Light Monitoring System

Linearity test results as of April 25, 2003:


The file 0209_composite.dat is the collected results of the LMS during the August beam test. The LMS was running from July 30 through August 30. The LED pulse frequency was changed at 540 and 580 hours, and multiple times in the 600-660 hours time span.
One point combined (three minutes per plotted point):
2002-08-compose-stability1.jpg 2002-08-compose-stability2.jpg 2002-08-compose-stability3.jpg 2002-08-compose-ratios.jpg
2002-08-compose-pmt_pin.jpg 2002-08-compose-pin_over_pmt.jpg 2002-08-compose-widped.jpg 2002-08-compose-yap.jpg

Five points combined (fifteen minutes per plotted point):
2002-08-compose-stability1.jpg 2002-08-compose-stability2.jpg 2002-08-compose-stability3.jpg 2002-08-compose-ratios.jpg
2002-08-compose-pmt_pin.jpg 2002-08-compose-pin_over_pmt.jpg 2002-08-compose-widped.jpg 2002-08-compose-yap.jpg


Below is a list of files in the primex/subsystems/lms/files folder. Put your file in that directory and refresh this page to have it appear on the list. The files are shown in alphabetical order, so it may be useful to append "year-month-date" to your filename.

lms_lowvoltage4.ps
2001-08-10 upmt.ps
2001-08-10 time2.ps
lms_timing.ps
2001-08-10 pawpmt.ps
2001-08-10 time1.ps
2004_5_27.datyap.ps
ledfluctuations.ps
2004_5_27.datdetectors.ps
2004_5_27.datstability.ps
lms_lowvoltage2.ps
2001-08-10 time4.ps
2001-08-10 time3.ps
2001-08-10 pawpin.ps