Software Meeting Minutes - January 29, 2004
Present: Dustin McNulty, Mark Ito, Dave Lawrence, Rapheal Demirchyan, Eric Clinton, Rafael Hakobyan, Dan Dale, Marvin Payen, Aram Teymurazyan, Itaru Nagawara, and Arkadzi Talkachou
On Phone: Ashot Gasparian and Liping Gan
*** Report on Cluster definitions: work ongoing.
*** Primex clustering in tools directory--all types defined
*** Currently editing libraries to move from HYCAL-0 to HYCAL
*** Documentation forthcoming
Mark:
CUE linux systems will all go from 7.3 to RH Enterprise Linux 3.
Linking issues may need to be resolved. Mark volunteered.
Raphael:
*** HYCAL Cluster finding--involves several parameters
Noise--acceptable levels
size/dimensions
Emin
*** Described algorithm for iteratively analyzing clusters showed prelim results.
Dave:
*** Event viewer--for CH test run, can use MC data
*** HYCAL, Tagger working. Need TAC "guage" for tagger EV? Veto?
*** Trigger sim--8-10 Dave/man hours
*** Calibration monitoring program--10-20 mh
*** ET system event tagging--do we need it? if so, ~20 mh
*** tagger monitoring--probably Eric will do. 4-5 mh
*** HV monitoring-HYCAL and Veto well developed. Right click-look at bunch highlighted by mouse left click-look at single channel, group/board dependence 20 mh left for completion.
*** online scripts-working model present 8-10 mh.
*** et2et--part of tagger monitoring
*** epics2et--essentially done. needs integration into online scripts
****** total: 90-115 mh.
Eric
*** Tagger_calib modified, checked into CVS. Working.
*** Veto-calib: work in progress. generalizing to 12 VC
*** EPICS target ladder GUI new features:
single button for a single target.
current target highlighted
status of motor motion shown.
buttons show name of target.
*** Issue--include harp scan into GUI? Or develop new GUI?Scheduling Counting House test.
---March 3, next downtime. Beta test: look for holes/bugs in software.
---fix holes/bugs
---April 12 downtime--Alpha test: "Final test" Completion of online software.
Next meeting time and place:
February 12, Room A110 Cebaf Center, 1500 hrs