Injector Test Stand PolarizedSource
Start up &Trouble Shooting
Guide
| 1 | Log on to ITS01 and bring up the MEDM screen cavemenu.adl | |
| 2 | Turn Laser on to warm up. | |
| 3 | Verify shutter closed on EPICs control screen. | |
| 4 | Load Saved setting using menu button on lower right side of EPICs control screen. | |
| 5 | Cycle hysteresis to all lenes and the Dipole. | |
| 6 | Make Sure all Safety Interlocks engaged | |
| a | Water Flow to Beam Dump is ON | |
| b | High Voltage Shroud in Place and interlocks at both ends of High Voltage Cable in place. | |
| c | The Dipole Magnet in energized. | |
| d | Cave is Swept and door interlocks are engaged | |
| e | On EPICs control screen, HV button is off. | |
| 7 | Push Start button on Interlock Chassis (located in rack to the right of monitors) | |
| 8 | Turn the Glassman HV Supply on and verify current is set at 10mA and Voltage is dialed to Zero. | |
| 9 | With either Shutter closed or the Power Meter in, Press the EPICs HV On Button. | |
| 10 | Slowly dial the voltage up on the Glassman HV Supply. Using the volt meter in the rack to the left adjust voltage to 8 VDC. |