Date |
Task |
3/5/2010 |
Hall A ion chamber signal
checkout back to EPICS, SAT. |
3/8/2010 |
Hall A ion chambers pulled for
testing and interface boxes modified. (For noise rejection.) |
3/9/2010 |
Reinstalled the Hall A ion
chambers. Ran cable for neutron probe in Hall A for special test. |
3/11/2010 |
Verified power to RBM-6 and
troubleshot RBM-6 comm. problem. |
3/16/2010 |
Extended cable for special
neutron test and moved Rad. Mon. to inside the Hall. |
3/19/2010 |
Replaced ADM 616 in calibration
range due to power up failure. Possible cause, B1000 probe cable. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|