Run Plan for August 2002 HyCal Prototype Test Run

  1. Tune photon beam
  2. Plateau pair spectrometer
  3. Plateau tagger
  4. Dipole scan
  5. Check and adjust gate timing with respect to MOR
  6. Check TAC health
  7. Luminosity scan: same plan as for last June.
  8. HyCal gain matching (setting the high voltage)
    1. Have MCC turn off the beam
    2. Use the 2x10**-4 radiator
    3. Retract the photon harp (no converter)
    4. Use the blank primex target
    5. Set up the MOR_20 trigger
    6. Ask MCC for beam current as low as possible (50 pA or lower)
    7. When beam is stable follow the following procedure for each crystal/block
      1. Center the beam on a crystal/block
      2. Take ? events
      3. Look at the ADC spectrum for the crystal/block
      4. Adjust the HV to bring the peak to ? counts
        • For the crystals, the slope is ? counts/V
        • For the block, the slope is ? counts/V
      5. Repeat until the peak is within ? counts of ? counts
      The order of crystals/blocks to be selected is listed at ?.
  9. HyCal Calibration (obtaining offline gain constants)
    1. Set up the beamline as was done for gain matching
    2. Start taking data
    3. Scan the beam over the entire HyCal detector. The scan route is described at ?
  10. Rate studies
    1. Trigger rate
      • Set up HyCal trigger
      • Scan beam intensity, taking data at each setting
        • note trigger rate
        • note dead-time level
    2. Accidental rates
      • Set up clock trigger
      • Scan beam intensity, taking data at each setting
  11. Transition point study
  12. Light monitoring system: see Sam's LMS run plan