Date |
Device |
Serial No. |
Location |
Comments |
3/2/2010 |
6112B |
101891 |
Block House |
Replaced Low and High Range
tubes. |
3/4/2010 |
IP-100 |
491310 |
Block House |
Probe HV wire repaired. High
Range HV adjusted. |
3/5/2010 |
Ludlum 3A |
156432 |
Block House |
|
3/5/2010 |
Ludlum 3A |
156422 |
Block House |
|
3/10/2010 |
IP-100 |
|
RM-47(Hall C Dome) |
Replaced Q2 and Cal'ed. |
3/11/2010 |
UR-100 |
100911001 |
RBM-6 |
|
3/12/2010 |
UR-100 |
100911002 |
RBM-3 |
|
3/15/2010 |
6150 AD |
89417 |
Block House |
Failed Receipt Calibration. Sent
back to GSA-Global. |
3/15/2010 |
BICRON |
E081A |
Block House |
|
3/15/2010 |
BICRON |
1812 |
Block House |
W/ protective screen
installed. |
3/19/2010 |
IP-100 |
491312 |
RM701(Bldg. 91) |
Replaced Q2 and Cal'ed. |
3/19/2010 |
IP-100 |
2052421 |
Block House |
EPROM bad adjusted High and Low
HV to calibrate. |
3/19/2010 |
AMS-4 |
|
Hall A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|