| DT # | Description | Date | Recipient |
| D1008 | Scintillator Load Test. | 09/01/2005 | P. Brindza |
| D1096 | Gluex detector prototype flatness. | 02/13/2007 | D. Carman, S. Taylor, B. Kross |
| D1177 | Sag check on Pb barrel colorimeter | 07/31/2008 | Tim Whitlatch |
| D1204 | Hall D GlueX detector profiler. | 12/08/2008 | W. Crahen, B. Kross, M. Stevens |
| D1245 | Check on slab elevation and control on Hall D site | 10/13/2009 | R.Yasky, T.Frye, T.Witherspoon, S.Chandra, T.Whitlatch |
| D1246 | Hall D solenoid coil inspections. | 10/21/2009 | T. Carstens, F. Martin |
| D1253 | Check on Hall D slab elevation | 12/09/2009 | R.Yasky, T.Frye, T.Witherspoon |
| D1267 | Check on photon control on Hall D site | 03/09/2010 | R.Yasky, T.Frye, T.Witherspoon, T.Whitlatch |
| D1281 | Check on photon beampipe. | 04/30/2010 | R.Yasky, T.Frye, T.Witherspoon, T.Whitlatch |
| D1285 | Check on Tunnel Extension mud slab elevation | 05/14/2010 | C. Bitgood, T. Witherspoon, T. Whitlatch, R. Yasky |
| D1294 | Check on cyropipe penetrations | 06/29/2010 | R.Yasky, T.Witherspoon, T.Whitlatch |
| D1297 | Check on solenoid pier plates | 07/06/2010 | R.Yasky, T.Witherspoon, T.Whitlatch |
| D1304 | Second check on solenoid pier plates | 07/15/2010 | R.Yasky, T.Witherspoon, T.Whitlatch |
| D1310 | Third check on solenoid pier plates | 08/17/2010 | R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
| D1311 | Check on Tunnel Extension / Tagger floor elevation | 08/23/2010 | C. Bitgood, T. Witherspoon, T. Whitlatch, R. Yasky |
| D1312 | Check on Tunnel Extension / Tagger walls | 08/23/2010 | C. Bitgood, T. Witherspoon, T. Whitlatch, R. Yasky |
| D1314 | Fourth check on solenoid pier plates | 08/26/2010 | R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
| D1337 | Final solenoid pier survey after concrete. | 10/29/2010 | R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
| D1347 | Check on Hall D collimator area walls and floor | 11/16/2010 | R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
| D1348 | Check on Hall D rail trenches. | 11/16/2010 | R.Yasky, C. Bitgood, T.Witherspoon, T.Whitlatch |
| D1380 | Check on Tagger photon beampipe | 02/17/2011 | R.Yasky, C. Bitgood, T.Witherspoon |
| D1381 | Check on Hall D photon beampipe | 02/22/2011 | R.Yasky, C. Bitgood, T.Witherspoon |
| D1382 | Second Check on Tagger photon beampipe | 03/04/2011 | R.Yasky, C. Bitgood, T.Witherspoon |
| D1383 | Third check on Tagger photon beampipe (after concrete) | 03/17/2011 | R.Yasky, C. Bitgood, T.Witherspoon |
| D1392 | Check on Hall D photon beampipe | 04/18/2011 | R.Yasky, C. Bitgood, T.Witherspoon, T. Whitlatch |