Privacy and Security Notice

Archived Messages for CLAS_TOF_1997@cebaf.gov: TOF Task List

TOF Task List

Elton Smith (elton@CEBAF.GOV)
Thu, 09 Oct 1997 13:57:13 -0400

--71d2_46b7-219c_3eab-3969_3eb4
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit
Content-MD5: czWqHhaAFv1rkQ3Ci3M+Gw==
X-Sun-Data-Type: text

Hello,
I have compiled a (partial) list of tasks for the TOF system
which are to be completed while the beam is down. Please send me
corrections/comments. See attachment.

Elton.
--71d2_46b7-219c_3eab-3969_3eb4
Content-Type: application/octet-stream
Content-Transfer-Encoding: 7bit
Content-MD5: 4mbPSMS+eGhYXYKN987pMw==
Content-Description: tof_tasks_oct97.net

TOF Tasks for October when beam off 10/9/97

Task Responsibility When

Surveys and positions Kelly Tremblay Oct 9-10
Inclusion of surveys in RECSIS ?
TDC calibrations Simon / Maurik Oct 9-10
Cosmic Ray Runs (Pair HV=0) Costy
laser runs
time-walk corrections Simon / Costy Oct 9-13
ADC gate Costy
Backing Structure / Sector 5 48b Tom Oct 9-30
Problem Channels Costy / Tom Oct 18-30
ADC Cable order Elton Oct 9-17
TDC capacitor Chris Oct 9-30
Scalers Simon / Elton Oct 9-30
Equalization of Scint Pairs Tom Oct 9-30
Install Sect 1,2,3,4 Panel 4 Tom / Doug Nov 1-15
Tracking
Time Resolution Determinations
Time Matching with particles
electrons
charged pions
neutral pions

Original List 9/22/97
Updated 10/9/97

Sector Scint ADC TDC Name Date Comment

1 16R bad bad Carstens 9/23/97 CRATT Bad at first jumper

3 7R bad bad 10/9/97 New /
3 18R ok bad Carstens 9/23/97 ? Signal at splitter
3 25L bad bad Carstens 9/23/97 CRATT Bad at first jumper
3 30R ok bad Carstens 9/23/97 ? Signal at splitter

4 8L ok bad Carstens 9/23/97 ? Signal at splitter

5 9R bad bad Carstens 9/23/97 CRATT Bad at first jumper
5 24L bad bad Carstens 9/23/97 CRATT No output from tube
5 24R bad bad Carstens 9/23/97 CRATT No output from tube
5 36R bad ok Carstens 9/23/97 ? Signal at splitter
5 48L ok bad 10/9/97 New /

6 1R bad bad Carstens 9/23/97 CRATT Bad at first jumper
6 30R bad ok Carstens 9/23/97 ? Signal at splitter
6 45L ok low 10/9/97 New / light leak or weak

CRATT: Cannot Repair At This Time.

Problem: ADC and TDC ADC or TDC

Status before fixes: 7 7 10/9/97
Status after fixes:

--71d2_46b7-219c_3eab-3969_3eb4--