Date |
Task |
6/2/2010 |
Performed quick cal on the 2
gamma probes in the ITC for Riad. |
6/2/2010 |
Reinstalled RM44 for Hall A
after modifications. |
6/9/2010 |
Terminated ion chamber cable and
located and tested 7 of 8 cables. 8th cable (#1) may have been cut. |
6/10/2010 |
Percy and Scott helped pull in
cable for transport tunnel platform. |
6/17/2010 |
IP-100 repairs. |
6/18/2010 |
Installed ion chambers 1 - 3 in
Hall C. |
6/18/2010 |
Refridgerator updated with new probe positions and
numbers. |
6/23/2010 |
Ion Chamber test box training
and setup on ion chambers 1 and 2. (Rich and Scott) |
6/23/2010 |
Replaced BSY gamma probe. |
6/25/2010 |
Installed ion chamber 6 (sieve
box) in Hall A. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|