| DT # | Description | Date | Recipient |
| P1452 | CHL Upper/Lower CBOX | 05/09/2012 | Kelly Dixon |
| P1447 | Elevation checks rails in test lab 12gev additon | 04/23/2012 | J.Hogan, D. Fazenbaker, J. Fischer |
| P1221 | location of new gas line | 02/16/2009 | E. Winslow |
| P1131 | Survey monument tie to accelerator | 10/10/2007 | R. Yasky; K. Royston; E. Winslow |
| P1086 | Storage Shed Elevations | 11/16/2006 | D. Brand |
| P1078 | Drainage as founds - Bldg 86,87,89 | 10/05/2006 | S. Chandra |
| P1073 | Hall C road profile. | 08/22/2006 | S. Chandra |