Description Date
Bulletin No. 1. - Structural Steel Drawings only 3/15/2010
Bulletin No. 2. - Bentonite Waterproofing 4/1/2010
Bulletin No. 3. - Reissue Specifcation Sections & Drawings 4/9/2010
Bulletin No. 4. - Structural Steel Only 5/7/2010
Bulletin No. 5. - Misc Changes 5/25/2010
Bulletin No. 6. - Reissue Submittal Procedure Specifications 6/7/2010
Bulletin No. 7. - Misc Changes 6/16/2010
Bulletin No. 8. - Plumbing clarifications + CPA-0002 7/9/2010
Bulletin No. 9. - Civil Revisions at Guard House 7/13/2010
Bulletin No, 10 - Civil Utilities revisions 8/3/2010
Bulletin No. 12 - Pipe penetration at TL basement 8/3/2010
Bulletin No. 13 - Cast stone sill flashing 8/3/2010
Bulletin No. 15 - Plumbing and Fireprotection piping at PSB 8/10/2010
Bulletin No. 16 - List of eliminated submittals 8/11/2010
Bulletin No. 11 - North loading area revisions 8/13/2010
Bulletin No. 14 - Acid Waste Neutralization system & PSB 8/24/2010
Bulletin No. 19 - Elevator Spec Revisions 8/27/2010
Bulletin No. 18 - Storm Drain line revisions 9/3/2010
Bulletin No. 17 - AWN - Double containment piping scope 9/13/2010
Bullerin No. 20 - PSB door details 10/5/2010
Bulletin No. 21 - Added missing drawing TED-A3.2.3.13 10/5/2010
Bulletin No. 23 - Resolution for the Pump Transfer Vault elevation deficiency and pipes materials 11/22/2010
Bulletin No. 22 - Sanitary Sewer changes w/Force main 11/24/2010
Bulletin No. 24 - Revised roof screen wall framing detail 11/24/2010
Bulletin No. 25 - Structural changes that are required to accommodate the TK elevator 12/1/2010
Bulletin No. 27 - PSB exterior light fixtures 12/7/2010
Bulletin No. 26 - Interior, Roof & loading screens wall details, Plumbing and Electrical revisions 12/13/2010
Bulletin No. 28 - Clarifying the specification requirements for the storage and buffer tanks in the Process Chilled Water and Acid Chilled Water Systems 12/15/2010
Bulletin No. 29 - Cranes supports & Hilti fasteners 12/21/2010
Bulletin No. 18R - Revising Bulletin #18 and relocating Sediment Trap #1 12/22/2010
Bulletin No. 30 - Exterior doors & frames details 1/6/2011
Bulletin No. 31 - Communications Ductbank C-7 1/10/2011
Bulletin No. 32 - MEP Coordination 2/3/2011
Bulletin No. 35 - Civil Revisions 2/15/2011
Bulletin No. 34 - TED crane platform, PSA removable walls, & misc interior, mech. & elec. 2/16/2011
Bulletin No. 37 - Building 58 pipe rack 3/2/2011
Bulletin No. 36 - Assembly/Disassembly lines canopy revision 3/3/2011
Bulletin No. 33 - TED Enclosure Details 3/4/2011
Bulletin No. 39 - AWN ES/EW 3/8/2011
Bulletin No. 40 - Rain leader sleeve in TLA footing + Utilities valves in Corridor 1002 3/10/2011
Bulletin No. 43 - Revised feeder circuit breakers per Phase 2 design revisions and owner changes. 3/23/2011
Bulletin No. 41 - Loading dock screen wall foundation 3/24/2011
Bulletin No. 42 - Test Lab Section Details 3/31/2011
Bulletin No. 44 - MEP Coordination 3/31/2011
Bulletin No. 45 - Consolidated Set 4/1/2011
Bulletin No. 46 - Pump Transfer station sump pump 4/28/2011
Bulletin No. 47 - TED building 2nd floor modifications 5/24/2011
Bulletin No. 48 - Softener backwash piping & TLA exterior widows location 6/8/2011
Bulletin No. 49 - Revised Test Lab Pipe Rack 6/9/2011
Bulletin No. 52 - CP-S23 TLR EAST ELEVATION GIRT 6/9/2011

 

Construction Change Request

Description Date
CCR No. 10 - Site Bench Change 6/30/2011
CCR No. 15 - TED Window Jamb details and Drawing Clarifications 6/30/2011
CCR No. 16 - Bent Plate at Knock Out Panels 7/6/2011
CCR No. 17 - Add 2 each 20" Valves 7/6/2011
CCR No. 18 - Misc. RFI Responses 8/18/2011
CCR No. 19 - Not Issued
CCR No. 20 - Structural Steel Clarifications at the Test Lab Annex 7/21/2011
CCR No. 21 - T Trench removable partition type 7/27/2011
CCR No. 22 - Piping changes at T-Trench and Production and R&D Chemistry areas. 7/27/2011
CCR No. 23 - Not Issued
CCR No. 24 - Sidelight Framing Correction at the TED Building 8/2/2011
CCR No. 25 - Parking Lot Undercut 8/2/2011
CCR No. 26 - Parking Lot redesign for actual field conditions 8/3/2011
CCR No. 27 - EBW & Furnace Plenum 8/11/2011
CCR No. 28 - Atrium Edge Molding 8/11/2011
CCR No. 29 - Crane hanger detail & FP modification at Assembly lines 8/11/2011
CCR No. 30 - TED Display Wall & Specs 8/11/2011
CCR No. 31 - Owner Supplied Mailboxes 8/17/2011
CCR No. 32 - Added walls in the TED building 9/7/2011
CCR No. 33 - TED Lobby Clarification 9/27/2011
CCR No. 34 - UPW Water Rooms 9/28/2011
CCR No. 35 - VOID - See as-built for FDC location
CCR No. 36 - SAW Piping Change 10/13/2011
CCR No. 37 - Area G - Basement Plumbing 10/26/2011
CCR No. 38 -
CCR No. 39 -
CCR No. 40 -
CCR No. 41 -
CCR No. 42 -
CCR No. 43 - TED Lobby Graphics 10/25/2011
CCR No. 44 - Added Floor Drain at Chiller Building Addition 10/25/2011