Short summary of the Software technical
meeting
(2005-July-07).
Protocol
of the
Software technical
meeting
(2005-July-07).
1. Short questions:
- Errors in coding:
- DAQ error - Dave will
be available next week for discussion.
- Exceptions: Mark will
create procedure to work with exceptions.
2. The progress in Compton data analysis Summary: (Elena - see
note)
- The error
in alignment procedure was found.
- The
left-right asymmetry is smaller.
- We are
close to do Compton calibration.
- Need to
finish Elena staff.
- Add
vertical coordinate for minimizing Delta phi-180 difference.
- Need to compare with beam position
monitors (epics variables are really
important)
- Need to compare with harp scans
(another task for students)
3. New shower reconstruction algorythm and
chi^2 were introducted and discussed (see
note)
4. Cross-check and
organization of timing links Summary of
discussion:
- The
cluster-cluster and cluster-tagger links must be modified. Vasily and
Dustin will think about it and will propose new structure and
organization.
- It is beteer
to use this (cluster-cluster and cluster-tagger) functionality in
different manner:
- use it
inside hist_fill routine or
- to have
configuration file for user to change required parameters and/or cuts
for timing selection.
5. Error flags (representative from each
detector)
Nothing new from other groups.
6. Planning summary:
- continue
work with Compton - prepare for Compton Calibration (Elena)
- coordinate
resolution (Kelly)
- shower leakage outside (inside) detector (Vasily)
- study of epics data (beam position
monitors) (Dustin and students)
- send the E-mail to Aram (Dan) to
introduce functions to work with Aram analysis.