HALL D Data Transmittals
----------------------

DT # Description Date Recipient
D1501 BCAL rail plates. 03/27/2013 T. Whitlatch, T Carstens
D1499 HD solenoid threaded hole locations. 03/21/2013 F. Martin
D1498 Tagger vacuum chamber inspection. 03/20/2013 B. Crahen, T. Carstens
D1494 Hall D Elevation Monitoring 02/08/2013 T. Carstens, T. Whitlach
D1487 FCAL frame 12/20/2012 Tim Whitlatch
D1474 Location of Hall D Cryo Building and Piers 08/06/2012 A. Hageman, F. Martin
D1473 Location of Hall D Cryo Building Corners 07/25/2012 A. Hageman, F. Martin
D1469 BCAL rail survey 07/11/2012 D Rath, T Whitlatch
D1432 Elevation Survey of Hall D Dump Berm 02/07/2012 R. Yasky, K. Welch, C. Bitgood, T. Witherspoon
D1431 Location of FDC Rails 01/24/2012 T. Whitlatch, T. Carstens
D1430 Location of Pair Spectrometer Rails 01/19/2012 T. Whitlatch, T. Carstens
D1427 Glue-x Upst Plenum disc. 01/06/2012 T. Whitlatch, S. Razmyslovich
D1424 Elevation Survey of Upper Platform Rails 12/20/2011 T. Whitlatch, T. Carstens
D1419 Elevation Survey of Hall D Berms 11/15/2011 R. Yasky, K. Welch, C. Bitgood, T. Witherspoon
D1415 Chimeneys on the Hall D Solenoid cryostats 11/01/2011 Tim Whitlatch
D1404 Check on Tunnel Extension walls 08/05/2011 R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch
D1399 Check on Tunnel Extension floor 07/13/2011 R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch
D1398 Check on Hall D photon beampipe between the Tagger & Hall D 06/17/2011 R.Yasky, C. Bitgood, T.Witherspoon, T. Whitlatch
D1395 Check on Hall D photon beampipe outside the Tagger hall 05/09/2011 R.Yasky, C. Bitgood, T.Witherspoon, T. Whitlatch
D1394 Check on Hall D photon beampipe in collimator cave 04/21/2011 R.Yasky, C. Bitgood, T.Witherspoon, T. Whitlatch
D1392 Check on Hall D photon beampipe 04/18/2011 R.Yasky, C. Bitgood, T.Witherspoon, T. Whitlatch
D1387 Check on Hall D collimator area beampipe and walls 04/05/2011 T. Whitlatch, S. Razmyslovich
D1383 Third check on Tagger photon beampipe (after concrete) 03/17/2011 R.Yasky, C. Bitgood, T.Witherspoon
D1382 Second Check on Tagger photon beampipe 03/04/2011 R.Yasky, C. Bitgood, T.Witherspoon
D1381 Check on Hall D photon beampipe 02/22/2011 R.Yasky, C. Bitgood, T.Witherspoon
D1380 Check on Tagger photon beampipe 02/17/2011 R.Yasky, C. Bitgood, T.Witherspoon
D1348 Check on Hall D rail trenches. 11/16/2010 R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch
D1347 Check on Hall D collimator area walls and floor 11/16/2010 R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch
D1337 Final solenoid pier survey after concrete. 10/29/2010 R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch
D1314 Fourth check on solenoid pier plates 08/26/2010 R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch
D1312 Check on Tunnel Extension / Tagger walls 08/23/2010 C. Bitgood, T. Witherspoon, T. Whitlatch, R. Yasky
D1311 Check on Tunnel Extension / Tagger floor elevation 08/23/2010 C. Bitgood, T. Witherspoon, T. Whitlatch, R. Yasky
D1310 Third check on solenoid pier plates 08/17/2010 R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch
D1304 Second check on solenoid pier plates 07/15/2010 R.Yasky, T.Witherspoon, T.Whitlatch
D1297 Check on solenoid pier plates 07/06/2010 R.Yasky, T.Witherspoon, T.Whitlatch
D1294 Check on cyropipe penetrations 06/29/2010 R.Yasky, T.Witherspoon, T.Whitlatch
D1285 Check on Tunnel Extension mud slab elevation 05/14/2010 C. Bitgood, T. Witherspoon, T. Whitlatch, R. Yasky
D1281 Check on photon beampipe. 04/30/2010 R.Yasky, T.Frye, T.Witherspoon, T.Whitlatch
D1271 GlueX end plate inspections. 03/17/2010 T. Whitlatch, S. Razmyslovich
D1267 Check on photon control on Hall D site 03/09/2010 R.Yasky, T.Frye, T.Witherspoon, T.Whitlatch
D1253 Check on Hall D slab elevation 12/09/2009 R.Yasky, T.Frye, T.Witherspoon
D1246 Hall D solenoid coil inspections. 10/21/2009 T. Carstens, F. Martin
D1245 Check on slab elevation and control on Hall D site 10/13/2009 R.Yasky, T.Frye, T.Witherspoon, S.Chandra, T.Whitlatch
D1204 Hall D GlueX detector profiler. 12/08/2008 W. Crahen, B. Kross, M. Stevens
D1177 Sag check on Pb barrel colorimeter 07/31/2008 Tim Whitlatch
D1096 Gluex detector prototype flatness. 02/13/2007 D. Carman, S. Taylor, B. Kross
D1008 Scintillator Load Test. 09/01/2005 P. Brindza