|
|
TITLE: |
||
|
|
|||
|
DOCUMENT ID: |
Operational
Safety Procedure Form |
||
|
|
|||
|
|
|
|
|
||||||||||||||||||||||||||||||||
|
|
Serial Number: |
|
|
||||||||||||||||||||||||||||||||
|
|
|
(Assigned by ESH&Q
Document Control x7277) |
|
||||||||||||||||||||||||||||||||
|
|
|
|
|
||||||||||||||||||||||||||||||||
|
|
|
|
|||||||||||||||||||||||||||||||||
|
|
|
OSP |
|
TOSP |
|
|
|||||||||||||||||||||||||||||
|
|
*Attach the Task Hazard
Analysis (THA) related to this procedure |
||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||
|
|
Issue Date: |
Expiration Date: |
|
|
|||||||||||||||||||||||||||||||
|
|
(No more than three years from Issue Date except TOSP
which is three months from issue date) |
|
|||||||||||||||||||||||||||||||||
|
|
Title: |
|
|
||||||||||||||||||||||||||||||||
|
|
Location: |
|
|||||||||||||||||||||||||||||||||
|
|
Risk classification (See ESH&Q Manual Chapter 3210 Appendix T3 Risk Code Assignment.) |
Without mitigation
measures (3 or 4): |
|
||||||||||||||||||||||||||||||||
|
|
With mitigation measures
in place (0, 1, or 2): |
|
|||||||||||||||||||||||||||||||||
|
|
Document Owner(s): |
Date: |
|
||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||
|
Supplemental
Technical Validations: |
|||||||||||||||||||||||||||||||||||
|
|
Hazard
Reviewed (per ES&H Manual 2410-T1): |
Subject Matter Experts Signature: |
Date: |
|
|||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|||||||||||||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||||||||||||||
|
Approval Signatures: |
Print Signature |
Date: |
|||||||||||||||||||||||||||||||||
|
|
Division Safety Officer: |
|
|
|
|||||||||||||||||||||||||||||||
|
|
Department or Group Head: |
|
|
|
|||||||||||||||||||||||||||||||
|
|
Safety Warden of Area: |
|
|
|
|||||||||||||||||||||||||||||||
|
|
Other Approval(s): |
|
|
|
|||||||||||||||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||||||||||||||
|
Document
History: |
|||||||||||||||||||||||||||||||||||
|
|
Revision: |
Reason for
revision or update: |
Serial number of
superseded document |
|
|||||||||||||||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||||||||||||||
Distribution: Copies to: affected area, authors, Division Safety Officer, ESH&Q Document Control
After
expiration:
Forward original and log sheet of trained personnel to ESH&Q Document
Control.
|
|
|||
|
|
1. Purpose of
the Procedure |
|
|
|
|
|||
|
2. Scope – include operations, people, and/or areas where procedure
applies |
|||
|
|
|||
|
3. Description
of the Facility: (include floor
plans and layout of a typical experiment or operation) |
|||
|
|
|||
|
4. Authority
and Responsibility: |
|||
|
|
4.1 Who
has authority to implement/terminate |
||
|
|
|||
|
|
4.2 Who
is responsible for key tasks |
||
|
|
|||
|
5. Who
analyzes the special or unusual hazards (See ES&H Manual Chapter 3210 Appendix T1 Work Planning, Control, and
Authorization Procedure) |
|||
|
|
|||
|
6. Personal
and environmental hazard controls including: |
|||
|
|
6.1 Shielding |
||
|
|
|||
|
|
6.2 Interlocks |
||
|
|
|||
|
|
6.3
Other |
||
|
|
|||
|
7. Monitoring
systems |
|||
|
|
|||
|
8. Ventilation |
|||
|
|
|||
|
9. List of
safety equipment (i.e: personal protective
equipment or special tools) |
|||
|
|
|||
|
10. Associated
administrative procedures |
|||
|
|
|||
|
11. Operating
guidelines |
|||
|
|
|||
|
12. Notification
of Affected Personnel (How and Who) |
|||
|
|
|||
|
13. List of
steps required to execute the procedure from start to finish. |
|||
|
|
|||
|
14. Back out
procedures, i.e., steps necessary to restore the equipment/area to a safe
level. |
|||
|
|
|||
|
15. Special
environmental control requirements: |
|||
|
|
|||
|
16. Environmental
Impacts (See EMP-04 Project/Activity/Experiment Environmental
Review |
|||
|
|
|||
|
17. Abatement
Steps – Secondary Containment, or Special Packaging requirements |
|||
|
|
|||
|
18. Training
requirements |
|||
|
|
|||
|
19. Unusual/Emergency
procedures e.g., Injury, Fire, Loss of
power |
|||
|
|
|||
|
20. Instrument
calibration requirements, e.g., safety system/device recertification, RF
probe calibration |
|||
|
|
|||
|
21. Inspection
schedules |
|||
|
|
|||
|
22. References/Associated
Documentation |
|||
|
|
|||
|
23. List of
Records Generated (Include Location / Review and Approved procedure) |
|||
|
|
|||
|
|
|
|
|
Authorized/Trained Individuals
|
Print
Name/Signature |
Date |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ISSUING
AUTHORITY |
APPENDIX
AUTHOR |
APPROVAL
DATE |
EFFECTIVE
DATE |
EXPIRATION
DATE |
REV. |
|
|
|
|
ESH&Q Division |
10/05/09 |
01/01/10 |
10/05012 |
0 |
|