Protocol of the software
technical
meeting
(2005-August-04).
Participants:
Raphael, Dustin, Ashot, Mark, Mike, Aram, Eric, Kelly,
Laray, Liping, Kevin, Vasily
1. Final organization of timing
links (Vasiliy)
approved - Vasiliy will put on cvs next week
2. Retcode flags from different processes
(Vasiliy, Mark)
tagger, veto, veto2hycal, timing_links,
parseROCFASTBUS
It was decided,
that each person, introducing the retcode will change the bank and
do changes in PEvent (see example for
hycal, introduced by Mark)
3. Introducing Exceptions (Mark) - not discussed
4. Tagger energy correction
(Eric)
Eric will
prepare comparison between previous and current reconstruction
functions for counters. It should be smooth and close to Stepan picture.
Eric also will check energy from Hall C, compare it
with Accelerator division monitors and present to collaboration.
5. PFlux modifications (Aram)
approved
6. PrimEx cut Configuration (Aram,
Mark)
the strategy was approved. Aram will
prepare the example and first real function for PFlux.
7. MC study (Mike)
Mike informed that he will introduce actual geometry in PrimSim MC
program.