Date Task
2/1/2010 Snow Day
2/2/2010 Troubleshooting FEL communication problem
2/3/2010 Special OSL badge exposure test.
2/4/2010 Power outage/brown out.
2/5/2010 Power outage/brown out recovery. Calibration procedure.
2/8/2010
2/9/2010 RM01 Locked up and probe 1 replaced. PSS problem. RM20 not functioning properly.
2/10/2010 RM20(SL) checkout. SLAC NP-100s returned. Octirad setup.
2/10/2010 SLAC NP-100s to S and R.
2/11/2010 Moved conduit for gate gamma probe (401-1) in the VTA. 
2/17/2010 Print calibration certificates
2/18/2010 Submit procedure Cal-33.
2/18/2010 Repaired FH-40G SN. 11116, loose connection in probe.
2/19/2010 Partial PSS Cert. (CARMS for the Halls)
2/23/2010 uREM/2130 displays light sensitivity. Found puncture in mylar window. Swapped mylar components w/ uREM/1812. Then patched windows on 1812.