| DT # | Description | Date | Recipient | |
| Z931 | SNS HB vacuum vessel 04 inspection | 05/27/2004 | T. Whitlach, B. Carpenter | |
| Z927 | SNS HB space frame 12 inspection | 05/06/2004 | T. Whitlach, B. Carpenter | |
| Z920 | SNS HB vacuum vessel 07 inspection | 03/18/2004 | T. Whitlach, B. Carpenter | |
| Z915 | SNS HB space frame 07 inspection | 01/13/2004 | T. Whitlach, B. Carpenter | |
| Z912 | SNS MB07 arm survey | 12/15/2003 | J. Preble, J. Hogan, J. Fischer, T. Whitlach | |
| Z902 | SNS offset fixture inspection | 10/10/2003 | J. Preble, B. Carpenter | |
| Z901 | Cryomodule Assembly room pier distances | 10/02/2003 | J. Preble, J. Hogan | |
| Z899 | SNS MB06 arm survey | 09/30/2003 | J. Hogan, T. Whitlach, M. Wiseman | |
| Z891 | SNS MB04/05 arm survey | 09/03/2003 | J. Hogan, T. Whitlach, M. Wiseman | |
| Z883 | SNS mb space frame 08 | 08/04/2003 | Tim Whitlatch and Brian Carpenter | |
| Z875 | SNS HB SpaceFrame 02 | 07/02/2003 | Tim Whitlatch, Brian Carpenter | |
| Z872 | SNS cryomodule return end cap 10 | 06/16/2003 | Ed Daly,Brian Carpenter | |
| Z871 | Supply end cap 05 after re-manufactured | 06/16/2003 | Ed Daly,Brian Carpenter | |
| Z869 | SNS cryomodule return end cap 05 re-inspection | 06/16/2003 | Ed Daly,Brian Carpenter | |
| Z867 | SNS Hi Beta Module 1 Flange movement | 06/03/2003 | Joe Preble, Frank Humphrey | |
| Z862 | Inspection of SNS Vacuum Vessel 09 | 05/07/2003 | Tim Whitlatch and Brian Carpenter | |
| Z861 | (Revision)Inspection High Beta space frame 01 SNS | 05/01/2003 | Tim Whitlatch and Brian Carpenter | |
| Z855 | Inspection of SNS Vacuum Vessel hi beta 01 | 04/10/2003 | Tim Whitlatch and Brian Carpenter | |
| Z836 | Inspection of SNS Vacuum Vessel 06 | 01/09/2003 | Tim Whitlatch and Brian Carpenter | |
| Z835 | Inspection of SNS Vacuum Vessel 06 | 01/09/2003 | Tim Whitlatch and Brian Carpenter | |
| Z834 | SNS cryomodule return end cap 10 | 01/08/2003 | Ed Daly,Brian Carpenter | |
| Z830 | SNS cryomodule return end cap 06 after re-manifactured | 11/26/2002 | Ed Daly,Brian Carpenter | |
| Z829 | Supply end cap 05 after re-manufactured | 11/26/2002 | Ed Daly,Brian Carpenter | |
| Z827 | SNS cryomodule supply end cap 07 after re-manufactured | 11/01/2002 | Ed Daly,Brian Carpenter | |
| Z825 | Inspection of SNS Space frame 05 | 10/31/2002 | Tim Whitlatch and Brian Carpenter | |
| Z821 | Inspection of SNS Vacuum Vessel 04 | 10/21/2002 | Tim Whitlatch and Brian Carpenter | |
| Z819 | SNS Spaceframe 2 re-inspection | 10/03/2002 | Tim Whitlatch and Brian Carpenter | |
| Z814 | Inspection of SNS Vacuum Vessel 03 | 09/23/2002 | Tim Whitlatch and Brian Carpenter | |
| Z813 | Inspection of SNS Space frame 04 | 09/20/2002 | Tim Whitlatch and Brian Carpenter | |
| Z809 | SNS Bridging rings 8, 13, 15, and 19 | 09/12/2002 | E. Daly, B. Carpenter | |
| Z808 | Inspection of SNS supply and return end cans 8 and 9. | 09/11/2002 | E. Daly, B. Carpenter | |
| Z806 | Inspection of SNS Space frame 03 | 08/29/2002 | Tim Whitlatch and Brian Carpenter | |
| Z803 | Inspection of SNS supply and return end cans 2-7 with bayonets controlling roll | 08/26/2002 | E.Daly, J.Preble, B. Carpenter | |
| Z796 | SNS cryomodule supply end cap 04 | 07/23/2002 | Ed Daly,Brian Carpenter | |
| Z795 | SNS cryomodule return end cap 05 | 07/23/2002 | Ed Daly,Brian Carpenter | |
| Z793 | Inspection of SNS Space frame 02 | 07/16/2002 | Tim Whitlatch and Brian Carpenter | |
| Z792 | 12 GeV lollipop inspection | 07/15/2002 | K. Macha, J. Fischer | |
| Z785 | SNS cryomodule return end cap #3. | 06/07/2002 | Ed Daly,Brian Carpenter | |
| Z784 | SNS cryomodule supply end cap #3. | 06/07/2002 | Ed Daly,Brian Carpenter | |
| Z778 | SNS cryomodule supply end cap 02 QC | 05/30/2002 | E. Daly, B. Carpenter | |
| Z777 | SNS cryomodule return end cap 02 QC | 05/30/2002 | E. Daly, B. Carpenter | |
| Z767 | Inspection of SNS Vacuum Vessel 02 | 05/09/2002 | Tim Whitlatch and Brian Carpenter | |
| Z755 | 12Gev Space Frame 2 re-inspection | 04/09/2002 | Tim Whitlatch, Brian Carpenter | |
| Z747 | SNS cryomodule return end can 01 QC | 03/13/2002 | E. Daly, B. Carpenter | |
| Z744 | SNS 0.61 Beta space frame inspection | 02/28/2002 | Whitlach, Daly | |
| Z743 | SNS cryomodule supply end cap 01 QC | 02/22/2002 | T. Whitlach, B. Carpenter | |
| Z742 | SNS 0.61 Beta space frame inspection | 02/22/2002 | Whitlach, Carpenter | |
| Z741 | Inspection of SNS Vacuum Vessel 01 rail location at wheel placement | 02/22/2002 | Tim Whitlatch and Brian Carpenter | |
| Z738 | 12 Gev cryomodule retun end cap 1&2 QC | 02/06/2002 | T. Whitlach, B. Carpenter | |
| Z737 | Inspection of SNS Vacuum Vessel 01 | 02/04/2002 | Tim Whitlatch and Brian Carpenter | |
| Z735 | 12 Gev cryomodule supply end cap 1&2 QC | 01/29/2002 | T. Whitlach, B. Carpenter | |
| Z731 | SNS cavity transport rail inspection. | 01/14/2002 | Brian Carpenter, Tim Whitlach | |
| Z724 | SNS 0.61 Beta space frame inspection | 12/18/2001 | Whitlach, Carpenter | |
| Z723 | 12 Gev Space Frame re-inspection | 12/18/2001 | Whitlach, Carpenter | |
| Z717 | 12Gev Cryo. spaceframe | 11/06/2001 | Brian Carpenter, Tim Whitlatch | |
| Z716 | SNS Cryo. vacuum vessel | 11/06/2001 | Brian Carpenter, Tim Whitlatch | |