Weekly Minutes 2007-11-16

From PrimExWiki

Weekly Meeting Minutes - Nov 16, 2007

Meeting Agenda


Attending: Ashot Gasparian, M. Ito, L. Jiang, X. Li, P. Ambrozewicz, Dan Sober
By phone:
none

  • Meeting Page (with agenda).
  • Review of last meeting minutes:
    • Tulio's Note: Tulio's Incoherent Production Note is now available.
    • PAC Proposal:
      • It was argued by the MIT group, voiced by Aron.
      • Ashot, on the other hand, fully supports going to this last 6 GeV PAC. His views in this respect haven't changed for past 3 years. Ashot's response to the above was in regard with two points. Mark gave comments on several issues. Dan gave remarks.
    • Collaboration Meeting:
      • No collaboration meeting for now, we should focus on the proposal.
    • Announcements:
      • Sergey got the visa and will be here for two months, beginning sometime in Novemeber.
      • Ilya will come for 6 months, maybe in November, but his coming here is not yet well defined.
  • Compton status: Pawel
    • Pawel introduced Compton status, which includes extraction procedure, line shape yield fits, total cross section, forward cross section, systematic uncertainties, entire HyCal cross section and Compton beam time estimate.
    • Mark's comments for the forward cross section calculation formular: The yield of data and MC should be normalized, and sigma_data should be calculated.
    • Ashot: In those cuts delta phi cut should be used, it's arbitary that elasticity cut is set to 1.
    • Pawel: For the background, it should use line shape yidld fits. And the acceptance cuts should be same with those cuts, so the elasticity cut can be set to 1.
    • For targets in next runs,
      • Ashot: is there a good reason to change the targets?
      • Mark: in carbon, calculation control is easy;
      • Dan: we know those targets everthing, and programs for them are there.So we'd better don't change all the targets for decreasing systematical error(from 2% to 1%?).
    • For statistics and systematical error, Mark and Ashot suggested several points should be considered: do we have 1.5% error in 4PI and how to claim the error? Time and energy dependence and the deviation should be considered.
  • Some results of Resolution Study: Liyang

Time was not enough, and Ashot will talk with Liyang after the meeting.