Luminosity Runs
Run Number Ibeam Radiator Convertor TAC # Events
776 80pA A 5% C IN 1.7M
778 80pA A 5% C OUT 2M
779 230pA A 5% C OUT 2M
782 500pA A 5% C OUT 3.2M
783 2nA A 5% C OUT 10M
784 2nA A 5% C OUT 1.3M
797 80pA B 5% C IN 9.4M
799 10nA B 5% C OUT 10M
800 50nA B 5% C OUT 9.8M
801 100nA B 5% C OUT 6M
802 100nA B 5% C OUT 4M
803 75nA B 5% C OUT 1.3M
806 10nA B 5% C OUT 10M