Weekly Meeting Minutes - May 2, 2003


Attending: Dave L., Itaru, Ashot, Raphael, Abdellah, Eric, Yar, Mark, Dustin, Sam, Anatoly, Rafael, Doug, Dave K., Valeri
On Phone: Liping

Announcements:
Liping: Discussion of UNCW/APS meeting. Conclusion: one section of two 30-minute invited talks and eight to twelve 15-minute contributed talks. Please send ideas and opinions to lgan@jlab.org.
We also have a collaboration meeting that weekend (November 5-6-7).

Dave L: We received two more HV mainframes and several boxes of modules - they’re in the test lab area now.

Ashot: Bogdon’t HV and racks issue not resolved.

Doug: Safety and space issues raised about test lab area. Space is becoming premium and turnaround to the warehouse is a matter of hours, so don’t be shy about moving stuff there - even for a few weeks. The area is high profile and safety is a high concern - nothing goes on top of cabinets, no flammables without an appropriate cabinet, police your trash, etc.

Discussion of student workforce:
2 from A&T
2 from UNCW
2 from Uky (Aram on software + 1 other)
2 from UMass (Eric + 1 other)

Discussion of what to do with old cable. Upshot is try and give it back to Fermilab.

Mechanical:
Dave K.: Delay cable prototypes done and stainless steel tube ordered. Discussion of a spare bundle instead of a spare fiber in each bundle.
Installation plan done: the horizontal lifter is next, then tracks. All parts & tooling done.
Deck plans are at the second revision stage.
Some engineering & detailing in progress.

Hardware:
246 lead glass modules done (wrapped & soldered)
All pieces are in transit from UMass.
Cable length is 40 cm.
700 completed crystal assemblies, perhaps 100 need re-working.

Raphael: Wrapping test results and discussion of materials. Upshot: talk to Kashy about VM-2002 material and order in the next week or two.

Dave L: Presentation of HyCal-00 results (the 6x6 prototype currently in the hall). A new additional power supply will be ordered.
Pediatal sigmas. (458k PDF file)
Noise comparisons. (15k PDF file)

Yar: Discussion of LMS correction results.
LMS corrected values. (3k PDF file)
LMS corrected value deviation (3k PDF file)

Dustin: Investigating Compton effect on the gain.