Weekly Meeting Minutes - September 26, 2003


Attending: Ashot, Liping, Mark, Dan, Dustin, Dave L, Raphael, Yar, Keith, Eric, Dave, Mabub
Phone: Sam, Rory, Abdellah

Announcements:
Dan: Brazil conference recap.
Liping: Beam profile detactor software works.
Ashot: Vishnakov & Jouri got visas and will be here soon.
Ashot: Accelerator schedule will probably be shifted 4-6 weeks, but the readiness review will still be in mid-November.

Engineering:
Dave K: Deck being installed, done in a couple of weeks.
Cable test soon, after that the cart load test is scheduled.
Design continues for HyCal frame doors & cooling pipes.
Suggestions of test for leaks before stacking = unfeasable.
Target ladder fixed but needs to be tested; see Eric.

HyCal:
Dustin: Report on software status.
Discussion of cycling effects.
Discussion of upcoming test.
Mark: Motion control status.

Software:
Eric: Results of Veto Counter Monte Carlo Hole study (Transparencies)
Liping: Status of beam profile monitor.
Mabub: Discussion of TAC need for additional HV power supply.
Dan: Presentation of T-Counter calibration statistics.
Raphael: Presentation of pedestal analysis results.