|
|
TITLE: |
||
|
|
|||
|
DOCUMENT ID: |
3120 Appendix H Checklists for Experiment Preparation |
||
|
|
|||
Please
use the following checklists for each experiment, as appropriate:
Hazard
Identification Checklist
|
(Check all
items for which there is anticipated need) Address
anything requiring unusual handling or disposition in items 1 and 2 at the
end of the table. |
||
|
Cryogenics analysis magnets target flow rate: capacity: |
Electrical
Equipment cryo/electrical
devices capacitor banks high voltage exposed equipment If applicable, special Waste
Disposition: |
Radioactive/Hazardous
Materials List any radioactive or
hazardous/toxic materials planned for use: If applicable, special Waste
Disposition: |
|
Pressure
Vessels inside diameter operating pressure window material window thickness |
Flammable Gas
or Liquids: Target type: flow rate: capacity: Drift Chambers type: flow rate: capacity: |
Solid Target
Materials Beryllium (Be) Lithium (Li) Mercury (Hg) Lead (Pb) Tungsten (W) Uranium (U) other (list below) If applicable, special Waste
Disposition: Special Concerns - Usage: |
|
Vacuum Vessels inside diameter operating pressure window material window thickness |
Radioactive
Sources Use: permanent installation temporary use type: strength: |
Large
Mechanical Structure/ System lifting devices/carriages motion controllers scaffolding or elevated platforms |
|
Lasers type: wattage: class: Installation: permanent temporary Use: calibration alignment |
Hazardous
Chemicals cyanide plating materials scintillation oil PCBs methane TMAE TEA photographic developers other (list below) If applicable, special Waste
Disposition: Special Concerns - Usage: |
General: Experiment
Class: Base Equipment Temp. Mod. to Base Equipment Permanent Mod. to
Base Equipment Major New Apparatus Other: |
Hazard Identification Checklist
Experiment #
|
1. Are
there any actions that could involve environmental permit issues such as
requiring advance authorizations? |
|
|
2. Briefly
describe unusual actions/activities (such as from unique materials or waste
products) that could present hazards to personnel or the environment. (Specific descriptions and practices to be
implemented shall be documented in the experimental COO.) |
|
|
|
|
Experiment #
List all combinations of anticipated targets and
beam conditions required to execute the experiment. (This list will form the primary basis for
the RSAD calculations that must be performed for each experiment).
|
Condition# |
Beam Energy (GeV) |
Beam Current (μA) |
Polarization
and other special requirements |
Target
Material (use multiple rows for complex targets - e.g. w/ windows) |
Target
Material Thickness (mg/cm2) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Experiment
Installation Checklist
Experiment #
(To be developed by E2RC, with
possible additions from other reviews, and to be completed by Physics Division
EH&S Staff together with the assigned Physics Division Liaison prior to
issuance of the Experiment Readiness Clearance.)
|
Item# |
Description |
Review that
requested installation check |
Installation
Check |
|
|
Date |
Signature |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Experiment #
(To be
reviewed by the Division Safety Officer and then included with the documents
submitted to the AD for Physics prior to issuance or Experiment Readiness
Clearance.)
|
Item # |
(I)ssue or (C)oncern |
Description |
Review that
raised issue or concern |
Resolution |
|
|
Date |
Signature |
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Reviewed by Physics Division Safety Officer:
Signature Date
Experiment
Readiness Clearance Checklist
Experiment #
|
Document |
Review(s)* |
Certification |
Signature |
Date |
|
Proposal w/ EH&S Hazard
Identification Checklist |
TAC & PAC |
Jefferson Lab Director |
|
|