Minutes of e-d elastic expt. (91-26) 7/11/97 meeting (taken by Riad):
------------------------------------------------------------------------
- Makis reviewed the run plan:
Planned kinematics almost finalized.
- Makis showed simulation of spectrometer acceptances:
y_target acceptance, momentum acceptance.
- Discussion of critical issues and assignment of tasks:
1. Rastering/Beam monitoring [Dave, Glen]
2. Charge monitoring: [Arun]
a- Current integration online
b- VF calibration
3. Cryogenic target:
a- Installation and readiness [target group]
b- Put important target parameters into data stream [Kathy]
4. Spectrometers:
a- Transport/Turtle model [John L., Makis]
b- Extra sieve slit calibration data [Makis]
c- Tosca prediction for dipole matrix elements variation [John]
d- Apertures [John L., Makis]
e- Magnet positions of hadron spectrometer [John L.]
f- Reverse matrix elements from model [Makis]
g- Collimator/sieve slit/open position availability [Javier]
5. Detectors:
a- Cherenkov status [Riad]
b- Shower status [Glen]
c- Scintillators/VDC [Dave]
d- Detectors' position/apertures [Riad]
e- Documentation [Riad, Makis]
6. DAQ:
a- Electronics and trigger delays [John C., Glen, Riad]
b- Trigger sorting [Paul, Dave]
c- End run summary sheet print out [Kathy]
d- Online analysis additions [Dave]
c- History plots [Kathy, Lars]
d- Documentation [Glen]
7. Preparation:
a- Shift personpower [Makis]
b- Runplan [Makis, Riad]
c- Radiation budget [Makis, Riad]
d- Conduct of operation [Javier, Makis]
8. Off-line analysis ESPACE [Glen, Kathy, Riad]
9. Monte Carlo [Mina]