| DT # | Description | Date | Recipient |
| C581 | G Zero Octan 3 results | 03/10/2000 | S. Lassiter |
| C583 | G Zero Octan 2 results | 03/15/2000 | S. Lassiter |
| C584 | G Zero Octan 4 results | 03/16/2000 | S. Lassiter |
| C585 | G Zero Octan 1 results | 03/20/2000 | S. Lassiter |
| C704 | GEN01 Target move 30 Jul 2001 | 10/01/2001 | Donal Day, Marko Zeier |
| C705 | GEN01 Target probe survey 25 Sep 2001 | 10/03/2001 | Donal Day, Marko Zeier |
| C706 | G0 octant shim packs(initial set). | 10/09/2001 | S. Lassiter |
| C707 | GEN01 Target Can & target asfound survey 2001.10.10 | 10/10/2001 | Donal Day, Marko Zeier |
| C710 | G0 octant shim packs(2nd set). | 10/15/2001 | S. Lassiter |
| C713 | Line C GEN01 chicane move (TUNE UP) | 10/18/2001 | Donal Day, Jay Benish,Marco Zeier, Chen Yan |
| C714 | Line C GEN01 chicane/target move (3.481gev) | 10/30/2001 | Donal Day, Jay Benish,Marco Zeier, Chen Yan |
| C715 | HMS vacuum pipe | 11/02/2001 | Rolf Ent |
| C728 | Line C GEN01 chicane/target as found (3.481gev) | 01/04/2002 | Donal Day, Jay Benish,Marco Zeier, Chen Yan |
| C729 | G zero support rail heights. | 01/09/2002 | Lassiter |
| C732 | Line C chicane/target tune up position | 01/18/2002 | O. Rondon, M. Jones, (J. Benesch - email) |
| C733 | Line C chicane/90 degree position | 01/24/2002 | O. Rondon, M. Jones |
| C739 | Line C chicane/target tune up position | 02/14/2002 | O. Rondon, M. Jones, (J. Benesch - email) |
| C748 | Hall C polarized target shell | 03/13/2002 | M. Sealy, D. Day, O. Rondon |
| C749 | Line C chicane/target tune up position | 03/14/2002 | O. Rondon, M. Jones, (J. Benesch - email) |
| C763 | Hall C G0 target calibration. | 05/03/2002 | Silviu Covrig |
| C771 | Hall C Pivot Bolt Holes | 05/15/2002 | Bert Metzger |
| C774 | G0 octant alignment relative to FW. | 05/23/2002 | Philip Roos |
| C786 | Hall C target cool down. | 06/11/2002 | G. Smith, S. Covrig |
| C788 | Hall C pivot elevation | 06/19/2002 | B. Metzger |
| C797 | G0 Sealing surface and ring flatness inspection (dump) | 07/26/2002 | Steve Lassiter |
| C802 | Line C components for G0 | 08/22/2002 | J. Benesch, M. Spata, R. Ent, R. Carlini |
| C816 | Hall C dump viewer | 10/02/2002 | J. Benesch, M. Spata, S. Suhring |
| C821 | SOS rail survey. | 10/22/2002 | W. Kellner |
| C822 | Line C diagnostic girders. | 10/29/2002 | Benesch, Spata, Yan, Yun |
| C826 | HALL C G-ZERO components asfound | 11/01/2002 | Rolf Ent, Philip Roos |
| C846 | Line C components for G0 | 03/12/2003 | R. Ent, P. Ross, G. Smith |
| C851 | Hall C target survey | 04/04/2003 | D. Meekins, G. Warren, R. Ent |
| C852 | Diagnostic Girder Components | 04/07/2003 | M.Spata,R. Ent |
| C853 | HMS & SOS Pointings - Mar/Apr 2003. | 04/08/2003 | J. Reinhold, G. Warren, R. Ent |
| C877 | HMS & SOS Pointings July 2003. | 07/10/2003 | R. Ent |
| C894 | G0 target alignment and calibration | 09/10/2003 | S. Covrig, L. Hannelius |
| C896 | Tuna Can target post run survey | 09/11/2003 | D. Meekins, G. Warren, R. Ent |
| C898 | Pivot diagnostic girder survey | 09/17/2003 | M. Spata, R. Ent |
| C909 | G0 beamline diagnostics survey | 11/19/2003 | R. Ent, J. Yun, G. Smith |
| C919 | QWeak pre-collimator check measurements | 03/09/2004 | M. Fowler, P. Brindza |
| C929 | G0 beamline diagnostics post run survey | 05/24/2004 | R. Ent, J. Yun, G. Smith |
| C934 | Tuna can target survey | 06/17/2004 | D. Meekins, R. Ent |
| C935 | Pivot diagnostic girder and BPM survey | 06/18/2004 | R. Ent, M. Spata, A. Freyberger |
| C953 | Tuna can target survey | 09/20/2004 | D. Meekins, R. Ent |
| C955 | Dump viewer and Pavelometer survey | 09/20/2004 | E. Abkemeier, J. Benesch, M. Spata, S. Suhring |
| C965 | SOS drift chamber and Cerenkov alignment | 11/22/2004 | R. Ent, P. Bosted, M. Fowler, P. Medeiros |
| C973 | Enge slit collimator calibration | 01/21/2005 | L. Tang, M. Sumihama |
| C976 | Tuna can target post run survey | 01/31/2005 | D. Meekins, R. Ent |
| C977 | Pivot diagnostic girder post run survey | 02/01/2005 | R. Ent, M. Spata, A. Freyberger |
| C985 | Moeller Polarimeter survey | 04/07/2005 | C. Yan |
| C986 | Spool piece dictances around pivot | 04/12/2005 | C. Hutton |
| C992 | Dump viewer survey | 04/25/2005 | E. Abkemeier, A. Freyberger, N. Okay |
| C995 | HKS beamline diagnostics component survey | 06/01/2005 | R. Ent, M. Spata, A. Freyberger |
| C996 | HKS spectrometer surveys | 06/06/2005 | R. Ent, L. Tang |
| C997 | HKS viewer locations | 06/07/2005 | A. Bogacz, N. Okay, R. Ent, A. Freyberger |
| C1009 | Fission chamber offset | 09/19/2005 | W. Oren |
| C1010 | Fission chamber survey | 09/27/2005 | M. Spata, N. Okay, L. Tang |
| C1012 | Survey of Hall C cryo cans | 10/06/2005 | A. Guerra, R. Wolfley |
| C1015 | G0 Ferris Wheel support arm inspection | 10/17/2005 | B. Metzger |
| C1017 | G0 Mini Ferris Wheel octant inspection | 10/27/2005 | L. Lee |
| C1018 | G0 Mini Ferris Wheel shim survey | 11/01/2005 | B. Metzger |
| C1025 | G0 back angle FW octant locations | 12/01/2005 | L. Lee, D. Gaskell |
| C1046 | Line C component survey (d/strm of shield wall) | 03/08/2006 | D. Gaskell, N. Okay, J. Benesch, Y. Wang |
| C1048 | Line C component survey (d/strm of hall center) | 03/13/2006 | D. Gaskell, N. Okay, J. Benesch, Y. Wang |
| C1049 | G0 backangle SMS, Ferris Wheel and Target survey | 03/15/2006 | G. Smith, D. Gaskell, J. Benesch, Y. Wang |
| C1057 | G0 diagnostics and halo girder surveys | 05/08/2006 | D. Gaskell, N. Okay, J. Benesch, Y. Wang |
| C1059 | Cryo platform plate elevations | 05/22/2006 | N. Wilson |
| C1069 | G0 diagnostics components survey | 07/21/2006 | D. Gaskell, N. Okay, J. Benesch, Y. Wang, J. Grames |
| C1075 | HMS hut rail profile | 09/11/2006 | B. Metzger |
| C1076 | Hall C pivot diagnostics girder survey | 09/14/2006 | D. Gaskell, N. Okay, J. Benesch, Y. Wang, J. Grames |
| C1085 | Line C moeller polarimeter surveys | 11/13/2006 | D. Gaskell, R. Ent |
| C1104 | BigCal fiducialization | 03/16/2007 | C. Perdrisat |
| C1106 | G0 post run survey. | 04/20/2007 | D. Gaskel |
| C1109 | Locations of stands / flanges for bpm box replacement | 04/27/2007 | B. Miller, M. Wiseman |
| C1110 | Target/beam line survey. | 05/08/2007 | J. Benesch, N. Okay, D. Meekins, P. Solvignon |
| C1111 | HMS Pointings May 2007. | 05/14/2007 | P. Solvignon, S. Wood |
| C1114 | GEp-III focal plane polarimeter. | 06/01/2007 | F. Wesselmann |
| C1120 | Target survey. | 07/26/2007 | J. Benesch, N. Okay, D. Meekins, P. Solvignon |
| C1127 | Actual Laid out points for GEP experiment | 08/31/2007 | C. Perdrisat |
| C1129 | Moller Magnets in 3C line | 09/24/2007 | D. Gaskel, S. Wood, J. Benesch, Noel Okay |
| C1130 | HMS hut GEP detectors. | 10/08/2007 | F. Wesselmann, C. Perdrisat |
| C1134 | Line C diagnostics/target survey. | 10/30/2007 | S. Wood, M. Jones, D. Meekins, N. Okay |
| C1139 | HMS Pointings Oct 2007. | 11/06/2007 | M. Jones, S. Wood |
| C1142R | Big Cal detector 1st position. | 11/15/2007 | M. Jones, S. Wood |
| C1146 | Big Cal detector 2nd position. | 11/26/2007 | M. Jones, S. Wood |
| C1148 | Big Cal detector 3rd position. | 12/03/2007 | M. Jones, S. Wood, C. Perdrisat |
| C1152 | Big Cal detector -32.2 Deg. position. | 01/07/2008 | M. Jones, S. Wood, C. Perdrisat |
| C1153 | Big Cal detector -30.8 deg, -105.1 deg. positions. | 01/15/2008 | M. Jones, S. Wood, C. Perdrisat |
| C1159 | IHA3C07a-b Harp fiducialization/2b. | 03/07/2008 | A. Freyberger, S. Wood |
| C1161 | Sane cerenkov 2b | 03/25/2008 | M. Jones, E. Kaczanowicz, S. Wood |
| C1160 | Target survey. | 03/24/2008 | D. Meekins, N. Okay, S. Wood, M. Jones |
| C1167 | Big Cal detector -69 Deg. position. | 05/09/2008 | M. Jones, S. Wood, C. Perdrisat |
| C1167 | Big Cal detector -69 Deg. position. | 05/09/2008 | M. Jones, S. Wood, C. Perdrisat |
| C1169 | Big Cal detector -44 Deg. position. | 06/20/2008 | M. Jones, S. Wood, C. Perdrisat |
| C1171 | Hall C target post run survey. | 07/01/2008 | D. Meekins, N. Okay, S. Wood, M. Jones |
| C1178 | Hall C HMS collimator survey. | 08/11/2008 | M. Jones, S. Wood |
| C1188 | Check Survey of Sane Target Can | 10/16/2008 | M. Jones, D. Day, M. Seely |
| C1205 | Sane survey | 12/17/2008 | M. Jones, N. Okay, S. Wood |
| C1210 | Hall C diagnostics to target Z dist. | 01/12/2009 | M. Jones |
| C1203 | Floor Elevations | 11/24/2008 | B. Dillon-Townes, H. Park |
| C1213 | Sane target survey | 01/14/2009 | M. Jones, N. Okay, S. Wood |
| C1220 | Sane survey | 02/13/2009 | M. Jones, N. Okay, S. Wood |
| C1231 | HKS sieve calibration. | 06/16/2009 | T. Maruta, N. Nakamura |
| C1232 | HES sieve calibration. | 06/17/2009 | T. Maruta, N. Nakamura |
| C1232 | HES sieve calibration. | 06/17/2009 | T. Maruta, N. Nakamura |
| C1234 | HKS/HES target calibration. | 07/07/2009 | T. Maruta, N. Nakamura |
| C1222 | Sane girder calculation error | 03/05/2009 | M. Jones, N. Okay, S. Wood |
| C1236 | Hall C dump viewer. | 08/05/2009 | B. Dillon-Townes, S. Worthington |
| C1243 | Pivot/HKS girder survey results. | 09/04/2009 | M. Spata, N. Okay, R. Gonzales, N. Nakamura |
| C1244 | Qweak pump housing. | 09/22/2009 | J. Brock |
| C1247 | QTor coil analysis | 10/28/2009 | Greg Smith, Steve Wood, Karen Dow, Dave Gaskell |
| C1238 | HKS/HES survey results. | 08/17/2009 | T. Maruta, N. Nakamura, M. Spata, N. Okay |
| C1248 | HKS/HES target/splitter post run survey. | 11/10/2009 | T. Maruta, N. Nakamura |
| C1251 | HKS/HES sieve post run calibration. | 12/04/2009 | T. Maruta, N. Nakamura |
| C1250 | HKS/HES post run survey results. | 11/23/2009 | T. Maruta, N. Nakamura, M. Spata, N. Okay |
| C1265 | Line C moller collimator. | 03/03/2010 | D. Gaskell |
| C1260 | QTor all 8 coils step 1 check | 01/22/2010 | S. Wood, D. Gaskell, G. Smith, A. Kenyon |
| C1268 | Rotator position | 03/10/2010 | D. Gaskell, B. Sawatzky, A. Kenyon |
| C1269 | Line C moller collimator. | 03/11/2010 | D. Gaskell |
| C1274 | QTor all 8 coils step2b | 03/24/2010 | S. Wood, D. Gaskell, G. Smith, A. Kenyon |
| C1275 | Qweak target vacuum windows. | 03/26/2010 | S. Lassiter |
| C1283 | QTOR coil check (field mapping discrepancy) | 05/07/2010 | R. Carlini, W. Falk, S. Wood, D. Gaskell |
| C1298 | Hall C dump viewer | 07/06/2010 | J. Benesch, N. Okay, D. Gaskell |
| C1302 | Qweak scanner | 07/13/2010 | P. Wang, D. Gaskell, S. Wood |
| C1254 | QWeak QTor Frame Asfound / Check | 12/18/2009 | S. Wood, D. Gaskell, G. Smith, A. Kenyon |
| C1264 | Rotator feet movements | 02/25/2010 | A. Kenyon, D. Gaskell |
| C1282 | QTOR Lintel locations | 05/06/2010 | S.Wood, D.Gaskell, G. Smith, A. Kenyon |
| C1286 | QWeak Region 3 rotor repeatablity survey | 05/20/2010 | S. Wood, B. Sawatzky, D. Gaskell, A. Kenyon |
| C1288 | location of beam dump flange | 05/21/2010 | S. Worthington, B. Dillon-Townes |
| C1288 | location of beam dump flange | 05/21/2010 | S. Worthington, B. Dillon-Townes |
| C1291 | quartz detectors as of June 11 2010 | 06/04/2010 | D. Mack, D. Gaskell, S. Wood |
| C1292 | Beampipe Flanges QWeak DownStream of Ferris and dump flange | 06/18/2010 | B Dillion-Townes, S. Worthington, D. Gaskell |
| C1293 | QWeak Region 3 rotor repeatablity survey round 2 | 06/24/2010 | S. Wood, B. Sawatzky, D. Gaskell |
| C1295 | Qweak Collimators 1/2/3 Step2b | 06/30/2010 | S. Wood, G. Smith, D. Gaskell, D. Mack, B. Sawatzky |
| C1300 | QWeak BPMs / Harps from Q3C17 to QW Target | 07/08/2010 | J.Benesch, D. Gaskell, N. Okay |
| C1307 | Qweak Target Survey | 07/22/2010 | S. Woods, D. Gaskell, G. Smith, J. Dunne, S. Covrig |
| C1305 | Line C moller. | 07/16/2010 | D. Gaskell, S. Wood |
| C1321 | Qweak optics target cell offsets. | 09/28/2010 | G. Smith, S Covrig |
| C1325 | Qweak H target cell cell length. | 10/05/2010 | G. Smith, S Covrig |
| C1332 | Qweak target fiducials. | 10/12/2010 | J. Dunne |
| C1340 | Qweak Target Survey November 2010 | 11/05/2010 | S. Woods, D. Gaskell, G. Smith, J. Dunne, S. Covrig |
| C1329 | Qweak Target Survey October 2010 | 10/11/2010 | S. Woods, D. Gaskell, G. Smith, J. Dunne, S. Covrig |
| C1319 | QTor Lintel Locations after moved | 09/21/2010 | D.Mack, D. Gaskell |
| C1313 | QWeak quads/dipoles from Q3C17 to QE3M03 | 08/24/2010 | J.Benesch, D. Gaskell, N. Okay |
| C1346 | QWeak BPMs on Girder upstream of target | 11/11/2010 | J.Benesch, D. Gaskell, N. Okay |