During energy recovery the beam will be increased to 135 pC/ bunch at 9 MHz for setup to preserve the average current for MPS and SRF purposes, but this will allow a careful setup of the injector match and phasing with the charge per bunch to be used for the energy recovery experiment. This may be a strain on the diagnostics, but should allow a more rapid switch to high currents during the actual experiment.
1 - Fix accel/decel vectors on SRF at 12.5 degrees off crest. 2 - Upright distribution at wiggler. <1 psec RMS, 160 keV RMS 3 - Solutions at both 60 and 135 pC charge per bunch 4 - Target bunchlength, emittance, alpha and beta at entrance to the wiggler. This assumes that Byung is right and a simultaneous solution for 135 and 60 pC/bunch cannot be found.
.
Action Priority Items (assigned)
----------------------------------A-05 2 Injector energy precision Douglas A-06 1 10 MeV dump optics Douglas A-09 1 Dump Instrumentation Legg 6/04/96 A-10 2 Back leg diagnostic placement Douglas A-15 1 Commissioning Procedure Legg, Krafft 5/16/96 A-19 0 Web Documentation weekly A-20 1 10->42 MeV dump Douglas A-24 1,2 Beam loss Bohn A-29 1 Software Planning for Longer Term Bohn, et al. A-30 1 Burnthrough/Conflat Expansion Denard, Kloppel A-34 2 Consistent Linac phasing plan Yunn A-35 1 simultaneous transverse and longitudinal Kehne/Engwall 8/6/96 A-39 1 report on ARR plan Legg 8/23. A-41 2 Modeling of lower than 10 MeV injector kehne, Liu 10/1/96 A-42 2 2nd gun for long term tests Bohn 10/1/96 A-44 1,2 Start Rui on emittance code Bohn 8/13/96 A-45 1 decide on dump diagnostics Legg/Krafft 9/4 A-46 1 specify the field quality in the dipole shut off to run straight ahead Douglas 9/11 A-47 1 OTR beam interaction number by Denard 9/11 A-54 1 FEL Turn-On Proc S. Benson 11/1/96 A-55 1 Laser Diagnostic Proc Benson 11/1/96 Action Items (pending)
------------P-02 1 Laser phase modulator Jordan P-05 1 Devise fine-tuning procedure for buncher gradient Krafft/Kehne P-08 1,2 How do we change energy? What is the energy range? Benson P-14 1 How is the gun/laser operated? Benson P-15 Discussion on robustness of controls Legg P-18 1,2 Technote by Yunn summarizing machine impedance Yunn P-19 2 Consistent linac/bunching phase sets Yunn P-20 1 Lock plans (who in particular) Johannes? P-21 1 Save/restore plans Benesch P-25 1,2 RF control sensitivities/ Merminga Microphonics Diff for FEL/ Pathlength effect P-28 1,2 Scrapers: Where and How? Bohn, Li P-29 2 FEL/linac interaction Merminga P-30 2 Tracking including realistic wiggler fields Douglas P-35 1 Coordinated ITS beam running/SRF commissioning plan Legg/Bohn/Harwood P-37 1 42 MeV dump design and interlocking Wiseman Agenda for Next Meeting
-----------------------Item Person Responsible Time ---- ------------------ ---- * Review agenda/corrections to minutes Legg 5 min. * Control room layout and signals All 30 min * New Issues ALL 10 min * Agenda for next meeting All 5 min.