Date |
Task |
2/1/2010 |
Snow Day |
2/2/2010 |
Troubleshooting FEL
communication problem |
2/3/2010 |
Special OSL badge exposure test. |
2/4/2010 |
Power outage/brown out. |
2/5/2010 |
Power outage/brown out recovery.
Calibration procedure. |
2/8/2010 |
|
2/9/2010 |
RM01 Locked up and probe 1
replaced. PSS problem. RM20 not functioning properly. |
2/10/2010 |
RM20(SL) checkout. SLAC NP-100s
returned. Octirad setup. |
2/10/2010 |
SLAC NP-100s to S and R. |
2/11/2010 |
Moved conduit for gate gamma
probe (401-1) in the VTA. |
2/17/2010 |
Print calibration certificates |
2/18/2010 |
Submit procedure Cal-33. |
2/18/2010 |
Repaired FH-40G SN. 11116, loose
connection in probe. |
2/19/2010 |
Partial PSS Cert. (CARMS for the
Halls) |
2/23/2010 |
uREM/2130 displays light
sensitivity. Found puncture in mylar window. Swapped mylar components w/
uREM/1812. Then patched windows on 1812. |
|
|
|
|