[4.3.2] IR FEL Test Plans in ACROBAT format


[4.3.2.1] Phase 1, Thread/setup Injector
Injector setup training slides
Drive Laser Extinction Ratio Test
Rough Thread and Injector Setup
Fine Injector Rf Setup
10 MeV Dump Setup
FEL Inj CW Setup
Using Maxvideo for beam profile tests
[4.3.2.2] Phase 2, Setup Cryomodule
Cryomodule Threading Procedure
Transient Phasing Procedure
Fine Cryomodule Phasing
Cavity Gradient Calibration
[4.3.2.3] Phase 3, Setup to 42 MeV dump, go CW and Lase
Thread/Setup to 42 MeV Dump
42 MeV Dump Setup
Matching into wiggler
Emittance in 2F, 2G lines
Emittance at wiggler
IR FEL Start Up
CW to 42 MeV Dump
Emittance Growth in the Decompressor
Emittance growth vs. longitudinal phase space tilt
[4.3.2.4] Phase 4, Energy recovery
Arc 1 Setup
CSR Tests
Emittance in backleg
[4.3.2.5] Overall Plan

Documentation under development.