Injector Test Stand ``Commissioned"
Before Move
- RF Gradients Verified
- Operational RF Phases Determined
- Drifts Quantified
- Verified Gun Current/Gun operational procedure complete
- Beam jitters determined
- Unit Focussing/Convergence determined
- High Power CW Beam Delivery for awhile
- Cathode Lifetime Check
- Engwall/Kehne studies on gun transverse/longitudinal emittance complete
- PARMELA ``verified"
- After Move
- Transverse phase space at injection verified
- e-beam matched
- Longitudinal phase space verified
- Longitudinal tilt checked at injection
- Above determined at high power
legg@jlab.org