Date Task
7/1/2010 Installing Hall C ion chambers and routing cables.
7/2/2010 All Hall C chambers installed, cabling for Lumi not installed. 
7/6/2010 Ran HV and signal cables for Lumi. Dave says target ion chamber must be moved, Hall C will remove.
7/7/2010 Label Hall C ion chamber cables and reinstalled the target chamber ion chamber (#4).
7/7/2010 Ran neutron standard, Gamma standard readings unavailable due to RadCal 1515 unit not charged.
7/12/2010 Mel setup special test with neutron source in cal-range.