| DT # | Description | Date | Recipient |
| M1449 | SRF cavity alignment fixture | 04/25/2012 | J. Fischer |
| M1272 | Elevation survey of CHL K100 building | 03/19/2010 | K. Dixon |
| M1215 | AES Injector cryo. Fid/Insp/Flng align. | 01/26/2009 | J. Fisher, J. Hogan |
| M1194 | CHL Compressor/motor pad survey. | 11/03/2008 | M. Stapleton, M. Wright |
| M1166 | Radcon Well Elevations | 04/01/2008 | Keith Welch |
| M1138 | Multipole magnetic measurement bench. | 11/05/2007 | K. Baggett |
| M1116 | Inspect BNAL He vessel. | 07/03/2007 | K. Macha |
| M1066 | CHL 2K coldbox flange survey | 06/22/2006 | K. Dixon, D. Arenius |
| M1052 | Radcon source alignment | 03/31/2006 | D. Hamlette |
| M1011 | Cryomodule Assembly Bay Inspection | 10/03/2005 | J. Preble |