Date | Equip. / SN. | Note / Problem |
6/3/2010 | RM01 | P3 may need to be initialized. Unit came up needing to be reset. Reset for Injector lock-up. |
6/18/2010 | Ion Chambers | Dave Siedman showed how to update the refridgerator. (Hall C) |
6/22/2010 | Ion Chambers | Repaired Red Box for ion chamber testing. |
6/24/2010 | SRPD / CI-4961 | Replaced cracked housing with another disabled unit. |
6/25/2010 | Ion Chambers | Installed ion chamber 6 (sieve box) in Hall A. |