Weekly Minutes 11/04/2005


[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Weekly Minutes 11/04/2005



Attendance: L. Benton, M. Ito, D. McNulty, A. Teymurazyan, By phone: A.
Bernstein, D. Dale, L. Gan, A. Gasparian

Secretary: L. Benton
Next: M. Ito

1) Dustin reported that Volker liked the slides that were sent to him and is
   pleased with the status of PrimEx thus far.  Volker displayed all slides
   that were submitted to him at the CLASS Colaboration meeting.

2) Last week's minutes we approved after a short review and discussion of V.
   Mochalov's talk from previous meeting. We reviewed the last 3 topics in
   Vasily's talk and agreed that his work needs to be continued by someone
   else in the colaboration. The following are major items that needs to be
   considered and who may potentially do them;

   -  Vasily's new calibration constants need to be put in the DB (Dustin)
   -  Give Mike the code he needs to carry out his data quality check that
      Vasily didn't get a chance to give to him. (Dustin)
   -  The rest of Vasily's responsibilities and duties needs to be
      dispearsed among the rest of the group.

3) There is a strong possibility of Ilya Laurin returning to the group, but
   there is no present date of excatly when.

4) We discussed the date of the next colaboration meeting and it was set to
   be on November 18th and 19th.  Dustin suggested that all presentations
   should be in some type of electronic format such they can be easily filed
   on the PrimEx webpage and for record keeping.  This was accepted by
   participants and all are encouraged to concure.

4) L. Benton gave his presentation on the status of LMS Data Correction and
   the Radiation Accident in PrimEx.  Slides showed a lot of progress and
   showed that the LMS data was being corrected using his averaging
   algorithm.  Presentation was accepted by group and I need to colaborate
   with Dustin to go further and correct all LMS data in DB.  This will be
   done within the next couple of weeks.

5) Kelli's Compton study deffered to next week.

6) New Business:  M. Ito talked about that point that Volker has a run
   schedule for the 2007 run year, and PrimEx is not on it.  The
   colaboration needs to decide if we need to submit a proposal to him?  Are
  %