u/group/halld/Engineering/PRELIMINARY DOCUMENTS.&lt;br /&gt;
  - We need to prepare a document for QA/stuffing/cleaning for the cathode &lt;br /&gt;
    boards and a similar document for the cathode daughter boards and ground &lt;br /&gt;
    boards.&lt;br /&gt;
&lt;br /&gt;
==Preamplifier Boards==&lt;br /&gt;
  - An order for more ASIC chips is expected very shortly. Fernando expects&lt;br /&gt;
    that we will have ~40 boards ready by the end of November.&lt;br /&gt;
&lt;br /&gt;
==Cosmic Ray Test Stand==&lt;br /&gt;
  - Several meetings ago we focussed on the wiggles seen in the reconstructed &lt;br /&gt;
    wire position from the cathodes (see [http://www.jlab.org/htbin/PHYSICS/halld/enote112.pl?nb=notebook&amp;amp;action=view&amp;amp;page=419 log entry 419]) in the&lt;br /&gt;
    FDC logbook. We believe that the periodicity seen is due to the algorithm&lt;br /&gt;
    Beni is using to determine the U and V centroids. Beni get back to this&lt;br /&gt;
    soon. Stay tuned.&lt;br /&gt;
&lt;br /&gt;
==Work List==&lt;br /&gt;
  - The FDC short-term work list has been posted on the [http://www.jlab.org/Hall-D/detector/fdc/ FDC web site].  &lt;br /&gt;
    This is continually being updated and DSC welcomes any feedback or &lt;br /&gt;
    comments from the group.&lt;br /&gt;
 &lt;br /&gt;
Minutes prepared by Daniel.  Send any comments or corrections along.&lt;/div&gt;</description>
			<pubDate>Thu, 19 Nov 2009 19:46:56 GMT</pubDate>			<dc:creator>Carman</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:Minutes-11-19-2009</comments>		</item>
		<item>
			<title>Special:Log/upload</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Special:Log/upload</link>
			<description>&lt;p&gt;uploaded &amp;quot;[[Image:Lamina-thick-notused.jpg]]&amp;quot;&lt;/p&gt;
</description>
			<pubDate>Thu, 19 Nov 2009 17:34:36 GMT</pubDate>			<dc:creator>Yvhaarle</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Log/upload</comments>		</item>
		<item>
			<title>Cut open straws</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Cut_open_straws</link>
			<description>&lt;p&gt;&lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 17:33, 19 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 27:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 27:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;|width=&amp;quot;415pt&amp;quot;|[[Image:Lamina-thick-irr.jpg|thumb|none|400px|Lamina-thick straw irradiated.]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;|width=&amp;quot;415pt&amp;quot;|[[Image:Lamina-thick-irr.jpg|thumb|none|400px|Lamina-thick straw irradiated.]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;|width=&amp;quot;415pt&amp;quot;|[[Image:Lamina-thick-notirr.jpg|thumb|none|400px|Lamina-thick straw not irradiated.]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;|width=&amp;quot;415pt&amp;quot;|[[Image:Lamina-thick-notirr.jpg|thumb|none|400px|Lamina-thick straw not irradiated.]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;|width=&amp;quot;415pt&amp;quot;|[[Image:Lamina-thick-notused.jpg|thumb|none|400px|Lamina-thick straw - not irradiated.]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;|-&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;|-&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;|}&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;|}&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Thu, 19 Nov 2009 17:33:30 GMT</pubDate>			<dc:creator>Yvhaarle</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:Cut_open_straws</comments>		</item>
		<item>
			<title>BCAL Readout</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/BCAL_Readout</link>
			<description>&lt;p&gt;/* Agenda/Minutes By Date */ &lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 04:36, 19 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 1:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 1:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;== Agenda/Minutes By Date ==&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;== Agenda/Minutes By Date ==&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;* [[Nov 19, 2009 Readout]]&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;* [[Nov 19, 2009 Readout]] &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;Cancelled&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Oct 22, 2009 Readout]] Cancelled due to Bcal Readiness Review at Regina&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Oct 22, 2009 Readout]] Cancelled due to Bcal Readiness Review at Regina&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Oct 22, 2009 Readout]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[Oct 22, 2009 Readout]]&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Thu, 19 Nov 2009 04:36:48 GMT</pubDate>			<dc:creator>Elton</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:BCAL_Readout</comments>		</item>
		<item>
			<title>November 23, 2009 (11AM), Physics Working Group</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/November_23%2C_2009_%2811AM%29%2C_Physics_Working_Group</link>
			<description>&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;== Connect Information ==&lt;br /&gt;
&lt;br /&gt;
ESNET and EVO will be available:&lt;br /&gt;
&lt;br /&gt;
1. ESNET: 85-42553   (85-HALLD)&lt;br /&gt;
&lt;br /&gt;
2. An EVO room under GlueX will be reserved&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Agenda ==&lt;/div&gt;</description>
			<pubDate>Wed, 18 Nov 2009 22:08:08 GMT</pubDate>			<dc:creator>Remitche</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:November_23%2C_2009_%2811AM%29%2C_Physics_Working_Group</comments>		</item>
		<item>
			<title>Physics Working Group Meetings</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Physics_Working_Group_Meetings</link>
			<description>&lt;p&gt;/* Meetings in 2009 */ &lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 22:07, 18 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 1:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 1:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;== Meetings in 2009 ==&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;== Meetings in 2009 ==&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;* [[November 23, 2009 (11AM), Physics Working Group]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* work done by Pawel (10/26/2009):  [[Image:eta-sim-at-gluex-prot.pdf]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* work done by Pawel (10/26/2009):  [[Image:eta-sim-at-gluex-prot.pdf]]&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[October 12, 2009 (11:15AM), Physics Working Group]]&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;* [[October 12, 2009 (11:15AM), Physics Working Group]]&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Wed, 18 Nov 2009 22:07:31 GMT</pubDate>			<dc:creator>Remitche</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:Physics_Working_Group_Meetings</comments>		</item>
		<item>
			<title>Action Items From Hall-D Software Meetings</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/Action_Items_From_Hall-D_Software_Meetings</link>
			<description>&lt;p&gt;add 11/17 items&lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 20:15, 18 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 1:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 1:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;This is a cumulative Action item list from Hall-D software meetings. Items are added as a result of discussion at the bi-weekly software meetings and are marked off as they are completed.&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;This is a cumulative Action item list from Hall-D software meetings. Items are added as a result of discussion at the bi-weekly software meetings and are marked off as they are completed.&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;=== [[GlueX Offline Meeting, November 17, 2009|November 17, 2009]] ===&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;# Note the no-warning policy in the coding conventions.&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;# Put the coding standards into version control system.&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;----&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;=== [[GlueX Offline Meeting, November 4, 2009|November 4, 2009]] ===&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;=== [[GlueX Offline Meeting, November 4, 2009|November 4, 2009]] ===&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Wed, 18 Nov 2009 20:15:18 GMT</pubDate>			<dc:creator>Marki</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:Action_Items_From_Hall-D_Software_Meetings</comments>		</item>
		<item>
			<title>GlueX Offline Meeting, November 17, 2009</title>
			<link>http://www.jlab.org/Hall-D/software/wiki/index.php/GlueX_Offline_Meeting%2C_November_17%2C_2009</link>
			<description>&lt;p&gt;/* Minutes */ first draft&lt;/p&gt;

			&lt;table border='0' width='98%' cellpadding='0' cellspacing='4' style=&quot;background-color: white;&quot;&gt;
			&lt;tr&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Revision as of 19:56, 18 November 2009&lt;/td&gt;
				&lt;td colspan='2' width='50%' align='center' style=&quot;background-color: white;&quot;&gt;Current revision&lt;/td&gt;
			&lt;/tr&gt;
			&lt;tr&gt;&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 35:&lt;/strong&gt;&lt;/td&gt;
&lt;td colspan=&quot;2&quot; align=&quot;left&quot;&gt;&lt;strong&gt;Line 35:&lt;/strong&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;'''JLab''': Craig Bookwalter, Mark Ito (chair), David Lawrence, Sascha Somov, Simon Taylor, Aram Teymurazyan&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;'''JLab''': Craig Bookwalter, Mark Ito (chair), David Lawrence, Sascha Somov, Simon Taylor, Aram Teymurazyan&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;euguene gave suggestion parmamtetrize in phi, keep map in r-z&lt;/span&gt;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;==Review of the Minutes from the Last Meeting==&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;drop parametrization for now&lt;/span&gt;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;coding suggestions incorporated&lt;/span&gt;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;We went over the [[GlueX Offline Meeting&lt;/span&gt;, &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;November 4&lt;/span&gt;, &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;2009#Minutes|minutes of the meeting on November 4]]. David mentioned that he did get a suggestion from Eugene Chudakov on how he might approach a parametrization of a three-dimensional magnetic field.&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;virtual destructors&lt;/span&gt;, &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;compilers do not give errors&lt;/span&gt;, &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;left it in&lt;/span&gt;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;dave will send mail saying that&lt;/span&gt;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;==Next Action on Coding Rules==&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;td&gt; &lt;/td&gt;&lt;td style=&quot;background: #eee; font-size: smaller;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;-&lt;/td&gt;&lt;td style=&quot;background: #ffa; font-size: smaller;&quot;&gt;warning-free code policy &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;of &lt;/span&gt;collaboration&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;David reported that he incorporated all suggestions made at the last meeting, with the exception of the suggestion to drop the &amp;quot;virtual destructor&amp;quot; rule. He could not generate a compiler error when the rule is violated, and so the rule has been retained.&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;We decided to vote on formal adoption of the rules at the next meeting. David will write to the email list announcing this.&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;==Warning-Free Code Policy==&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;Craig proposed that we make it a policy that code build without warnings. There was some discussion:&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* David noted that when the code is tried on a new platform, warnings may arise. Often the original developer will have difficulty getting access to the new platform, a complication if &lt;/span&gt;warning-free code &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;is the &lt;/span&gt;policy&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;. We thought that if a good-faith effort is made in these cases the &lt;/span&gt;collaboration &lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;would be satisfied.&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* There may be cases where the warnings on some platforms require a substantial amount of effort to fix while causing no real problem in code excecution. Mark thought that in those cases, an exception to the policy could be made. This would have to be noted in the comments inside the code. This addresses the concern in the previous bullet (to some extent).&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;With these caveats in mind, we adopted the policy.&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;==Action Item Review==&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;We went over the [[Action Items From Hall-D Software Meetings|list]].&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* Mark promised to present the new &amp;quot;Offline Computing&amp;quot; project plan at the next meeting.&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* Richard has promised to give us a presentation on the OSG soon.&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;* There were several items that need to the crossed off the list.&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;==New Action Items==&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&amp;#160;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt;&amp;nbsp;&lt;/td&gt;&lt;td&gt;+&lt;/td&gt;&lt;td style=&quot;background: #cfc; font-size: smaller;&quot;&gt;&lt;span style=&quot;color: red; font-weight: bold;&quot;&gt;# Note the no-warning policy in the coding conventions.&lt;/span&gt;&lt;/td&gt;&lt;/tr&gt;

			&lt;/table&gt;
		</description>
			<pubDate>Wed, 18 Nov 2009 19:56:45 GMT</pubDate>			<dc:creator>Marki</dc:creator>			<comments>http://www.jlab.org/Hall-D/software/wiki/index.php/Talk:GlueX_Offline_Meeting%2C_November_17%2C_2009</comments>		</item>
	</channel>
</rss>