Hall C Data Transmittals
----------------------

DT # Description Date Recipient
C581 G Zero Octan 3 results 03/10/2000 S. Lassiter
C583 G Zero Octan 2 results 03/15/2000 S. Lassiter
C584 G Zero Octan 4 results 03/16/2000 S. Lassiter
C585 G Zero Octan 1 results 03/20/2000 S. Lassiter
C704 GEN01 Target move 30 Jul 2001 10/01/2001 Donal Day, Marko Zeier
C705 GEN01 Target probe survey 25 Sep 2001 10/03/2001 Donal Day, Marko Zeier
C706 G0 octant shim packs(initial set). 10/09/2001 S. Lassiter
C707 GEN01 Target Can & target asfound survey 2001.10.10 10/10/2001 Donal Day, Marko Zeier
C710 G0 octant shim packs(2nd set). 10/15/2001 S. Lassiter
C713 Line C GEN01 chicane move (TUNE UP) 10/18/2001 Donal Day, Jay Benish,Marco Zeier, Chen Yan
C714 Line C GEN01 chicane/target move (3.481gev) 10/30/2001 Donal Day, Jay Benish,Marco Zeier, Chen Yan
C715 HMS vacuum pipe 11/02/2001 Rolf Ent
C728 Line C GEN01 chicane/target as found (3.481gev) 01/04/2002 Donal Day, Jay Benish,Marco Zeier, Chen Yan
C729 G zero support rail heights. 01/09/2002 Lassiter
C732 Line C chicane/target tune up position 01/18/2002 O. Rondon, M. Jones, (J. Benesch - email)
C733 Line C chicane/90 degree position 01/24/2002 O. Rondon, M. Jones
C739 Line C chicane/target tune up position 02/14/2002 O. Rondon, M. Jones, (J. Benesch - email)
C748 Hall C polarized target shell 03/13/2002 M. Sealy, D. Day, O. Rondon
C749 Line C chicane/target tune up position 03/14/2002 O. Rondon, M. Jones, (J. Benesch - email)
C763 Hall C G0 target calibration. 05/03/2002 Silviu Covrig
C771 Hall C Pivot Bolt Holes 05/15/2002 Bert Metzger
C774 G0 octant alignment relative to FW. 05/23/2002 Philip Roos
C786 Hall C target cool down. 06/11/2002 G. Smith, S. Covrig
C788 Hall C pivot elevation 06/19/2002 B. Metzger
C797 G0 Sealing surface and ring flatness inspection (dump) 07/26/2002 Steve Lassiter
C802 Line C components for G0 08/22/2002 J. Benesch, M. Spata, R. Ent, R. Carlini
C816 Hall C dump viewer 10/02/2002 J. Benesch, M. Spata, S. Suhring
C821 SOS rail survey. 10/22/2002 W. Kellner
C822 Line C diagnostic girders. 10/29/2002 Benesch, Spata, Yan, Yun
C826 HALL C G-ZERO components asfound 11/01/2002 Rolf Ent, Philip Roos
C846 Line C components for G0 03/12/2003 R. Ent, P. Ross, G. Smith
C851 Hall C target survey 04/04/2003 D. Meekins, G. Warren, R. Ent
C852 Diagnostic Girder Components 04/07/2003 M.Spata,R. Ent
C853 HMS & SOS Pointings -  Mar/Apr 2003. 04/08/2003 J. Reinhold, G. Warren, R. Ent
C877 HMS & SOS Pointings July  2003. 07/10/2003 R. Ent
C894 G0 target alignment and calibration 09/10/2003 S. Covrig, L. Hannelius
C896 Tuna Can target post run survey 09/11/2003 D. Meekins, G. Warren, R. Ent
C898 Pivot diagnostic girder survey 09/17/2003 M. Spata, R. Ent
C909 G0 beamline diagnostics survey 11/19/2003 R. Ent, J. Yun, G. Smith
C919 QWeak pre-collimator check measurements 03/09/2004 M. Fowler, P. Brindza
C929 G0 beamline diagnostics post run survey 05/24/2004 R. Ent, J. Yun, G. Smith
C934 Tuna can target survey 06/17/2004 D. Meekins, R. Ent
C935 Pivot diagnostic girder and BPM survey 06/18/2004 R. Ent, M. Spata, A. Freyberger
C953 Tuna can target survey 09/20/2004 D. Meekins, R. Ent
C955 Dump viewer and Pavelometer survey 09/20/2004 E. Abkemeier, J. Benesch, M. Spata, S. Suhring
C965 SOS drift chamber and Cerenkov alignment 11/22/2004 R. Ent, P. Bosted, M. Fowler, P. Medeiros
C973 Enge slit collimator calibration 01/21/2005 L. Tang, M. Sumihama
C976 Tuna can target post run survey 01/31/2005 D. Meekins, R. Ent
C977 Pivot diagnostic girder post run survey 02/01/2005 R. Ent, M. Spata, A. Freyberger
C985 Moeller Polarimeter survey 04/07/2005 C. Yan
C986 Spool piece dictances around pivot 04/12/2005 C. Hutton
C992 Dump viewer survey 04/25/2005 E. Abkemeier, A. Freyberger, N. Okay
C995 HKS beamline diagnostics component survey 06/01/2005 R. Ent, M. Spata, A. Freyberger
C996 HKS spectrometer surveys 06/06/2005 R. Ent, L. Tang
C997 HKS viewer locations 06/07/2005 A. Bogacz, N. Okay, R. Ent, A. Freyberger
C1009 Fission chamber offset 09/19/2005 W. Oren
C1010 Fission chamber survey 09/27/2005 M. Spata, N. Okay, L. Tang
C1012 Survey of Hall C cryo cans 10/06/2005 A. Guerra, R. Wolfley
C1015 G0 Ferris Wheel support arm inspection 10/17/2005 B. Metzger
C1017 G0 Mini Ferris Wheel octant inspection 10/27/2005 L. Lee
C1018 G0 Mini Ferris Wheel shim survey 11/01/2005 B. Metzger
C1025 G0 back angle FW octant locations 12/01/2005 L. Lee, D. Gaskell
C1046 Line C component survey (d/strm of shield wall) 03/08/2006 D. Gaskell, N. Okay, J. Benesch, Y. Wang
C1048 Line C component survey (d/strm of hall center) 03/13/2006 D. Gaskell, N. Okay, J. Benesch, Y. Wang
C1049 G0 backangle SMS, Ferris Wheel and Target survey 03/15/2006 G. Smith, D. Gaskell, J. Benesch, Y. Wang
C1057 G0 diagnostics and halo girder surveys 05/08/2006 D. Gaskell, N. Okay, J. Benesch, Y. Wang
C1059 Cryo platform plate elevations 05/22/2006 N. Wilson
C1069 G0 diagnostics components survey 07/21/2006 D. Gaskell, N. Okay, J. Benesch, Y. Wang, J. Grames
C1075 HMS hut rail profile 09/11/2006 B. Metzger
C1076 Hall C pivot diagnostics girder survey 09/14/2006 D. Gaskell, N. Okay, J. Benesch, Y. Wang, J. Grames
C1085 Line C moeller polarimeter surveys 11/13/2006 D. Gaskell, R. Ent
C1104 BigCal fiducialization 03/16/2007 C. Perdrisat
C1106 G0 post run survey. 04/20/2007 D. Gaskel
C1109 Locations of stands / flanges for bpm box replacement 04/27/2007 B. Miller, M. Wiseman
C1110 Target/beam line survey. 05/08/2007 J. Benesch, N. Okay, D. Meekins, P. Solvignon
C1111 HMS Pointings May 2007. 05/14/2007 P. Solvignon, S. Wood
C1114 GEp-III focal plane polarimeter. 06/01/2007 F. Wesselmann
C1120 Target survey. 07/26/2007 J. Benesch, N. Okay, D. Meekins, P. Solvignon
C1127 Actual Laid out points for GEP experiment 08/31/2007 C. Perdrisat
C1129 Moller Magnets in 3C line 09/24/2007 D. Gaskel, S. Wood, J. Benesch, Noel Okay
C1130 HMS hut GEP detectors. 10/08/2007 F. Wesselmann, C. Perdrisat
C1134 Line C diagnostics/target survey. 10/30/2007 S. Wood, M. Jones, D. Meekins, N. Okay
C1139 HMS Pointings Oct 2007. 11/06/2007 M. Jones, S. Wood
C1142R Big Cal detector 1st position. 11/15/2007 M. Jones, S. Wood
C1146 Big Cal detector 2nd position. 11/26/2007 M. Jones, S. Wood
C1148 Big Cal detector 3rd position. 12/03/2007 M. Jones, S. Wood, C. Perdrisat
C1152 Big Cal detector -32.2 Deg. position. 01/07/2008 M. Jones, S. Wood, C. Perdrisat
C1153 Big Cal detector -30.8 deg, -105.1 deg. positions. 01/15/2008 M. Jones, S. Wood, C. Perdrisat
C1159 IHA3C07a-b Harp fiducialization/2b. 03/07/2008 A. Freyberger, S. Wood
C1161 Sane cerenkov 2b 03/25/2008 M. Jones, E. Kaczanowicz, S. Wood
C1160 Target survey. 03/24/2008 D. Meekins, N. Okay, S. Wood, M. Jones
C1167 Big Cal detector -69 Deg. position. 05/09/2008 M. Jones, S. Wood, C. Perdrisat
C1167 Big Cal detector -69 Deg. position. 05/09/2008 M. Jones, S. Wood, C. Perdrisat
C1169 Big Cal detector -44 Deg. position. 06/20/2008 M. Jones, S. Wood, C. Perdrisat
C1171 Hall C target post run survey. 07/01/2008 D. Meekins, N. Okay, S. Wood, M. Jones