Minutes of POD Meeting



On the question of converting applications to use the new e2sr:
  * Applications will be upgraded as they are changed (or sooner if the
application developer wants to).
  * The mkNewapp script will be modified to use the new e2sr by Sally
  * Brian will make a web page with the modification instructions.

On the question of upgrading to the latest non-Beta version of EPICS:
  * The System team and the Low Level Apps team will converge on using
the same version of EPICS (from the same place) rather than maintaining
a System version of EPICS (currently 3.13.1) and a separate version for
Low Level Apps (currently, 3.13Beta12)
  * Brian and Dave will work on getting over the latest version and
integrating any local changes needed by both teams.
  * Sally will work on integrating the PowerPC changes made by Alicia
(if they are needed). Alicia will advise her.
  * We will defer planning on upgrading iocs until the new EPICS version
is ready.

On the question of using a single version of EPICS to support both the
PowerPC and the 68000 boards:
  * Matt said that he would not be able to get an integrated product out
of Wind River until VxWorks 4.0 was available.
  * In the meantime, Sally (with Alicia's help) will modify the EPICS
config files to add a "whichVxWorks" feature to automate using the
correct set of cross-compilers.
 
-- 
==============================================================================
Sally Schaffner, Computer Scientist, TJNAF
e-mail: sally@jlab.org
==============================================================================