DT # |
Description |
Date |
Recipient |
|
D1008 |
Scintillator Load Test. |
09/01/2005 |
P. Brindza |
D1096 |
Gluex detector prototype flatness. |
02/13/2007 |
D. Carman, S. Taylor, B. Kross |
D1177 |
Sag check on Pb barrel colorimeter |
07/31/2008 |
Tim Whitlatch |
D1204 |
Hall D GlueX detector profiler. |
12/08/2008 |
W. Crahen, B. Kross, M. Stevens |
D1245 |
Check on slab elevation and control on Hall D site |
10/13/2009 |
R.Yasky, T.Frye, T.Witherspoon, S.Chandra, T.Whitlatch |
D1246 |
Hall D solenoid coil inspections. |
10/21/2009 |
T. Carstens, F. Martin |
D1253 |
Check on Hall D slab elevation |
12/09/2009 |
R.Yasky, T.Frye, T.Witherspoon |
D1267 |
Check on photon control on Hall D site |
03/09/2010 |
R.Yasky, T.Frye, T.Witherspoon, T.Whitlatch |
D1281 |
Check on photon beampipe. |
04/30/2010 |
R.Yasky, T.Frye, T.Witherspoon, T.Whitlatch |
D1285 |
Check on Tunnel Extension mud slab elevation |
05/14/2010 |
C. Bitgood, T. Witherspoon, T. Whitlatch, R. Yasky |
D1294 |
Check on cyropipe penetrations |
06/29/2010 |
R.Yasky, T.Witherspoon, T.Whitlatch |
D1297 |
Check on solenoid pier plates |
07/06/2010 |
R.Yasky, T.Witherspoon, T.Whitlatch |
D1304 |
Second check on solenoid pier plates |
07/15/2010 |
R.Yasky, T.Witherspoon, T.Whitlatch |
D1310 |
Third check on solenoid pier plates |
08/17/2010 |
R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
D1311 |
Check on Tunnel Extension / Tagger floor elevation |
08/23/2010 |
C. Bitgood, T. Witherspoon, T. Whitlatch, R. Yasky |
D1312 |
Check on Tunnel Extension / Tagger walls |
08/23/2010 |
C. Bitgood, T. Witherspoon, T. Whitlatch, R. Yasky |
D1314 |
Fourth check on solenoid pier plates |
08/26/2010 |
R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
D1337 |
Final solenoid pier survey after concrete. |
10/29/2010 |
R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
D1347 |
Check on Hall D collimator area walls and floor |
11/16/2010 |
R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
D1348 |
Check on Hall D rail trenches. |
11/16/2010 |
R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
D1380 |
Check on Tagger photon beampipe |
02/17/2011 |
R.Yasky, C. Bitgood, T.Witherspoon |
D1381 |
Check on Hall D photon beampipe |
02/22/2011 |
R.Yasky, C. Bitgood, T.Witherspoon |
D1382 |
Second Check on Tagger photon beampipe |
03/04/2011 |
R.Yasky, C. Bitgood, T.Witherspoon |
D1383 |
Third check on Tagger photon beampipe (after concrete) |
03/17/2011 |
R.Yasky, C. Bitgood, T.Witherspoon |
D1392 |
Check on Hall D photon beampipe |
04/18/2011 |
R.Yasky, C. Bitgood, T.Witherspoon, T. Whitlatch |
|
|
|
|