DRAFTv12, March 7, 2007
Run plan as of March 25: here
Run plan as of March 22: here
Run plan as of March 19: here
Run plan as of March 15: here
Run plan for March 11 - March 18: here
Coulomb goal vs Coulomb measured:
current results
First pass analysis: here
Target configurations from D. Meekins, here.
Aperture scan halog entry :
http://www.jlab.org/~adaq/halog/html/0703_archive/070303174342.html
From the aperture scan at 2 pass on the carbon target the target center is (-4.0,2.0) in mm = (BPMBx,BPMBy)

Run Plan for 4 pass beam - Starts with optics studies for HRSL, 17 hours
Start with internal sieve slit out, HRSR is still at 12.5 deg, negative polarity
run
Target
Energy
 MeV
Current
 uA
Mom
 HRSL
Theta_e 
deg
Mom 
HRSR
Theta_p
deg
comment
Time hr
Establish
the right
MCC
raster
settings to
give
4x6 mm
raster at
target

Turn on
Raster









12C
2649

2635
12.5
0 neg
12.5

0.5
Cycle	Q2
and Q3	
HRSL

And
Raster
Is both
Off/On
 
 
1


 
2740n
12.5


HRSL optics +4%
0.5
2
 
 
 
2714
 
 
 
+3%
0.5
3
 
 
 
2688
 
 
 
+2%
0.5
4
 
 
 
2661
 
 
 
+1%
0.5
5
 
 
 
2635
 
 
 
0%
0.5
6



2609



-1%
0.5
7
 
 
 
2582
 
 
 
-2%
0.5
8
 
 
 
2556
 
 
 
-3%
0.5
9
 
 
 
2530
 
 
 
-4%
0.5
Insert
internal
Sieve
And
Cycle
Quads
HRSL
 Turn off 
 Raster
0.5
10
 
 
 
2740n
 
 
 
HRSL optics +4%
0.5
11
 
 
 
2714
 
 
 
+3%
0.5
12
 
 
 
2688
 
 
 
+2%
0.5
13
 
 
 
2661
 
 
 
+1%
0.5
14
 
 
 
2635
 
 
 
0%
0.5
15
 
 
 
2609
 
 
 
-1%
0.5
16
 
 
 
2582
 
 
 
-2%
0.5
17
 
 
 
2556
 
 
 
-3%
0.5
18
 
 
 
2530
 
 
 
-4%
0.5
take out
internal
sieve
slit


 
 
 
0.5
Cycle
quads
HRSL
 start	12C
 Iscan
 raster is
 off
 
 
 
19
 
 
 5
2635
 
 
 
0%
0.5
20
 
 
10

 
 
 

0.5
21


20





0.5
22


40





0.5
23


60





0.5
24


80





0.5
25


100





0.5
Turn
Raster
On
and
Cycle
HRSL  
Quads
 
 
 
Put 
In 
Lead
Target
 for Iscan
 
 
 
 
0.5
26
208Pb

5
2649n
12.5



0.5
27


10





0.5
28


20





0.5
29


40





0.5
30


60





0.5
31


80





0.5
32

 
100


 
 
Elastic
Normalization
 q=2.92/F
1
 Make access to the hall to move the spectrometers to the correct angles and to change the polarity on HRSR to positive
DATA, run times = 243 hours, sieve slits are out
run
Target
Energy
MeV
Current
 uA
Mom 
HRSL
Theta_e
 deg
Mom
 HRSR
Theta_p
 deg
Raster 
Comment
Time or
 counts(0 to 5MeV
 in emiss
 for Pb) hr/counts
1
12C
2649
100
2216n
21.44
989p
54.10
on
Kin01, pm = 0
1
2
208Pb
 
 
 
 
 
 
 
 
1/92.5K
3
209Bi
 
 
 
 
 
 
 
Bismuth counts
 are for 0 to
 2.2MeV in 
emiss
4.5/100
TBD
Cycle
Quads
On
HRSR
 
 
 
 
 
 
1.5
4
12C
 
 
1902
30.59
1390
43.73
 
Kin12, pm = 0,
 q=1.4 GeV/c
1/10K
5
208Pb
 
 
 
 
 
 
 
 
5.5/10K
Cycle
Quads
On
HRSR
 
 
 
 
 
 
1.5
6
12C
 
 
1602
39.72
1741
35.86
 
Kin13, pm = 0,
 q = 1.74
4/10K
7
208Pb
 
 
 
 
 
 
 
 
19.5/10K
Cycle
Quads
On
HRSL
 
 
 
 
 
 
 
8
208Pb
 
 
2649
12.5
989
 
 
Elastic Pb 
target check
1.5
9
208Pb
 
 
2216
21.44
989
54.10
 
Repeat pm=0
 for Pb
1/92.5K
10
208Pb
 
 
 
 
 
59.83
 
Kin02, 
pm = +100
6.0/357K
11
12C
 
 
 
 
 
 
on
 
1.
12
12C
 
 
 
 
 
 
off
Get ee’p with
 raster on and
 off
0.5
13
209Bi
 
 
 
 
 
 
on
 
1.5/690
14
208Pb
 
 
 
 
 
48.37
 
Kin03, 
pm = -100
5/227K
15
12C
 
 
 
 
 
 
 
 
1
16
209Bi
 
 
 
 
 
 
 
 
1.5/450
Cycle
Quads
On
HRSL
 
 
 
 
 
 
 
17
208Pb
 
 
2649
12.5
 
 
 
Elastic Pb
 target check
1.5
18
208Pb
 
 
2216
21.44
 
65.26
 
Kin04, 
pm = +200
6/318K
19
12C
 
 
 
 
 
 
 
 
1.5
20
209Bi
 
 
 
 
 
 
 
Emiss profile
 Measurement
 on 209Bi
24.5/66K
21
208Pb
 
 
 
 
 
42.58
 
Kin05,
 pm = -200
4.6/93.5K
22
12C
 
 
 
 
 
 
 
 
1.5
23
209Bi
 
 
 
 
 
 
 
 
1.5/1.3K
24
208Pb
 
 
 
 
 
71.44
 
Kin06, 
pm = +300
12/31K
25
12C
 
 
 
 
 
 
 
 
1.5
26
209Bi
 
 
 
 
 
 
 
 
2.5/400
Cycle
Quads
On
HRSL
 
 
 
 
 
 
 
27
208Pb
 
 
2649
12.5
 
 
 
Elastic Pb 
target check
1.5
28
208Pb
 
 
2216
21.44
 
36.76
 
Kin07,
 pm = -300
9/12K
29
12C
 
 
 
 
 
 
 
 
1.5
30
209Bi
 
 
 
 
 
 
 
 
2.5/100
31
208Pb
 
 
 
 
 
77.30
 
Kin08,
 pm = +400
20.5/3.4K
32
12C
 
 
 
 
 
 
 
 
1.5
Cycle
Quads
On
HRSL
 
 
 
 
 
 
 
33
208Pb
 
 
2649
12.5
 
 
 
Elastic Pb 
target check
1.5
34
208Pb
 
 
2216
21.44
 
83.23
 
Kin10, 
pm = + 500
24.5/340
35
12C
 
 
 
 
 
 
 
 
1.5
Cycle
Quads
On
HRSL
 
 
 
 
 
 
 
36
208Pb
 
 
2649
12.5
 
 
 
Elastic Pb 
target check
1.5
37
208Pb
 
 
2216
21.44
 
30.90
 
Kin09,
 pm = -400
30.5/3.1K
38
12C
 
 
 
 
 
 
 
 
2.5
Cycle
Quads
On
HRSL
 
 
 
 
 
 
 
39
208Pb
 
 
2649
12.5
 
 
 
Elastic Pb 
target check
1.5
40
208Pb
 
 
2216
21.44
 
24.98
 
Kin11,
 pm = -500
24.5/300
41
12C
 
 
 
 
 
 
 
 
1.5
Cycle
Quads
On
HRSL
 
 
 
 
 
 
 
42
208Pb
 
 
2649
12.5
 
 
 
Elastic Pb 
target check
1.5
Time permitting we can do additional runs for:
improved statistics on Bi
Bi at 400 MeV/c
improved statistics on Pb
measure lead at pmiss = 0 with sieve slit in for optics studies