Free Electron Laser Commissioning/Diagnostic Meeting
Tuesday, July 22, 1997
Recorder: R. Legg
Next Meeting
- Date: July 29, 1997
- Time: 3:00 - 4:00
- Place: Bldg 89, Large Conference Room
Attendees
R. Legg, R. Evans, K Jordan, G. Neil,
J. Bennett,
P. Piot, S. Benson,
Q.S. Shu, R. Walker, L. Merminga
Addenda/Errata to Previous Minutes
Items of Discussion
-----------------
- Kevin gave a short update on the FEL AMS system. The
system will use eight 16x16 crosspoint switches from
Analog Devices to allow a 128 in to 16 lines out signal
selector. Kevin brought one of the boards from AD with him.
It was very nice, arriving pre-connectorized (BNC's) with
software to allow PC control. Kevin says the software
to EPICS will use the DLPC driver written for the ITS
last spring. All channels will have an RMS convertor on
them with a signal into EPICS. This will allow any of the 128
signals to be archived. The RMS convertors are housed in
32 channel crates using the backplane designed for the
2 nA BPMs.
The bandwidth of the system is limited to 1 MHz in the MCC
by the fiber optic link to the FEL building, but in the FEL
building the bandwidth will be greater than 5 MHz.
The drawback of the system is that it has no positive verification
of the channel selected, but there is a cal signal and
the hardware is commercial, so reliability should be better.
However, there will be extensive tests to avoid the problems
observed on the AMS in the main machine.
Cost looks to be within the $50K allocated with a test
article available within 3 weeks, maybe.
- The QJ centering issue was discussed. The problem is simply
that the QJ magnetic centers, while known very accurately
with respect to the probe used, are not known well with
respect to the mechanical centers since the probe is not
aligned with respect to the mechanical dimensions prior
to measurement. The variation of the mechanical center
to the magnetic one is thought to be as much as 1-2 mm RMS
from article to article. Since the magnets are aligned
according to the mechanical tooling, this variation is what
the electron beam will see. Yunn has been tasked with
determining what the sensitivity of the beam to this offset
will be. If it must be corrected, there are three options:
1) Fiducialize and align the test stand and re-measure the
magnets, 2) Install enough correctors to center in every
quad, or 3) Install as is and use the beam to determine
quad offsets and then re-align to fit. Option 1) was rejected
on schedule grounds, option 2) was rejected on cost. Presently,
we will investigate the sensitivity of the effect and look
at option 3).
- The first draft of a cryomodule fine phasing procedure was
passed out for review. Briefly, the algorithm determines
zero crossings for improved sensitivity and crest and anti-crest
to check for non-linearities and give some statistics.
Lia will continue reviewing the procedure and discuss a
gradient calibration procedure with M. Tiefenback.
These tasks are complicated by the phasing dipole limitation
of about 20 MeV maximum acceptance.
New Issues
----------
- Need an "FEL Test Plan Worksheet" template if we are to avoid
FEL experiments being setup on the main machine (like the
cryomodule phasing one above). Legg will talk to T. Oren about
fitting the document into the overall OP's scheme.
- Do we want to write a separate OSP for the new building or
rewrite the OSP for the site to include the FEL building?
What are the ramifications of either action? Who would
know what the ramifications are? Legg suggested the M7 would
be the right group to ask, since ulitimately they (or Andrew)
are responsible for the site. Because of the urgency, however,
we will ask T. Hassler and probably write a separate OSP
for the FEL building.
- G. Neil asked and got approval to limit the N2 flow in the
enclosure to 20 CFM to reduce the ODH hazard.
- Yunn needs to rerun his simulations for an "insensitive"
setup for the 60 pC and 135 pC cases now that he has a
solution to the long gun injector. Legg will send him a note.
Action Items
------------
- Legg send note to Yunn on "insensitive" setup.
- Legg to discuss with T. Oren new FEL template.
- Yunn will check QJ alignment sensitivity.
Action Priority Items (assigned)
------------------------------
A-15 1 Commissioning Procedure Legg, Krafft 7/16/97
A-19 0 Web Documentation weekly
A-34 2 Consistent Linac phasing plan Yunn
A-44 1,2 Start Rui, Jinhu? on emittance code Douglas 8/13/97
Action Items (pending)
------------
P-05 1 Devise fine-tuning procedure for buncher gradient Krafft/Kehne
P-08 1,2 How do we change energy? What is the energy range? Benson
P-20 1 Lock plans (who in particular) Johannes?
P-21 1 Save/restore plans Benesch
P-25 1,2 RF control sensitivities/ Merminga
Microphonics Diff for FEL/
Pathlength effect
P-29 2 FEL/linac interaction Merminga
Agenda for Next Meeting
-----------------------
Item Person Responsible Time
---- ------------------ ----
* Review agenda/corrections to minutes Legg 5 min.
* Magnet Integration Plan Douglas 30 min
* New issues All 10 min
* Agenda for next meeting All 5 min.