Date Task
4/6/2010
4/7/2010 Pulled monitor RBM-2 to troubleshoot power supply issue.
4/9/2010 Set Hall A Ion Chamber readbacks and installed new Ion Chamber beside target Ion Chamber.
4/12/2010 Repaired VTA monitor 403. Defective power supply.
4/15/2010 Repaired RBM-2 power supplies. More on order.
4/16/2010 RBM-6 cycled power for Pavel's equipment.
4/192010 Troubleshooting FH-40G/sn. 11074 telescoping aparatus wiring problem.
4/20/2010 Teletector 6112B / sn. 101891 control knob problem fixed.
4/21/2010 VTA PSS Certification
4/23/2010 FEL Certification
4/28/2010 CMTF Certification
4/30/2010 Test Lab CARM problem fixed. Bad serial card that feeds the IOC.