Date Task
3/5/2010 Hall A ion chamber signal checkout back to EPICS, SAT.
3/8/2010 Hall A ion chambers pulled for testing and interface boxes modified. (For noise rejection.)
3/9/2010 Reinstalled the Hall A ion chambers. Ran cable for neutron probe in Hall A for special test.
3/11/2010 Verified power to RBM-6 and troubleshot RBM-6 comm. problem.
3/16/2010 Extended cable for special neutron test and moved Rad. Mon. to inside the Hall.
3/19/2010 Replaced ADM 616 in calibration range due to power up failure. Possible cause, B1000 probe cable.