Minutes of e-d elastic expt. (91-26) 7/25/97 meeting
Riad Suleiman (suleiman@CEBAF.GOV)
Thu, 14 Aug 1997 15:31:17 -0400
Minutes of e-d elastic expt. (91-26) 7/25/97 meeting
-------------------------------------------------------
- Riad reviewed the run plan:
1. Discussion of A(Q^2): existing and expected data
2. Discussion of B(Q^2): existing and expected data
3. e-d kinematics
4. Expected coincidence rates
Rates vary from 100 Hz to 0.00006 Hz
5. Will run with different combinations of target lengths
and collimator settings
5. e-p calibration kinematics
e-p calibration with kinematics to produce same Jacobian
as in e-d kinematics.
- Kathy is working on putting EPICS variables in the data stream.
- Discussion of any problems involving prescaling events.
- discusssion of online analysis.
- Bob and Dave have been working on raster; alot of progress
but still a lot to do.