Next Meeting
Attendees
D. Douglas, J. Denard, C. Bohn, P. Piot S. Benson, G. Neil, K. Jordan, B. Yunn, and G. Krafft
Items of Discussion
New Issues
Happek Device: in the ITS meeting the status of the Happek measurement of bunch length was discussed. The contract is set to start on July 1 and we can expect the first system done 90 days thereafter. The contract aparently includes 5 quarters of graduate student labor, which should help us get up to speed; Jordan will check the conditions are OK. The integration issues, both mechanical, and with EPICS, must be worked out, but we will be obtaining complete, remotely controllable instruments. Also, it goes without saying that it will be beneficial to obtain as much help as possible from him.
Synchrotron Light Monitor plans: again no meeting occurred. A meeting with Denard, Piot, Jordan, Benson, Krafft, and Bohn should be scheduled.
Action Items
Action Items (assigned)
A-01 Update Drawing Bohn weekly A-02 Magnet Specifications Webbed Douglas A-03 Stray fields in test stand Legg complete A-04 Unit gradient precision Bohn, Liu A-05 Injector energy precision Douglas A-06 10 MeV dump optics Douglas A-07 Bypass optics Douglas A-08 M56/RF phasing and beam load issues Yunn, Neil, Douglas, Liu A-09 Dump Instrumentation Legg 6/04/96 A-10 Back leg diagnostic placement Douglas A-11 Multifrequency CSR Measurements Krafft 6/04/96 A-12 How should the path length be checked? Krafft, Jordan 6/11/96 A-13 Impedance Layout for Wiggler Yunn, Neil complete A-14 Reduce M56 to under 30 cm Douglas complete A-15 Commissioning Procedure Legg, Krafft 5/16/96 A-16 Average Current Measurement/Assess Far. Cup Legg A-17 4-Channel BPM on the IRFEL Bohn, Denard A-18 Trombones Douglas, Krafft A-19 Web Documentation Krafft weekly A-20 10->42 MeV dump Biallas A-21 Diagnostics reviews Jordan 6/11/96 A-22 Beam dump and scaper design Wiseman 6/18/96 A-23 Ganged powering schemes Douglas A-24 Beam loss Bohn A-25 Synchrotron Light Monitors Krafft A-26 IR Camera Plan Neil A-27 Autosteer Plan Bohn A-28 Cavity Coupling Yunn A-29 Software Planning for Longer Term Bohn A-30 Burnthrough/Conflat Expansion Denard, Kloppel A-31 S/N for SR to blackbody Piot A-32 10 MeV emittance Plan BohnAction Items (pending)
P-01 Determine Beam Pulse structure for setup P-02 Laser phase modulator P-03 Slit emittance measurement P-04 Is an energy compression scheme needed? P-05 Devise fine-tuning procedure for buncher gradient P-07 Diagnostics "Freeze" P-08 How do we change energy? What is the energy range? P-09 Do we need bunching after the module P-10 Will the SLM monitor work to center the large beam P-11 Calculate from Hall C data how much scatter the BPMs can take P-12 FEL/OTR interaction question P-13 Do we have sufficient diagnostics for emittance degradation measurements P-14 How is the gun/laser operated? P-15 Discussion on robustness of controls?????? P-16 Injector diagnostics in the main machine P-18 Technote by Yunn summarizing machine impedance P-19 Consistent linac/bunching phase sets P-20 Lock plans (who in particular) P-21 Save/restore plans P-22 FSD plans P-23 Transverse Effects in CSR P-24 FEL Commissioning review P-25 RF control sensitivities/Microphonics Diff for FEL/Pathlength effect P-26 What if studies P-27 Plan to measure beam loss P-28 Scrapers: Where and How? P-29 FEL/linac interaction P-30 Tracking including realistic wiggler fields P-31 What drives the vacuum spec. P-32 Are two sextupole families enough to tune M56 P-33 Is path length feedback needed? P-35 Coordinated ITS beam running/SRF commissioning plan P-36 Beam power robust BPMs P-37 42 MeV dump design and interlockingAgenda for Next Meeting
Item Person Responsible Time ---- ------------------ ---- * Review agenda/corrections to minutes Krafft 5 min. * New drawing Bohn 5 min. * Web documentation Krafft 10 min. * New issues * Autosteering Bohn 5 min. * IR Camera Plan Neil 15 min. * Transverse CSR Li 15 min. * Active item discussion All 10 min. * Agenda for next meeting All 5 min.