Date Equip. / SN. Note / Problem
6/3/2010 RM01 P3 may need to be initialized. Unit came up needing to be reset. Reset for Injector lock-up.
6/18/2010 Ion Chambers Dave Siedman showed how to update the refridgerator. (Hall C)
6/22/2010 Ion Chambers Repaired Red Box for ion chamber testing.
6/24/2010 SRPD / CI-4961 Replaced cracked  housing with another disabled unit.
6/25/2010 Ion Chambers Installed ion chamber 6 (sieve box) in Hall A.